ML13308A366

From kanterella
Jump to navigation Jump to search
Notification of 840629 Meeting W/Util in Bethesda,Md to Discuss Reload methodology,RVLMS-EOI & Auxiliary Feed Pump Lube Sys
ML13308A366
Person / Time
Site: San Onofre  
Issue date: 06/27/1984
From: Rood H
Office of Nuclear Reactor Regulation
To: Knighton G
Office of Nuclear Reactor Regulation
References
NUDOCS 8407180083
Download: ML13308A366 (5)


Text

JUN 2 7 1984 Docket Nos.:

50-361 and 50-362 MEMORANDUM FOR:

George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing FROM:

Harry Rood, Project Manager Licensing Branch No. 3 Division of Licensing

SUBJECT:

FORTHCOMING MEETING WITH SOUTHERN CALIFORNIA EDISON COMPANY DATE & TIME:

Friday, June 29, 1984 9:00 am -

4:00 pm LOCATION:

Room P-422 Phillips Building Bethesda, Maryland PURPOSE:

To discuss reload methodology, RVLMS-EOI and Auxiliary Feed Pump Lube System.

1. Reload Methodology - 9:00 am to 11:30 am
2. RVLMS-EOIs -

1:30 pm -

2:30 pm

3. Auxiliary Feed Pump Lube System -

3:00 pm to 4:00 pm PARTICIPANTS:

NRC H. Rood, L. Phillips, Y. Hsii, T. Huang, 0. Parr, J. Wilson, N. Wagner, J. Clifford SCE F. Nandy, D. Smith, E. Richard (CE), et al.

Harry Rood, Project Manager Licensing Branch No. 3 Division of Licensing cc:

See next pa DL D

3 H

yt G

hton 6/+/84 6/g/84 6407130083 840627 PDR ADOCK 05000361

Palo Verde Vice President -

Nuclear Projects Arizona Public Service Company P. 0. Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr, Esq.

Kenneth Berlin, Esq.

Snell & Wilmer Winston & Strawn 3100 Valley Center Suite 500 Phoenix, Arizona 85073 2550 M Street, NW Washington, DC 20037 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission Ms. Lynne Bernabei 1200 West Washington Government Accountability Project Phoenix, Arizona 85007 of the Institute for Policy Studies 1901 Que Street, NW Charles R. Kocher, Esq. Assistant Counsel Washington, DC 20009 James A. Boeletto, Esq.

Southern California Edison Company Ms. dill Morrison P. 0. Box 800 522 E. Colgate Rosemead, California 91770 Tempi, Arizona 85238 Ms.

Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commuission P. 0. Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413

2.

26th Street Phoenix, Arizona 85040 Regional Administrator -

Region V U. S. Nuclear Regulatory Commniission 1450 Maria Lane Suite 210 Walnut Creek, California 94596

Agenda for Palo Verde Unit 1 July 5 and 6, 1984 July 5 - Administration Bldg., Palo Verde Site Readiness Review Management Meeting*

13:30 -

Introductions

13:35 -

Overview of Palo Verde Project o

Applicant/Vendor/Plant Background/Schedule for Fuel Load Significant Plant Features a

Cessar System 80 Components/Resolution of Preop Testing Problems 14:00 -

Organization for Plant Operations o

Operator Training, Licensing and Requalification Programs o

Number of Shifts, Manning and Experience o

Plans for Use of Advisors o

Experience of Management Personnel o

Organizational Stability 14:30 -

Management Capabilities o

Management Awareness and Involvement o

Control of Subcontractor Activities o

Program for Early Identification and Resolution of Alleged Problems 15:00 -

Plant Readiness o

Construction Completion o

Appendix R Compliance 0

TMI Items o

Equipment Qualification 15:30 -

Break

July 5 (Contd) -

Palo Verde Site

- 2 16:00 -

Staffing Working Group Meetings A. Discussion of Health Physics Programs and Steam Generator Tube Rupture Analysis B. Discussion of Maintenance Program, Control Room Design Review, Remote Shutdown Panel and Details on Staffing C. Control of (1) System Turnover from Startup to Operation and (2) Resources Between Unit 1 Operation and Unit 2 Testing D. Discussion of (1) Impacts of Temporary Water Pipe Break under Auxiliary Building and (2) Piezometers and Interpretation of Data E. Discussion of Previous Issues on Recently Licensed CE Plants (to start at 13:30)

F. Discussion of Status of Safety Review July 6 -

Applicant's Office in Phoenix (411 N. Central)

Readiness Review Management Exit Meeting*

10:00 Discussion of Any Remaining Matters Followed by Exit Meeting 11:30

-Departure

  • The readiness review management meetings are open to interested members of the public as observers. Members of the public who wish to attend these meetings must contact E. A. Licitra (301-492-7200) no later than 4:30 pm July 3, 1984.

.June 26, 1984 MEETING NOTICE DISTRIBUTION:

Docket No(.s):

NRC PARTICIPANTS NRC PDR Local PDR Henton TICHeno NSIC JMartin NS ICHThompson PRC System Thop LB3 Reading TBishop H. Denton/E. Case TYoung D. Eisenhut/R. Purple DMuller T. Novak GKnighton T.

NovakLHeller J. Youngblood L~erser A. Schwencer PNarbut E. Adensam R~irbut F. Miraglia RZimmerman E. Butcher GFiorelli D. Crutchfield LVorderbrueggen C. Grimes, Acting CBosted G. Holahan C. Thomas G. Lainas S. Varga D. Vassallo J. Miller J. Stolz R. Vollmer W. Johnston J. P. Knight R. Mattson L. Rubenstein W. Houston D. Muller T. Speis F. Schroeder F. Rowsome H. Thompson T. W. Russell ACRS (16)

Attorney, OELD E. L. Jordan N. Grace F. Ingram, PA Receptionist (On1 if meeting is held in Bethesda)

Project Manager EALicitra J. Lee bcc: Applicant & Service List