UNITED STATES
NUCLEAR
REGULATORY
COMMISSION
REGION V
SUITE 202, WALNUT CREEK PLAZA
1990 N. CALIFORNIA BOULEVARD
- WALNUT
CREEK, CALIFORNIA
94596
FEB9
1979
Docket Nos. 50-361/1-5
50-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Mr. Jack B. Moore
Vice President
Gentlemen:
Subject: NRC Inspection at San Onofre Units 2 and 3
This refers to the inspection conducted by Messrs. J. H. Eckhardt
L. E. Vorderbrueggen of this office on January 23-26, 1979, of act1
l
authorized by NRC Construction Permit Nos. CPPR 97 and CPPR 98,
ndt
the discussion of our findings held with Mr. H. B. Ray and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the encl'ose:
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in
terviews with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title-10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you bei
to be proprietary, it is necessary that you submit a written appli
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applicx
tion must include a full statement of the reasons why it is claimed the
7903n19 oo
Southern California Edison Company
-2-
B .
yd/9
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified. period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
G. S. Spncer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
Inspection Report
Nos. 50-361/79-03
50-362/79-03
cc w/o enclosure:
J. H. Drake, Vice President
Engineering & Construction, SCE