Forwards IE Insp Repts 50-361/79-01 & 50-362/79-01 on 790108-11 & Notice of Violation
ML13309A618
Person / Time
Site: San Onofre  
Issue date: 01/31/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A616 List:
References
NUDOCS 7903150307
Download: ML13309A618 (2)


See also: IR 05000361/1979001

Text

UNITED STATES

NUCLEAR REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA 94596

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. Jack B. Moore

Vice President

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2 and 3

This refers to the inspection conducted by Mr. W. G. Albert of this

office on January 8-11, 1979, of activities authorized by NRC Con

struction Permit Nos. CPPR-97 and CPPR-98, and to the discussion of

our findings held by Mr. Pate, the NRC Resident Inspector, at the

San Onofre site during his routine weekly meeting with members of

the site staff.

The inspection was an examination of the calibration control system

for measuring and test equipment. Within this area, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that one of

your activities was not conducted in full compliance with the NRC

requirements, as set forth in the Notice of Violation, enclosed

herewith as Appendix A. This item of noncompliance has been cate

gorized into a level as described in our correspondence to all NRC

licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

7903150307

Southern California Edison Company

-2-

p

1 q

within thirty (30) days of your receipt of this notice, a written

statement or explanation in reply including:

(1)

corrective steps

which have been taken by you and the results achieved; (2) corrective

steps which will be taken to avoid further violations; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you be

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is

contained in an enclosure to the application, since the application

without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. S encer, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1. Appendix A - Notice of Violation

2. IE Inspection Report

Nos. 50-361/79-01

and

50-362/79-01

cc w/o enclosure 2:

J. H. Drake, Vice President

Engineering and Construction, SCE