ML13309A727

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-361/79-15 & 50-362/79-15 on 790529-0601.No Noncompliance Noted
ML13309A727
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/26/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A728 List:
References
NUDOCS 7908150235
Download: ML13309A727 (2)


See also: IR 05000361/1979015

Text

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

JUN ~

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Mr. J. B. Moore

Vice President

Gentlemen:

This refers to the inspection conducted by Messrs. J. H. Eckhardt,

D. P. Haist, and J. 0. Eln of this office on May 29-June 1, 1979

of activities authorized by NRC Construction Permit Nos. CPPR-97

and CPPR-98, and to the discussion of our findings held with

Mr. D. E. Nunn and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you

believe to be proprietary, it is necessary that you submit a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public.disclosure.

The application must include a full statement of the reasons why it is

claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the

enclosure will also be placed in the Public Document Room. If we do not

hear from you in this regard within the specified period, the report will

be placed in the Public Document Room.

79 0 0end56

Southern California Edison Company

-2

Should you have any questions concerning this.inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. Spencer, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/79-15

50-362/79-15

cc w/o enclosure:

J. H. Drake, Vice President

Engineering and Construction, SCE