Forwards Meeting Repts 50-206/87-32,50-361/87-34 & 50-362/87-34 on 871215 & Meeting Agenda.Areas of Concern Discussed:Recent Performance Indicators for San Onofre & Significant Activities Planned for 1988
ML13316B851
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/19/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13316B852 List:
References
NUDOCS 8802030086
Download: ML13316B851 (2)


See also: IR 05000206/1987032

Text

JAN 1 9 1988

Docket Nos. 50-206, 50-361, 50-362

Southern California Edison Company

P. 0. Box 8800

2244 Walnut Grove Avenue

Rosemead, California 92770

Attention: Mr. Kenneth P. Baskin, Vice President

Nuclear Engineering, Safety, and Licensing

Gentlemen:

Subject: Report of Meeting with SCE Management

This refers to a meeting held with you, Mr. H. B. Ray, Mr. C. B. McCarthy,

Jr., and other members of the SCE staff at the San Onofre site on December 15,

1987.

The subjects discussed are summarized in the enclosed report. A copy

of the meeting agenda is also enclosed.

At this meeting we discussed areas of current NRC concern, recent performance

indicators for San Onofre, and significant activities planned for 1988. The

meeting also provided an opportunity to meet with Mr. McCarthy, the recently

assigned Vice President and Site Manager. During the meeting we commented on

improvements SCE has realized in plant operational performance during the past

year.

As discussed further in the enclosed report, we emphasized the following

principal areas of current NRC concern:

Conduct of Technical an Engineering work including maintenance of a

complete and well understood record of the plants' design basis, including

changes that have been made since operation began. Recent inspection

results at Region V facilities, including limited findings at San Onofre,

indicate this to be an area requiring additional attention.

Continuing thorough and critical self-evaluation of your performance by

your management. We also encouraged you to look closely at the support

provided by your various safety oversight groups (QA/QC, Nuclear Safety

Group, Independent Safety Engineering Group, and Onsite Review Committee)

in assessing your staff's performance and identifying potential problem

areas.

We intend to focus more attention on these areas during the coming year, and

advise SCE to do the same.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

elSO203O~b 880119

PDR ADOCK 05000206

0

PDR

-2-

JAN 19 988

Should you have any questions concerning this letter or the issues discussed

in the enclosed report, we will be pleased to discuss them with you.

J. B. Martin

Regional Administrator

Enclosures:

1. Report Nos. 50-206/87-32, 50-361/87-34, and 50-362/87-34

2. Meeting Agenda

cc w/enclosures:

D. J. Fogarty, Executive Vice President

H. B. Ray, Vice President

C. B. McCarthy, Vice President -

Site Manager

H. E. Morgan, Station Manager

bcc w/enclosures:

docket file

State of California

Resident Inspector

Project Inspector

G. Cook

B. Faulkenberry

J. Martin

Drew Persinko, NRR

bcc w/o enclosures:

LFMB

M. Smith

RVt

RZi

ir~~

PJ

n:jb

RZimmerman

AChaffee

DKirsch

JMartin

O1/

8

01/15/88

01/i /88

01//5/88

01/ /88

, Q ST COPY ]

EKEST COPY ]

ST COPY]

QUEST COPY ] REQUEST COPY]

YES!

NO

]E/

NO

S/

NO

]

ES / NO

]YES / NO

]

ES/NO