Ack Receipt of Forwarding Results of Visual Insp to Verify Pressurizer Integrity in Response to Concerns Expressed in NRC Re Pressurizer Cald Cracking. Results of Insp Acceptable
ML13317B213
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/05/1990
From: Tatum J
Office of Nuclear Reactor Regulation
To: Ray H
Southern California Edison Co
References
NUDOCS 9011070299
Download: ML13317B213 (2)


Text

November 5, 1990 Docket No. 50-206 Mr. Harold B. Ray Senior Vice President Southern California Edison Company Irvine Operations Center 23 Parker Street Irvine, California 92718

Dear Mr. Ray:

SUBJECT:

VERIFICATION OF PRESSURIZER INTEGRITY - SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 We have received your letter dated October 19, 1990, which provides the results of your visual inspection of the pressurizer for San Onfore Nuclear Generating Station, Unit No. 1 (SONGS-1). Your inspection was performed in response to concerns that we expressed to you in a letter dated July 30, 1990, regarding pressurizer clad cracking. Based on your inspection results, you have concluded that clad cracking has not occurred in the SONGS-1 pressurizer and that the integrity of the pressurizer remains intact.

The purpose of this letter is to acknowledge your responsiveness in addressing our concerns, as we recognize that your inspection of the SONGS-1 pressurizer was not a trivial matter. We' are satisfied by the results of your inspection and have no further questions in this regard.

Sincerely, Original signed By James E. Tatum, Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION Docket File NRC & LPDRs JTatum (2)

MVirgilio DFoster OGC PD5 Plant File EJordan BGrimes ACRS (10)

RHermann MHum OFC

DRSP/LA/ ~5
DRSP/P
DRSP/(A)D:PD5:

R I;ic NAME

DFoster
sg
JDyer V--

y-


-- ----------- :--------------:---------.0.

DATE :1/ f90

/2/90
/7/90 0

OFFICIAL RECORD COPY Document Name:

SO1 LTR 9011:t070299 9501.105 0

PDR ADOCK 0500020 1_-

PDC 4

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Unit No. 1 cc:

David R. Pigott, Esq.

Mr. Richard J. Kosiba, Project Manager Orrick, Herrington & Sutcliffe Bechtel Power Corporation 600 Montgomery Street 12440 E. Imperial Highway San Francisco, California 94111 Norwalk, California 90650 Mr. Robert G. Lacy Mr. Phil Johnson Manager, Nuclear Department U.S. Nuclear Regulatory Commission San Diego Gas &- Electric Company Region V P. 0. Box 1831 1450 Maria Lane, Suite 210 San Diego, California 92112 Walnut Creek, California 94596 Resident Inspector, San Onofre NPS c/o U.S. Nuclear Regulatory Commission P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente,'California 92672 Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Regional Administrator, Region V U.S. NuNclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. John Hickman Senior Health Physicist Environmental Radioactive Mgmt. Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814 (10)