Forwards Ser,Technical Evaluation Rept & Exemption from Certain Requirements of 10CFR50,App R,Section Iii.G Re 10 Fire Area/Zones Outside Containment Where Fire Detection & Fixed Fire Suppression Sys Not Installed
ML13316A930
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/27/1986
From: Lear G
Office of Nuclear Reactor Regulation
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13316A931 List:
References
NUDOCS 8607090432
Download: ML13316A930 (2)


Text

b JUN2 7 1986 Docket No.:

50-206 Mr. Kenneth P. Baskin, Vice President Nuclear Engineering Safety and Licensing Department Southern California Edison Company 2244 Walnut Grove Avenue P.O. Box 800 Rosemead, California 91770

Dear Mr. Baskin:

SUBJECT:

EXEMPTION FROM CERTAIN REQUIREMENTS OF 10 CFR PART 50, APPENDIX R, SECTION III.G - SAN ONOFRE NUCLEAR GENERATING STATION,-UNIT NO. 1 By letters dated October 4 and December 31, 1985, April 23, May 12 and May 30, 1986, you requested exemptions for San Onofre Unit 1 from the technical requirements of 10 CFR Part 50, Appendix R, Section III.G. This request involves ten fire areas/zones outside containment where fire detection and fixed fire suppression systems have not been installed throughout the area and a similar request inside the containment for a single fire area. The area in side containment contains dedicated shutdown panel instruments that are not independent of the fire area under consideration.

In addition, an exemption from the technical requirements of III.G.2 was requested for four fire zones in areas outside containment without area-wide automatic fire detection and suppression systems.

Based on the enclosed staff safety evaluation and technical evaluation report prepared by the staff's contractor, the Commission has granted your exemption request pursuant to 10 CFR Part 50.12. The exemption is effective as of the date of this letter. The enclosed exemption and safety evaluation are being forwarded to the Office of the Federal Register for publication.

Original signed byA Sincerely, George E. Leag George E. Lear, Director PWR Project Directorate #1 Division of PWR Licensing-A

Enclosures:

1. Exemption
2. Safety Evaluation cc: See Next Page
  • SEE PREVIOUS CONCURRENCE Office:

LA/PAD#1 PM/PAD#1 PM/PAD#1 PD/PAD#1 OELD DIR/DPLA Surname: *PShuttleworth *MFairtile*RDudley *GLear

  • WShields *TNovak Date:

06/27/86 06/26/86 06/27/86 06/27/86 06/27/86 06/27/86 8607090432 860627 PDR ADOCK 05000206 F

PDR

Mr. Kenneth P. Baskin San Onofre Nuclear Generating Station Southern California Edison Company Unit No. 1 cc I

Charles R. Kocher, Assistant Joseph 0. Ward, Chief General Counsel Radiological Health Branch James Beoletto, Esquire State Department of Health Southern California Edison Company Services Post Office Box 800 714 P Street, Office Bldg. 8 Rosemead, California 91770 Sacramento, California 95814 David R. Pigott Mr. Hans Kaspar, Executive Director Orrick, Herrington & Sutc-liffe Marine Review Committee, Inc.

600 Montgomery Street 531 Encinitas Boulevard, Suite 105 San Francisco, California 94111 Encinitas, California 92024 Mr. Stephen B. Allman San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS co U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 Director Energy Facilities Siting Division Energy Resources Conservation &

Development Commission 1516 - 9th Street Sacramento, California 95814 Regional Administrator, Region V U.S. Nuclear Regulatory Commission 1450 Maria Lane Walnut Creek, California 94596