ML13310A992
| ML13310A992 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/26/1983 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Fogarty D SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 8310030109 | |
| Download: ML13310A992 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1450 MARIA LANE, SUITE 210 WALNUT CREEK, CALIFORNIA 94596 SEP 2 6 1983 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue IEFILE COPY Rosemead, California 91770 Attention: Mr. D. J. Fogarty Executive Vice President
Dear Mr. Fogarty:
SUBJECT:
REQUALIFICATION PROGRAM SCHEDULE In accordance with NRC policy and directives, Region V henceforth will be conducting periodic audits of the licensed operator requalification programs at power reactor facilities located within this region.
As Presently planned, the audit will, as a minimum, consist of administering at least one oral examination and reviewing your staff's grading of recent facility-administered written examinations. Frequently the audit will also include replacement of one or more sections of the facility-prepared written examination with sections prepared by the NRC operator licensing staff.
From the above, it is.clear that it is mutually beneficial for our audit visits to coincide with those times when requalification examinations are being administered by your training staff.
Accordingly, in order to prepare our audit schedule to have the minimum impact on your operations, you are requested to send us your schedule for requalification training and examinations, for the period from January 1, 1984 to December 31, 1984. Further, in order to permit timely scheduling of our resources for this period (for both audits and replacement examinations),.it is requested that the requalification schedule be provided to this office no later than October 28, 1983.
9310-030109
-930926 PDR ADOCK 05000206 V
PDR p
Southern California Edison Company 2 -
SEP 2 6 1983 Thank you for your cooperation in this matter. If you require further information, please contact.Mr. Leonard Wiens at (415) 943-3722.
T. W. Bishop, Director Division of Resident, Reactor Projects and Engineering Programs cc:
H..B. Ray, Station Manager Bill McRory, Training Manager Mike Kirby, Training Manager bcc:
RSB/Document Control Desk (RIDS)
Distributed by.RV:
JBM State of California Resident Inspector RV G
L.Wiens:dh G.Z tzig T.
ishop 9/f4/83 9/A 7/83 9/ 1j8