ML13309A736

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-361/79-16 & 50-362/79-16 on 790410-0627.No Noncompliance Noted
ML13309A736
Person / Time
Site: San Onofre  
Issue date: 07/23/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A737 List:
References
NUDOCS 7909050062
Download: ML13309A736 (2)


See also: IR 05000361/1979016

Text

'pkREG(Z

0

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

JUL 23 879

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. Jack B. Moore

Vice President

Gent emen:

Subject:

NRC Investigation of Electrician Qualifications at San Onofre

Unit Nos. 2 and 3

This refers to the investigation conducted by Mr. R. J. Pate of this office

during the period of April 10, 1979 to June 27, 1979, of activities relating

to an allegation received by Southern California Edison and the NRC that

some of the electricians performing activities authorized by NRC Construction

Permit Nos. CPPR-97 and CPPR-98 were not qualified to perform the activities,

and to the discussion of our findings held with Mr. D. E. Nunn and other

members of your staff on June 4, 1979.

Areas examined during this investigation are described in the enclosed report.

Within these areas, the investigation consisted of selective examinations of

personnel training records and interviews with personnel.

No items of noncompliance with NRC requirements were identified within the scope

of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If

this report contains any information that you believe to be proprietary,

it is necessary that you submit a written application to this office,

within 20 days of the date of this letter, requesting that such information

be withheld from public disclosure. The application must include a full

statement of the reasons why it is claimed that the information is proprie

tary. The application should be prepared so that any proprietary information

identified is contained in an enclosure to the application, since the applica

tion without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

7

905006,>

Southern California Edison Company

-2

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

G. S. encer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

LE Inspection Report

Nos. 50-361/79-16

50-362/79-16

cc w/o enclosure:

J. H. Drake, Vice President

Engineering & Construction, SCE

Frank R.

Underhill

IBEW Local No. 569

215 W. Washington St.

San Diego, California 92103