Text
May 23, 1989 Docket Nos.:
50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash*Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
REACTOR COOLANT PUMP TRIP METHODOLOGY, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 49691 and 49692)
In Generic Letter 86-06, the staff generically approved the Combustion Engineering Owners Group (CEOG) methodology for TMI Action Plan Item II.K.3.5, reactor coolant pump (RCP) trip, with the condition that plant-specific information be addressed. Our review of the San Onofre plant-specific information has determined that reactor safety has been significantly improved and that there are no major safety concerns at San Onofre Units 2 and 3.
We have completed our review of the San Onofre Units 2 and 3 RCP trip setpoint development and find it acceptable. This issue may be the subject of on-site verification.
Sincerely, original signed by Donald E. Hickman, Project Manager Project Directorate V, Division of Reactor Projects -
- III, IV, V and Special Projects cc: See next page DISTRIBUTION.
Docket File DHickman NRC &-LPDRs OGC PD5 Reading EJordan MVirgilio BGrimes JLee ACRS (10)
DRSP/PD5 D
- PD5
\\:.DEHickman:dr hton 5/;2/89 5M/89 OFFICIAL RECORD COPY 5O3 06207 qq52 PD AOCK.0000361 E09 OR
__'AK P U
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 May 23, 1989 Docket Nos.:
50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
REACTOR COOLANT PUMP TRIP METHODOLOGY, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 49691 and 49692)
In Generic Letter 86-06, the staff generically approved the Combustion Engineering Owners Group (CEOG) methodology for TMI Action Plan Item II.K.3.5, reactor coolant pump (RCP) trip, with the condition that plant-specific information be addressed. Our review of the San Onofre plant-specific information has determined that reactor safety has been significantly improved and that there are no major safety concerns at San Onofre Units 2 and 3.
We have completed our review of the San Onofre Units 2 and 3 RCP trip setpoint development and find it acceptable. This issue may be the subject of on-site verification.
Sincerely, Do nald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects cc:
See next page
Mr. 'Kenneth P. Baskin San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:
Charles R. Kocher, Esq.
Mr. Mark Medford James A. Beoletto, Esq.
Southern California Edison Company Southern California Edison Company 2244 Walnut Grove Avenue 2244 Walnut Grove Avenue P. 0. Box 800 P. 0. Box 800 Rosemead, California 91770 Rosemead, California 91770 Mr. Robert G. Lacy Orrick, Herrington & Sutcliffe Manager, Nuclear Department ATTN: David R. Pigott, Esq.
San Diego Gas & Electric Company 600 Montgomery Street P. 0. Box 1831 San Francisco, California 94111 San Diego, California 92112 Alan R. Watts, Esq.
Mr.. Paul.Szalinski, Chief Rourke & Woodruff Radiological Health Branch 701 S. Parker St. No. 7000 State Department of Health Services Orange, California 92668-4702 714 P Street, Building #8 Sacramento, California 95814 Mr. Hans Kaspar, Executive Director Marine Review Committee, Inc.
Resident Inspector, San Onofre NPS 531 Encinitas Boulevard, Suite 105 do U.S. Nuclear Regulatory Commission Encinitas, California 92024 Post Office Box 4329 San Clemente, California 92672 Mr. Charles B. Brinkman Combustion Engineering, Inc.
Regional Administrator, Region V 12300 Twinbrook Parkway, Suite 330 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852 1450 Maria Lane/Suite 210 Walnut Creek, California 94596 Mr. Dennis F. Kirsh U.S. Nuclear Regulatory Commission Chairman, Board Supervisors Region V San Diego County 1450 Maria Lane, Suite 210 1600 Pacific Highway, Room 335 Walnut Crekk, California 94596 San Diego, California 92101 Mr. Sherwin Harris Mayor, City of San Clemente Resource Project Manager San Clemente, California 92672 Public Utilities Department City of Riverside City Hall 3900 Main Street Riverside, California 92522 (15)