Forwards IE Insp Repts 50-361/79-24 & 50-362/79-23 on 791001-05.No Noncompliance Noted
ML13309A833
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/11/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A835 List:
References
NUDOCS 8001160154
Download: ML13309A833 (2)


See also: IR 05000361/1979024

Text

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

DEC 11 1979

Docket Np

13

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. A. Arenal

Vice President

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2 and 3

This refers to the inspection conducted by Messrs. J. H. Eckhardt, R. J.

Pate, J. 0. Elin, and D. P.. Haist of this office on October 1-5,. 1979, of

activities authorized by NRC Construction Permit Nos. CPPR-97 and 98, and to

the discussion of our findings held with Mr. D. E. Nunn and other members

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

8001 i60 /SY

Southern California Edison Company

-2-

DEC 11 1979

Should you have any questions-concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

G. S. Spencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/79-24

50-362/79-23

cc w/o enclosure:

J. H. Drake, Vice President,

Engineering & Construction, SCE