R~G
0 ~
UNITED
STATES
NUCLEAR REGULATORY
COMMISSION
REGION V
SUITE 202, WALNUT CREEK PLAZA
.01990
N. CALIFORNIA BOULEVARD
WALNUT CREEK, CALIFORNIA
94596
February 2, 1979
Docket Nos. 50-361 7 q
50-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Mr. J. B. Moore
Vice President
Gentl emen:
Subject:
NRC Inspection - San Onofre Units 2 and 3
This refers to the inspection conducted by Messrs. R. F. Fish and
J. B. Baird of this office on January 16-18, 1979 of activities authorized
by NRC Construction Permit Nos. CPPR-97 and CPPR-98, and to the discussion
of our findings held by Mr. Fish with Mr. G. D. Bogosian and other
members ofi
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter
views with personnel
and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica
tion must include a full statement of the reasons why it is claimed that
the inlormiation is proprietary.
The application should be prepared so
7903120 503
Southern California Edison Company
-2-
February 2, 1979
- that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
H. E. Book, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
IE Inspection Report
Nos. 50-361/79-04
50-362/79-04
cc w/o enclosure:
J. H. Drake, Vice President
Engineering and Construction, SCE