0Fpj oUNITED STATES All NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 100 License No. DPR-13
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensee) dated October 15, 1986 complies with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
P105040123 680426 PDR ADOCK 05 o
OWo P
-2
- 2. Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment, and paragraph 3.B. of Provisional Operating License No. CPR-13 is hereby amended to read as follows:
B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 100, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications, except where otherwise stated in specific license conditions.
- 3. This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION George W.
Knighton, Director Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: April 26, 1988
April 26, 1988 ATTACHMENT TO LICENSE AMENDMENT NO.100 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by the captioned amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 43a 43a
-43a TAELE 4.1.2 (continuEdc Check Frequency lb.
Secondary
- 1. Gross Activity At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Coolant Determination Pequired only during Samples Modes 1, 2, 3 and 4.
- 2.
Isotopic Analy-a) 1 pEr 31 days, whenever sis for DOSE the gross activity EOUIVALENT 1-131 determination indicates Concentration iodine concentrations greater than 10% of the allowable limit.
Pequired only during Modes 1, 2, 3, and 4.
b) 1 per 6 months, whenever the gross activity determination indicates iodine concentrations below 101 of the allow able limit. Required only during Modes 1, 2, 3, and 4.
- 2. Safety
- a. Boron Concentration Monthly when the Injection reactor is critical Water Samples and prior to return of criticality when a period of subcriti cality extends the test interval beyond 1 month.
- 3. Control Rod
- a. Verify that all rods At each refueling Drop move from full out to shutdown full in, in less than 2.44 seconds.
- 4. (Deleted)
- 5. Pressurizer
- a. Pressure Setpoint At each refueling Safety Valves shutdown Amendment No. 79, H, 70, 04, 100