JAN 1 9 1988
Docket Nos. 50-206, 50-361, 50-362
Southern California Edison Company
P. 0. Box 8800
2244 Walnut Grove Avenue
Rosemead, California 92770
Attention: Mr. Kenneth P. Baskin, Vice President
Nuclear Engineering, Safety, and Licensing
Gentlemen:
Subject: Report of Meeting with SCE Management
This refers to a meeting held with you, Mr. H. B. Ray, Mr. C. B. McCarthy,
Jr., and other members of the SCE staff at the San Onofre site on December 15,
1987.
The subjects discussed are summarized in the enclosed report. A copy
of the meeting agenda is also enclosed.
At this meeting we discussed areas of current NRC concern, recent performance
indicators for San Onofre, and significant activities planned for 1988. The
meeting also provided an opportunity to meet with Mr. McCarthy, the recently
assigned Vice President and Site Manager. During the meeting we commented on
improvements SCE has realized in plant operational performance during the past
year.
As discussed further in the enclosed report, we emphasized the following
principal areas of current NRC concern:
Conduct of Technical an Engineering work including maintenance of a
complete and well understood record of the plants' design basis, including
changes that have been made since operation began. Recent inspection
results at Region V facilities, including limited findings at San Onofre,
indicate this to be an area requiring additional attention.
Continuing thorough and critical self-evaluation of your performance by
your management. We also encouraged you to look closely at the support
provided by your various safety oversight groups (QA/QC, Nuclear Safety
Group, Independent Safety Engineering Group, and Onsite Review Committee)
in assessing your staff's performance and identifying potential problem
areas.
We intend to focus more attention on these areas during the coming year, and
advise SCE to do the same.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room.
elSO203O~b 880119
PDR ADOCK 05000206
0
-2-
JAN 19 988
Should you have any questions concerning this letter or the issues discussed
in the enclosed report, we will be pleased to discuss them with you.
J. B. Martin
Regional Administrator
Enclosures:
1. Report Nos. 50-206/87-32, 50-361/87-34, and 50-362/87-34
2. Meeting Agenda
cc w/enclosures:
D. J. Fogarty, Executive Vice President
H. B. Ray, Vice President
C. B. McCarthy, Vice President -
Site Manager
H. E. Morgan, Station Manager
bcc w/enclosures:
docket file
State of California
Resident Inspector
Project Inspector
G. Cook
B. Faulkenberry
J. Martin
Drew Persinko, NRR
bcc w/o enclosures:
LFMB
M. Smith
RVt
RZi
ir~~
PJ
n:jb
RZimmerman
AChaffee
DKirsch
JMartin
O1/
8
01/15/88
01/i /88
01//5/88
01/ /88
, Q ST COPY ]
EKEST COPY ]
ST COPY]
QUEST COPY ] REQUEST COPY]
YES!
NO
]E/
NO
S/
NO
]
ES / NO
]YES / NO
]
ES/NO