Text
UNITED
STATES
NUCLEAR
REGULATORY
COVIMISSION
REGION V
SUITE 202, WALNUT CREEK PLAZA
1990 N. CALIFORNIA BOULEVARD
WALNUT CREEK, CALIFORNIA
94596
NOV z ai
Docket Nos. 50-361
50-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Mr. J. B. Moore
Vice President
Gentlemen:
Subject:
NRC Inspection -
San Onofre Units 2 and 3
This refers to the inspections conducted by.Mr. R. J. Pate of this
office during the period October 2-31, 1978, of activities author
ized by NRC Construction Permit Nos. CPPR-97 and 98, and to the dis
cussions of his findings held by Mr. Pate with Mr. H. B. Ray and
other members of your staff on October 6, 20 and 27, 1978.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in
terviews with-personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
II2280 a-
Southern California Edison Company
-2
to this office, within 20 days of the date of this letter, requesting
that such information be withheld from public disclosure. The applica
tion must include a full statement of the reasons why it is claimed that
the information is proprietary. The application should be prepared so
that any proprietary information identified is contained in an enclosure
to the application, since the application without the enclosure will
also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in
the Public Document Room.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
G. S..Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
Nos. 50-361/78-17
50-362/78-13
cc w/o enclosure:
J. H. Drake, Vice President
Engineering & Construction, SCE