Approves 800813 Request to Withhold CEN-127(S)-P (Ref 10CFR2.790).Document Contains Trade Secrets, Confidential,Commercial & Financial Info
ML13310A347
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/06/1981
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Scherer A
ABB Combustion Engineering Nuclear Fuel, (Formerly ACF Industries )
References
NUDOCS 8101190280
Download: ML13310A347 (2)


Text

N 619 81 Docket Nos.:

50-361/362 Mr. A. E. Scherer Licensing Manager Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095

Dear Mr. Scherer:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (SAN ONOFRE NUCLEAR GENERATING-STATION, UNITS Z AND 3)

The Southern California Edison Company, by letter dated August 13, 1980, submitted Combustion Engineering input data used in the CESEC and TORC computer codes for analysis of several:,steam line and feedline breaks (CEN-127(S)-P) and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. Your affidavit and a non-proprietary version of CEN-127(S)-P were also submitted with the August 13 letter.

Your reasons for requesting our withholding of this information were (1) the information has customarily been held in confidence and is not publicly available, (2) application of the data provides Combustion Engineering with a substantial competitive advantage, and.(3) public disclosure of the information would likely cause substantial harm to your competitive position.

We have reviewed your affidavit and material based on the requirements and criteria of 10 CFR 2.790 and have determined that the above-mentioned document sought to be withheld contain trade secrets or confidential or proprietary tommercial or financial information.

We also have found at this time that the right of the public to be fully apprised as to-the bases for and effects of the proposed action does not outweigh the demonstrated concern for protection of your competitive position. Accordingly, we have determined that the information should be withheld from public disclosure.

We therefore approve your request for withholding pursuant to Section 2.790 of 10 CFR Part 2 and are withholding CEN-127(S)-P from public inspection as proprietary.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, assure that the consultants have signed t aparopri e agreements for handliny proprietary data.

- 2 If the basis for.withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

Sincerely, F. Miraglia, Acting Chief Licensing iSranch No. 3 Division of Licensing cc:

Mr. Robert Dietch Vice President Southern California Edison Company 2244 Walnut Grove Avenue P.O. Box 800 Rosemead, California 91770 DISTRIBUTION:

Docket File 50-361/362 LPDR PDR LB3 r/f FMiraglia JLee HRood MRushbrook OELD ACRS (16)

IE (3)

TERA/NSIC/TIC f4pI L K J-7 14 NJ OFFICE BL B#3 DL:LB#3 DL:LB#1.D jb H od

~ N rok AAF OFFCEo.

..su...ME b.R...rook.F.i..a DATE

.. 1.

O 12/ /8J 12/.(/80

/

80

/0 NRC FORM 318 (9-76) NRqM 0240

.S.'GOVERNMENT PRINTING OFFIC 1979-289-369