ML13312A746
| ML13312A746 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 12/14/1993 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13312A747 | List: |
| References | |
| NUDOCS 9312300130 | |
| Download: ML13312A746 (3) | |
See also: IR 05000206/1993041
Text
,R REGU
NULER
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIA LANE
WALNUT CREEK, CALIFORNIA 94596-5368
DEC 14 1993
Docket Nos. 50-206, 50-361, and 50-362
Licenses DPR-13, NPF-10, and NPF-15
Southern California Edison Company
Irvine.Operations Center
23 Parker Street
Irvine, California 92718
Attention:
Mr. Harold B. Ray
Senior Vice President
SUBJECT:
WORKING MEETING, SAN ONOFRE NUCLEAR GENERATING STATION (SONGS)
NRC INSPECTION REPORT 50-206/93-41, 50-361/93-41,
AND 50-362/93-41
On November 30, 1993, Mr. R. Pate, Mr. J. Reese, Ms. G. Good, and Mr. A.
McQueen of this office met with members of your staff at the Region V office
in Walnut Creek, California. Topics discussed in the meeting are described in
the enclosed report.
The proposed revision to your emergency plan appears to be consistent with the
status of Unit 1. Moreover, emergency plan areas identified as requiring
change appeared to be technically sound and well anticipated. The supporting
documentation supplied with the emergency plan revision, and the presentation
your staff made during the meeting, should facilitate our review.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Thank you for your continued cooperation.
Sincerely,
Robert J. Pte C ief
Safeguards, Emergency Preparedness, and
Non-Power Reactor Branch
Enclosure:
Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41
9312300130 931214
PDR ADOCK 05000206
0
Southern California Edison Company
Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41
cc w/enclosure:
Mr. Robert G. Lacy, Manager, Nuclear Department, San Diego Gas & Electric
Company
Mayor, City of San Clemente
Chairman, Board of Supervisors, County of San Diego
Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services
Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California
Department of Health Services
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Co.
T. E. Oubre, Esq., Southern California Edison Company
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Southern California Edison Company
Mr. J. Dominguez, FEMA, Region IX
0II
Southern California Edison Company
Inspection Report Nos. 50-206/93-41, 50-361/93-41, and 50-362/93-41
bcc w/enclosure:
Docket File
Resident Inspector
Project Inspector
G. Cook
B. Faulkenberry
R. Erickson, NRR/PEPB
bcc w/o enclosure:
M. Smith
Region V/ann
GGood
AcQueen
e
UEST COPY]
EST COPY]
IMEST COPY] REQUEST
i
TO PDR]
YE
NO
YES if
NO 1AES
NO
YES
NO 1 YES)
NO I
0