Text
o
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
DEC 11 1979
Docket Np
13
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Mr. A. Arenal
Vice President
Gentlemen:
Subject: NRC Inspection at San Onofre Units 2 and 3
This refers to the inspection conducted by Messrs. J. H. Eckhardt, R. J.
Pate, J. 0. Elin, and D. P.. Haist of this office on October 1-5,. 1979, of
activities authorized by NRC Construction Permit Nos. CPPR-97 and 98, and to
the discussion of our findings held with Mr. D. E. Nunn and other members
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter
views with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 30 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica
tion must include a full statement of the reasons why it is claimed that
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
8001 i60 /SY
Southern California Edison Company
-2-
DEC 11 1979
Should you have any questions-concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
Nos. 50-361/79-24
50-362/79-23
cc w/o enclosure:
J. H. Drake, Vice President,
Engineering & Construction, SCE