ML13316A224

From kanterella
Jump to navigation Jump to search
Forwards Five Pages That Were Inadvertently Omitted from 970731 Correspondence
ML13316A224
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/07/1997
From: Mendonca M
NRC (Affiliation Not Assigned)
To: Robertus J
SAN DIEGO COUNTY, CA
References
NUDOCS 9708130208
Download: ML13316A224 (7)


Text

August 7, 199 Mr. John H. Robertus San Diego Regional Water Quality Control Board 9771 Clairemont Mesa Blvd., Suite A San Diego, CA 92124

Dear Mr. Robertus:

EncTosed are five pages that were inadvertently omitted from our July 31, 1997 correspondence.

Sincerely, Original signed by:

Marvin M. Mendonca, Acting Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation

Enclosure:

As stated DISTRIBUTION:

FDocket Files. 50-206, -361 and 3621 MSlosson MFields PUBLIC (w/incoming)

SWeiss PDND r/f MMendonca BEweeney SCollins SBajwa Region IV FMiraglia EHylton(w/incoming)

WBateman RZimmerman TMartin WTravers NRR Mail Room (YT#097010 w/incoming) (012-G18)

MWebb w/incoming)

PDND:(A)D on MMendonca

/97

/ -7/97 SCIAL RECORD COPY DOCUMENT NAME: G:\\SECY\\ACTN_ITM\\YTO97010.MTM 9708130208 970807 PDR ADOCK'05000206 P

PDR 0

0 5

2 F

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-001 August 7, 1997 Mr. John H. Robertus San Diego Regional Water Quality Control Board 9771 Clairemont Mesa Blvd., Suite A San Diego, CA 92124

Dear Mr. Robertus:

Enclosed are five pages that were inadvertently omitted from our July 31, 1997 correspondence.

Sincerely, Marvin M. Mendonca, Acting Director Non-Power Reactors and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation

Enclosure:

As stated

SAN ONOFRE 1 FSAR UPDATED FUEL STORAGE AND HANDLING and the decontamination pad are force ventilated. Before the air is discharged through the plant vent stack, it is monitored for radioactivity.

Airborne radioactive ventilation systems are presented in detail in section 9.4.3.

A roll-up door, in the east wall at the south end, provides access to the north turbine deck extension at the 42-foot.elevation. Also, a roof hatch provides the turbine gantry crane with access for handling spent fuel casks.

9.1.2.2.2 Spent Fuel Pit The SFP provides handling and storage facilities for spent fuel assemblies after they are removed from the reactor and storage for the fuel shipping cask.

The SFP is 68 feet long by 21 feet wide by 40 feet deep and is constructed of reinforced concrete 4 feet thick, lined with stainless steel, and contains 4 20,000-gallons of borated water that acts as a biological shield for the spent fuel.

Separate interconnected sections of the structure accommodate fuel storage racks (west end), spent fuel shipping cask storage (southeast end), and spent fuel upender equipment (northeast end).

The arrangement is shown in figure 9.1-1. A removable weir gate can isolate the spent fuel pit and cask storage from the upender cavity for dewatering. A waterproof membrane encases the concrete structure, below ground level, to prevent groundwater from coming in contact with the concrete.

The spent fuel pit contains a welded stainless steel plate (0.12 in. thick below elevation 4'-0" and 0.06 in. thick above elevation 4'-0") liner which assists in maintaining pit water chemistry, by preventing concrete-water contact.

In order to prevent damage to the liner in the cask handling area, a stainless steel plate, 2-1/4 in. thick, has been installed at the bottom of the cask handling area. The stainless steel plate provides protection for the liner in the event of a dropped cask. It also distributes evenly the load of the cask on the liner plate.

In addition, the stainless steel liner provides a reliable long life material, with minimal rates of corrosion products released to the pit water.

The fuel pit is filled with borated water which provides shielding to personnel that limits the radiation dose rate at the water surface to a maximum of 2.5 mrem/h, with 216 spent fuel assemblies in the racks. The dose rate outside of the room will not exceed 1.0 mrem/h.

A minimum borated water level is maintained at elevation 40 feet 3 inches whenever fuel is in the racks. This level ensures that at least 23 feet of water would be available to remove 99% of the iodine gap activity assumed to be released in the event of a dropped and damaged fuel assembly. In addition, this level also ensures that there is adequate heat sink in the SFP and refueling cavity so that standby cooling methods can be initiated in December 1990 9.1-5 Revision 2

SAN ONOFRE 1 FSAR UPDATED FUEL STORAGE AND HANDLING the event of a cooling system failure. This level will also ensure that at least 10 feet of borated water is above the top of the fuel rods when it is fully withdrawn from the rack and in the transport position to limit radiation dose rates at the water surface. A low-level alarm is annunciated in the control room at elevation 40 feet 6 inches so that the level is maintained above 40 feet 3 inches. A high level alarm is annunciated in the control room at elevation 41 feet 0 inches so that the level is maintained below the spent fuel room at elevation 42 feet.

