Forwards IE Insp Repts 50-361/79-04 & 50-362/79-04 on 790116-18.No Noncompliance Noted
ML13309A612
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 02/02/1979
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A613 List:
References
NUDOCS 7903120503
Download: ML13309A612 (2)


See also: IR 05000361/1979004

Text

R~G

0 ~

UNITED

STATES

NUCLEAR REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

.01990

N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA

94596

February 2, 1979

Docket Nos. 50-361 7 q

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. J. B. Moore

Vice President

Gentl emen:

Subject:

NRC Inspection - San Onofre Units 2 and 3

This refers to the inspection conducted by Messrs. R. F. Fish and

J. B. Baird of this office on January 16-18, 1979 of activities authorized

by NRC Construction Permit Nos. CPPR-97 and CPPR-98, and to the discussion

of our findings held by Mr. Fish with Mr. G. D. Bogosian and other

members ofi

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel

and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the inlormiation is proprietary.

The application should be prepared so

7903120 503

Southern California Edison Company

-2-

February 2, 1979

  • that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

H. E. Book, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

IE Inspection Report

Nos. 50-361/79-04

50-362/79-04

cc w/o enclosure:

J. H. Drake, Vice President

Engineering and Construction, SCE