Text
0ot-
UNITED STATES
A -,
ANUCLEAR
REGULATORY COMMISSION
1
REGION V
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
October 3, 1979
Docket No. 50-361/
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Mr. A. Arenal, Vice President
Advanced Engineering
Gentlemen:
Subject:
NRC Inspection - San Onofre Unit 2
This refers to.the inspection conducted by Messrs. A. D. Johnson and
G. B. Zwetzig of this office on. August 21-23, 1979 of activities authorized
by NRC Construction Permit No. CPPR-97, and to the discussion of our
findings held by Mr. Johnson with Mr. D. Nunn and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter
views with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica
tion must include a full statement of the reasons why it is claimed that
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
7.7
Ui C 7)02P
Southern California Edison Company
-2-
October 3, 1979
to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
L. Crew , Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
IE Inspection Report
No. 50-361/79-21
cc w/o enclosure:
J. H. Drake, Vice President
Engineering and Construction, SCE