Forwards Amend 19 to Topical Rept SCE-1-A, Quality Assurance Program. Encl II Includes Summary of Changes Introduced in Topical Rept SCE-1-A,amend 19 as Compared to Amend 18
ML13316A251
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/13/1998
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML13316A253 List:
References
NUDOCS 9801150120
Download: ML13316A251 (2)


Text

SOUTHERN CALIFORNIA

' E I N.

L.

Rainsberry JE DI Manager, Plant Licensing An EDISON INTERNATIONAL" Company January 13, 1998 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361, and 50-362 Quality Assurance Program Description San Onofre Nuclear Generating Station Units 1, 2, and 3

Reference:

SCE (J. L. Rainsberry) to NRC (Document Control Desk) letter dated December 11, 1996,

Subject:

Quality Assurance Program Description, San Onofre Nuclear Generating Station Units 1, 2, and 3 As required by 10 CFR 50.54(a), an update to the current Quality Assurance Program Description for San Onofre Units 1, 2, and 3 is submitted in accordance with 10 CFR 50.71(e), six months following startup from the Unit 3, Cycle 9 refueling outage. In accordance with 10 CFR 50.54(a), the following are provided:

Enclosure I Southern California Edison (SCE) Topical Report, Quality Assurance Program SCE-1-A, Amendment 19, dated December 1997.

The Quality Assurance (QA) program described in this Topical Report is presently applicable to San Onofre Units 1, 2, and 3.

Enclosure II Summary of Changes Introduced in Topical Report SCE-1-A Amendment 19 as Compared to Amendment 18, Change Notice #42 (reference). Major changes incorporated by Amendment 19 include:

1.

Responsibility for the safe storage and handling of irradiated fuel has been clarified as being part of the Vice President Nuclear Generation areas of. responsibility.

9801150120 980113 PDR ADOCK 05000206 P

PDR San Onofre Nuclear Generating Station P. 0. Box 128 San Clemente, CA 92674-0128 2

A 714-368-7420

Document Control Desk

-2

2.

Clarified various organizational responsibilities

3.

Added reference to Licensee Controlled Specifications after Technical Specifications in the Design Control Section

4.

Various editorial changes and clarifications of wording

5.

Changes "Quality Assurance" to "Nuclear Oversight" in two places.

This Amendment 19 does not contain any decrease in commitment to the currently approved version of the SCE Topical Report, Amendment 18.

If you have any questions or need additional information, please let me know.

Very truly yours, Enclosures cc:

E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. K. Webb, NRC Project Manager, San Onofre Unit 1 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 Louis Carson, Regional Project Inspector, San Onofre Unit 1 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 S. S. Baiwa, Section Chief, Decommissioning Section