The SFP is connected to the sphere refueling cavity through the fuel transfer tube. The SFP is connected to the primary make-up water, refueling water system, and boric acid tanks and pumps for additional filling capabilities. During refueling shutdown, the boron concentration in the SFP, the sphere refueling cavity, and the reactor coolant system are kept at a minimum of 2000 ppm. The SFP boron concentration is maintained at a minimum of 2000 ppm at all times when fuel assemblies are present.

The concrete surface area between the pit bottom and the stainless steel liner has several 1-inch channels that connect to a 2-inch perimeter channel. These will direct any leakage to a monitoring well on the north side of the pit.

Any water leakage is discharged through a pipe into a leak detection well which is located outside the building north wall, east end. The well extends down below the bottom of the pit; therefore, it collects water and will indicate leakage from any portion of the pit liner.

The well is covered with a plate, in which there is a vent pipe and a closed inspection nozzle. Liner leakage is checked by observing any water discharged from the vent, or by removing the inspection nozzle cover and viewing water level in the well.

9.1.2.2.3 Spent Fuel Pit Piping Connections The SFP pump normally takes suction from near the top of the pit, through a normally open, locally hand-operated valve. A low level suction is available for the SFP pump to drain the pit to about 28 feet 0 inch. This line is normally isolated by a valve to ensure that its suction is under proper administrative control. The SFP cooling recirculation line discharges to about 12 feet below the normal water level.

9.1.2.2.4 Decontamination Pad The decontamination pad inside the fuel storage building provides a controlled environment for decontaminating the spent fuel cask. The decontamination pad area provides facilities for casks, fuel handling tools, and other small tools.

Primary plant make-up water and steam connections are provided at the pad.

December 1990 9.1-6 Revision 2

CONIAINME NT SPH NEW FUEL ELEVATOR DRIVE UNIT/CONTROI GCABLE SIGHT GLA!.M :

REACTOR SEAVICE CSANE RAILSTRN PERSONNEL RAC, S ACCESS LOCK n/n

~SGd'-C ENLO DECON.-

M ANIPUL.ATOA UBN AREA

/

C\\RANWNUE ELEVATOR (a

0

_---CC CHANGE oi LIM1 SYSTEM SGC S

A6, REFUELING

~f PRESSURIZEF AC0 42'-0' EL.

O C

-FUEL s sSG 'A' TRANSFER

-PNFULCS IENCLOSURE PANEL

&WINCH AEFACTOR HEADPA LAYOOWN AREA

~FUEL TRANF II'-ERGT PANEL C WINCHES E-NWFUELIls rr (D

CC CD-SPENT FUIEL

-n Q

S10RAGE RACKS mT zC TURBIN U)PAU STAG RECKA ra(.oZ

PERSONNEL ESCAPE HATCH CONTAINMENT SPHERE rt.

RX TURE:.qE GENERATOR

  • REFUFLING S UE TRANSFER
  • CV7 CAIT.L>

SPELT FUEL CAuEL PITLEAK DETEECTI ONIFR NUCLAR GNERTUINE TTIN GENETpae iaaftnlssR Reuein SsemT FaclEs (Pag 2 of 3)

ELECTRICAL ROOM TRANSAN ONOFR NUCLEA GENERATING STTINUNTL PlantIO Plan ->4-0L L ~

Pg 2-----

of3 Figre 9.1-3E

CRANEE SG 'C EOUIP.P ENCLOSUAE DOOAT 42__4 ELE ELVTO LOOIN EASTUELGALO REFUELING U

CAVITY SPENT SPENTLFUE CRANE FUEL UPENDERI TURIN CRAKS GENERATO SPENT EL EUILINNG C

o on

<F SETFEEULRE 00VTO PTRN3TCDHU TRAVELIG CAANE TURBIN ELECT.

ROOM 21772 SPENT FUEL SPENT FUEL

& RACKS PIT HO PO 0THO ELEVATION L NG ST LEAK DETECTION WELLS

--L ----- ---

U B N FUEL TRANSFER FUE E

G TUNNEL CAVITYSPENTSPENT FUEL CRANE FUELUPENER 7 CRNE HTCH TURBINE

CAANE TCABIN FUEL BUILDINGo TUEL REMOVED M_ m ROM CASK 02