Forwards IE Insp Repts 50-361/79-14 & 50-362/79-14 on 790529-31.No Noncompliance Noted
ML13309A724
Person / Time
Site: San Onofre  
Issue date: 06/29/1979
From: Crews J
NRC Office of Inspection & Enforcement (IE Region V)
To: Johari Moore
Southern California Edison Co
Shared Package
ML13309A725 List:
References
NUDOCS 7908150178
Download: ML13309A724 (2)


See also: IR 05000361/1979014

Text

REG14I

O

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

June 29, 1979

Docket Nos

Southern California Edison Company

P. 0.YBox 800

2244 Walnut Grove Avenue

Rosemead, California

91770

Attention: Mr. J. B. Moore

Vice President

Gentlemen:

Subject:

NRC Inspection -

San Onofre Units 2 and 3

This refers to the inspection conducted by Mr. H. L. Canter of this

office on May 29-31, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-97 and CPPR-98, and to the discussion of our findings

held by Mr. Canter with Messrs. R. Rosenblum, P. Belhumeur and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in .the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations.by the inspector.

No items of noncompliance .with-NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

7901 50(7q

Southern California Edison Company

-2-

June 29, 1979

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

J

s,

Chief

R actor Operations and

uclear Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/79-14

50-362/79-14

cc w/o enclosure:

J. H. Drake, Vice President

Engineering and Construction