ML13303B885
| ML13303B885 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/09/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Mccarthy C SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 8803160402 | |
| Download: ML13303B885 (4) | |
Text
REGULATORY INFORMATION DISTRILBUTION SYSTEM1 (RIDS, ACCESSION NBR.8803160402 DOC. DTE. 8/03/09 NOT1AZED: NO 3ACSL10-6 S
Onfr NuGa Sttin Uni a
Sothr C0ifr 150 D FACIL:50-361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000362 50- 362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME
-AUTHOR AFFILIATION PATE,R.J.
Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION MCCARTHY,C.
Southern California Edison Co.
SUBJECT:
Requests that util furnish approved ref mat1 listed in Encl 1, "Ref Mat1 Requirements for Reactor/Senior Reactor Operator Licensing Exams," by 880425 in order for NRC to meet exams scheduled for 880726-0811.W/o encl.
DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:
)
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 PD 1
HICKMAND 1
INTERNAL: ACRS 2
AEOD/DSP/TPAB 1
NRR MORISSEAUD 1
NR LP/HFB10D 1
NRR/DLPG/OLB10D 2
REGFILE 02 1
RON5 FILE 01 1
EXTERNAL: LPDR 1
NRC PDR 1
NSIC 1
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL LA
March 9, 1988 Mr. Charles McCarthy Vice President-Site Manager San Onofre Nuclear Generating Station P. 0. Box 128 San Clemente, California 92672
Dear Mr. McCarthy:
Subject:
Reactor Operator and Senior Reactor Operator Licensing Examinations In a telephone conversation between Mr. Dick Mette, Training Superintendent and Mr. Douglas Coe, Examiner, arrangements were made for the administration of the examinations at the San Onofre Nuclear Generating Station, Units 2 and 3.
The written examinations are scheduled for July 26, 1988. The simulator/operating examinations are scheduled for July 27, 1988 through August 11, 1988.
In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, "Reference Material Requirements for Reactor/Senior Reactor Operator Licensing Examinations," by April 25, 1988. Any delay in receiving properly bound and indexed reference material will result in a delay in administering the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner manpower and to meet the examination dates requested by the various facilities.
Therefore, missing the April 25, 1988 deadline, even by a few days, likely will result in a long delay because it may not be possible to reschedule examinations at other facilities. Mr. Mette has been advised of our reference material sets that are required, and the examiner's names and addresses where each set is to be mailed.
The facility management is responsible for providing adequate space and accommodations in order to properly conduct the written examinations., "Requirements for Administration of Written Examinations,"
describes o requirements for conducting these examinations. Mr. Mette is aware of",
erequirements.
In additi kbetter document simulator examinations, the chief examiner will have 1iity simulator operator record prespecified plant conditions (i.e., planf' ressure, temperature, pressurizer level, etc.), for each simulator scenario. The candidate will be responsible for providing this information, along 'with any appeal of his simulator operating examination.
Therefore, the facility training staff should retain the simulator examination scenario information until all candidates taking the examination have either passed the operating examination or all appeals filed by the candidates who failed the operating examination have been completed.
8603160402 880309 PDR ADOCK 05000361 V
Mr. Charles McCarthy 2
March 9, 1988, also contains the Rules and Guidance that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these Rules.
All reactor operator and senior reactor operator license applications should normally be submitted at least.60 days before the first examination dates so that we will be able to review the training and experience of the candidates, and prepare final examiner assignments after candidate eligibility has been determined. If the applications are not received at least 30 days before the examination dates, it is likely that a postponement will be necessary.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 3, "Requirements for Facility Review of Written Examination."
Mr. Mette is aware of these requirements.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.C. 20503.
Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Mr. Douglas Coe, Examiner at (415) 943-3730 or Mr. John Elin at (415) 943-3728.
Sincerely, Robert J. Pate, Chief Reactor Safety Branch
Enclosures:
- 1. Reference Material Requirements for Reactor/Senior Reactor Operator Lic
-Examinations
- 2. Requi for Administration of Wri aminations
- 3. Requi
--for Facility Review of Writte Examination cc w/enclosures (1), (2) and (3):
Dick Mette, San Onofre Nuclear Generating Station cc w/o enclosures (1), (2) and (3):
D. Hickman, PD-V, NRR R. Huey, SRI (SONGS)
J. Elin, RV D. Coe, RV M. Royack, RV P. Morrill, RV G. Johnston, RV
Mr. Charles McCarthy 3
March 9, 1988 RV/jk
[REQUEST PY J REQUEST J REQUEST Y
[YES / NO)
YES
/
NO
]YES /
NO JOHNSTON ELIN 1
f PATE 3// /88 3/<'/88 3/d7/88