APR 1 5 1988
Docket Nos. 50-206, 50-361, 50-362
Southern California Edison Company
P. 0..Box 800
2244 Walnut Grove Avenue
Rosemead, California 92770
Attention:
Mr. Kenneth P. Baskin, Vice President
Nuclear Engineering Safety and Licensing
Gentlemen:
This refers to the routine inspection conducted by Messrs. F. R. Huey, J. E.
Tatum, and A. L. Hon of this office during the period of January 17 through
February 27, 1988 of activities authorized by NRC License Nos. DPR-13, NPF-10
and NPF-15 and to the discussion of our findings held by the inspectors with
Mr. C. B. McCarthy and other members of the Southern California Edison staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this Notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In addition to the apparent violations that have been cited in this inspection
report, the circumstances which resulted in a number of steam generator code
safety valves being inoperable on Units 2 and 3 (discussed in paragraph 9 of
this report) are of concern to the NRC. Poor engineering work and inadequate
review apparently culminated in this condition, and it was fortuitous that a
significant safety issue did not develop. Your attention is warranted to
ensure that all aspects of engineering work are being properly conducted.
In accordance with 10 CFR 2.790(a), a copy of this letter, the enclosure, and
your response will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
88104290299 830415
ADOCK 050002065
Q
~DCDI
-2-
A
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
R. P. Zimmerman, Chief
Reactor Projects Branch
Enclosures:
2.
Inspection Reports
Nos. 50-206/88-03
50-361/88-03
50-362/88-03
cc w/Enclosures:
D. J. Fogarty, Executive Vice President
C. B. McCarthy, Jr., Vice President -
Site Manager (San Clemente)
H. E. Morgan, Station Manager (San Clemente)
State of California
bcc w/enclosure:
Project Inspector
Resident Inspector
docket file
G. Cook
A. Johnson
B. Faulkenberry
J. Martin
D. Persinko, NRR
bcc w/o enclosure 2:
LFMB
M. Smith
Allegation File (ATS RV-87-A-084) (Report cover page and Paragraph 1O.d only)
Edward Baker, NRR (Report cover page and Paragraph 11)
James Conway, NRR (Report cover page and Paragraph 11)
REGION V/dot
AHon
vJTitum
RHu
P
n
AJ
nson
4/2. /8
-4/:
/88
4 44 /884
4/
f/88
,RbST Copy ],REQUEST COPY ]
T COP ]E QEST COPY ] REQUEST GY ]
Y,ES
/
NO J YES
/
NO
] YES
NO
] YES\\ /NO
]YES
//'NO
]
RZimmerman 4/15/88
REQUEST COPY ]
SEND TO PDR ]
YES
/(NO)
]
/YES
/
NO
]