Ack Receipt of 791214 Interim Deficiency Rept Re Measuring & Test Equipment Recalibr at Vendor Facilities
ML13312A531
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/28/1979
From: Engelken R
NRC/IE, NRC/RGN-V
To: Arenal A
Southern California Edison Co
Shared Package
ML13312A532 List:
References
NUDOCS 8001040544
Download: ML13312A531 (1)


Text

f~kREGuJ o

UNITED STATES REGION V 1990 N. CALIFORNIA BOULEVARD p

~'SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 DEC 28 1979 Docket Nos. 50-361 50-362 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. A. Arenal Vice President Gentlemen:

Subject:

Interim Report on Measuring and Test Equipment Recalibrated at Vendor Facilities San Onofre Nuclear Generating Station Units 2 and 3 (your letter of December 14, 1979)

Thank you for your letter, referenced above, which forwarded an interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

Your report will be reviewed and evaluated, and we are looking forward to receipt of your final report on this matter.

Your cooperation with us is appreciated.

Sincerely, R. H. Engelken Director cc: J. H. Drake, Vice President Engineering and Construction 8,0V4