Forwards Working Meeting Insp Repts 50-206/93-41, 50-361/93-41 & 50-362/93-41 on 931130.Proposed Rev to Emergency Plan Appears to Be Consistent W/Status of Unit 1
ML13312A746
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/14/1993
From: Pate R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13312A747 List:
References
NUDOCS 9312300130
Download: ML13312A746 (3)


See also: IR 05000206/1993041

Text

,R REGU

NULER

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE

WALNUT CREEK, CALIFORNIA 94596-5368

DEC 14 1993

Docket Nos. 50-206, 50-361, and 50-362

Licenses DPR-13, NPF-10, and NPF-15

Southern California Edison Company

Irvine.Operations Center

23 Parker Street

Irvine, California 92718

Attention:

Mr. Harold B. Ray

Senior Vice President

SUBJECT:

WORKING MEETING, SAN ONOFRE NUCLEAR GENERATING STATION (SONGS)

NRC INSPECTION REPORT 50-206/93-41, 50-361/93-41,

AND 50-362/93-41

On November 30, 1993, Mr. R. Pate, Mr. J. Reese, Ms. G. Good, and Mr. A.

McQueen of this office met with members of your staff at the Region V office

in Walnut Creek, California. Topics discussed in the meeting are described in

the enclosed report.

The proposed revision to your emergency plan appears to be consistent with the

status of Unit 1. Moreover, emergency plan areas identified as requiring

change appeared to be technically sound and well anticipated. The supporting

documentation supplied with the emergency plan revision, and the presentation

your staff made during the meeting, should facilitate our review.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Thank you for your continued cooperation.

Sincerely,

Robert J. Pte C ief

Safeguards, Emergency Preparedness, and

Non-Power Reactor Branch

Enclosure:

Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41

9312300130 931214

PDR ADOCK 05000206

0

PDR

Southern California Edison Company

Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41

cc w/enclosure:

Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric

Company

Mayor, City of San Clemente

Chairman, Board of Supervisors, County of San Diego

Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services

Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California

Department of Health Services

Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas

and Electric Co.

T. E. Oubre, Esq., Southern California Edison Company

Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department

Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power

Mr. R. W. Krieger, Vice President, Southern California Edison Company

Mr. J. Dominguez, FEMA, Region IX

0II

Southern California Edison Company

Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41

bcc w/enclosure:

Docket File

Resident Inspector

Project Inspector

G. Cook

B. Faulkenberry

R. Erickson, NRR/PEPB

bcc w/o enclosure:

M. Smith

Region V/ann

GGood

AcQueen

e

UEST COPY]

EST COPY]

IMEST COPY] REQUEST

i

TO PDR]

YE

NO

YES if

NO 1AES

NO

YES

NO 1 YES)

NO I

0