PEGULATRY iNFORMATION DISTRIdUlTION SYSTEM (RIDS)
ACCESSION N6R:80106051S DUC.DATE: 80/12/30 NOTARIZED: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-361 San Onofre uclear Station, Unit 2, Southern Caifforn Q0,6 50-302 San Onofre 'juclear Station, Unit 3, Southern Californ 5000362 AUTHNAME AUjTHjR AFFILIATION HAYNES,J.G.
Southern California Edison Co, RECIP.NIAAE RECIPIENI[ AFFILIATION EISENHUT,D.G.
Division of Licensinq
SUBJECT:
Forwards "Shitt Tecnnial Advisor Traininq & Requalification Program," & related infoin response to NRC 801031 Itr re TMI action plan reouirement.
DISTRIUTTION CODE: A00S COPIES RECEIVED:LTR.
ENCL SIZE:.........
TITLE: General Distribution for after Issuance of Goerating License NOTES:1 cy each:SEP Section Leader & J Hanchett (Region V) 05000206 Send all FSAR g ER amends to L Chandler.
05000361 1 cy:J Hanchett (Reqion V)
Send all FSAR & ER amends to L Chandler.
05000362 1 cy:J Hanchett (Region V)
RECTPIENT COPIES RECIPIENT COPTES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION:
CPUTCHFIELD 04 13 13 MIRAGLIA,F, 04 13 13 INTERNAL: 0/DIR,HUM FACO6 1
1 OIRDIV OF LIC 1
1 I&E Go 2
2 NRC PDR 02 1
1 t
11 1
0 OR ASSESS BR 10 1
0 G FILE 01 1
1 EXTERNAL: ACRS 0V 1b 16 LPDR 03 1
1 NSIC 0
1 1
JAN 198?
TOTAL NUABEk OF COPIES RE.UIRED: LTTP 9 e E N CL
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 J. G. HAYNES TELEPHONE MANAGER OF NUCLEAR OPERATIONS December 30, 1980 (213) 572-1742 D. G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 TMI ACTION PLAN REQUIREMENT SHIFT TECHNICAL ADVISOR
Dear Sir:
Your letter of clarification dated October 31, 1980 provided confirmation that Shift Technical Advisors (STA's) were required to complete all training in accordance with the October 30, 1979 correspondence by January 1, 1981.
The letter also requested additional information as specified in the following:
REQUIREMENT Provide a description of the STA Training Program and plans for requalification training.
RESPONSE
The San Onofre Nuclear Generating Station "Shift Technical Advisor Training and Requalification Program" dated December 1980 is attached which describes the program.
REQUIREMENT Describe the level of training which STA's have attained by January 1, 1981 and demonstrate conformance with the qualification and training criteria in the October 30, 1979 letter.
RESPONSE
Five Shift Technical Advisor candidates were assigned to the San Onofre STA Training Program in May, 1980 and have been fully committed to this endeavor since that time.
8101060134 V
D. G. Eisenhut December 30, 1980 Page 2
RESPONSE
(Continued)
Each canoidate possesses a Bachelor of Science Degree in either Engineering or Physics-.and have past nuclear experience varying from one to four years.
Since entering the STA Training Program, the candidates technical education has been enhanced by general and specific training in Heat Transfer, Fluid Flow, Thermodynamics, Core Damage Mitigation, Nuclear Power Plant Chemistry (including Radio-Chemistry) and Reactor Physics.
Reactor Operations training has been provided which includeo details of Nuclear Steam Supply Systems, Balance of Plant Systems and Instrument Systems.
Administrative ano Regulatory Controls and Plant Procedures have similarly been topics of the program.
A comprehensive Nuclear Plant Simulator course was attended at the TVA Power Operations Training Center and Transient and Accident Operations have been analyzed.
All students participated in the Nuclear Power Reactor Safety Program at the Massachusetts Institute of Technology.
The qualifications of the incumbent STA's meet the intent of the October 30, 1979 correspondence and paragraphs A.1, 2 and 3 of Enclosure 2 to the September 13, 1979 letter in that:
- 1.
All STA's possess a college level education in engineering or science subjects and have received training in reactor operations both normal and off normal.
- 2.
The accident assessment function and the operating experience function will both be served by the STA therefore, cognizance of evaluations of operating experience will be satisfied.
- 3.
The Technical education of the STA's include basic college subjects of Mathematics, Reactor Physics, Chemistry, Materials, Reactor Thermodynamics, Fluid Mechanics, Heat Transfer, and Electrical Engineer ing.
These subjects were also reviewed during STA training sessions emphasizing plant specific technology.
- 0. C. Eisenhut December 30, 1980 Page 3
RESPONSE
(Continued)
- 4.
The STA's have received training in the details of the design, funct.ion,. arrangement and operation of, plant systems.
- 5.
The STA's have received transient and accident re sponse training that included simulated transients of moderate frequency and infrequent or limiting faults.
Plant specific review of transients and accident scenarios has also been conducted.
San Onofre Unit I is presently at cold shutdown and is ex pected to remain in this condition until early 1981.
It is, therefore, the intent to continue training of the present STA's through the first quarter of 1981.
REQUIREMENT Provide a description of the long-term STA Program. Include qual ification, selection criteria, training plans and plans, if any, for the eventual phase-out of the STA Program.
Include a compari son of the San Onfore Program with the INPO document entitled "Nuclear Power Plant Shift Technical Advisor -
Recommendations for Position Description Qualfications, Education and Training" dated April 30, 1980.
RESPONSE
Long term plans for Shift Technical Advisor utilization at San Onofre have not been finalized.
However, in concept,' we expect the STA function to remain in effect for the foreseeable future.
This being the case our selection process will require that a STA candidate possess a bachelors degree in a science or engineering dicipline.
it is our plan, that whenever possible, the STA category will be the entry level position into the Plant Engineering group.
Then, after approximately nine months of training and two years in the STA assignment, the incumbent would rotate into duties customarily performed by engineers and a new STA would be started on tour.
D. G. Eisenhut December 30, 1980 Page 4
RESPONSE
(Continued)
While performing duties as a STA, (i.e., during tours of duty on shift), the STA would repo-rt to the Supervising Engineer, bypassing the normal operations chain of command.
Training of STA's will be in accordance with the "Shift Technical Advisor Training and Requalification Program" (enclosed) or as amended.
A comparison of the San Onofre STA training and requalifica tion program with the INPO document described above indicates that the San Onofre program generally meets or exceeds INPO guidelines relative to training.
The San Onofre selection process will also result in meeting or exceeding the education requirements of the INPO Document.
We believe the San Onofre Program as described meets or exceeds the INPO recommendation for education and experience.
Very truly yours, J. G. Haynes Manager of Nuclear Operations
SAN ONOFRE NUCLEAR GENERATING STATION TRAINING MEMORANDUM 7-80 December 10, 1980 TO:
DISTRIBUTION FROM:
MANAGER, NUCLEAR TRAINING
SUBJECT:
SHIFT TECHNICAL ADVISOR TRAINING AND REQUALIFICATION PROGRAM
Enclosure:
STA Training and Requalification Program PURPOSE The purpose of this memorandum is the promulgation of the subject program included as the enclosure.
ADMINISTRATION The Shift Technical Advisor Training and Requalification Program is effective as of this date.
All Shift Technical Advisors shall be trained in accordance with the enclosed program.
Records of training shall be maintained by the Training Services Administrator.
RESPONSIBILITY The Operator Training Administrator is responsible for administering the Shift Technical Advisor's Training and Requalification Program.
JLW/tlw ENCLOSURE