ML13308B428

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-07, Seismic Stress Analysis of Safety-Related Piping. Licensee Action Required
ML13308B428
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/14/1979
From: Engelken R
NRC Office of Inspection & Enforcement (IE Region V)
To: Johari Moore
Southern California Edison Co
References
NUDOCS 7905070104
Download: ML13308B428 (1)


Text

UNITED STATES 0

-C

-NUCLEAR REGULATORY COMMISSION

~ ~

0 A<~

REGION V LSUITE 202, WALNUT CREEK PLAZA 1990 N. CALIFORNIA BOULEVARD WALNUT CREEK, CALIFORNIA 94596 April 14, 1979 Docket No. 50-206 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: Mr. J. B. Moore Vice President Gentlemen:

Enclosed is IE Bulletin No. 79-07 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, R. H. Engelken Director

Enclosure:

IE Bulletin No. 79-07 with Enclosures cc w/enclosure:

J. M. Curran, SCE J. T. Head, SCE 7 9 05 070 to.