Requests Addl Info Re Util 10CFR50.59 Evaluation of Deviations of Installed Configuration on Eqml N-E10 Series Foxboro Transmitters from as-tested Configuration within 30 Days of Ltr Receipt
ML13303B123
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/05/1989
From: Hickman D
Office of Nuclear Reactor Regulation
To: Cotton G, Ray H
SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
References
TAC-73734, TAC-73735, NUDOCS 8909120195
Download: ML13303B123 (4)


Text

September 5, 1989 Docket Nos.

50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations Irvine Operations Center San Diego Gas and Electric Company 23 Parker 101 Ash Street Irvine, California 92718 Post Office Box 1831 San Diego, California 92112 Gentlemen:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 73734 AND 73735)

The staff is reviewing your 10 CFR 50.59 evaluation of the.deviations of the installed configuration on EQML N-E1O series Foxboro transmitters from the as-tested configuration. We find that we require additional information to complete our review. Please provide responses to the following concerns within 30 days of your receipt of this letter.

1. Are the two types of deviations identified in your evaluation - namely, the lack of low point drain holes and improper orientation - the only deviations from the as-tested configuration? Have you thoroughly inspected to confirm that there are no other deviations? Specifically, did the as-tested configuration include terminal blocks in the junction boxes?
2. Provide your schedule for correcting all non-conforming installations to meet the as-tested configuration.

Sincerely, original signed by Donald Hickman Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION QocketTTe CMcCracken s-NRC & LPDRs SNewberry PD5 Reading EJordan MVirgilio BGrimes JLee ACRS (10)

[S02/3 TACS 73734/35]

  • See previous concurrence OFOI DRSP/PD5*

DEST/SICB*

DE T/SPLB DRP.

)5't DHickman:dr SNewberry CMcCracken GW ghton 8/24/89 8/28/89 8/1/89 i/1 /89

Docket Nos. 50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations Irvine Operations Center San Diego Gas and Electric Company 23 Parker 101 Ash Street 7

Irvine, California 92718 Post Office Box 1831 San Diego, California 92112 Gentlemen:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 73734 AND 73735)/

The staff is reviewing your 10 CFR 50.59 evaluation of/,tihe deviations of the installed configuration on EQML N-E1O series Foxboro/transmitters from the as-tested configuration. We find that we require additional information to complete our review. Please provide responses to/the following concerns within 30 days of your receipt of this letter.

1. Are the two types of deviations identified in your evaluation - namely, the lack of low point drain holes and/improper orientation - the only deviations from the as-tested configuration? Have you thoroughly inspected to confirm that there are no other deviations? Specifically, did the as-tested configuration include terminal blocks in the junction boxes?
2. Is it your intention to correct all non-conforming installations to meet the as-tested configuration/at the earliest opportunity?

Sincerely, Donald E. Hickman, Project Manager Project Directorate V

/

Division of Reactor Projects -

III, CIV, V and Special Projects

//

Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION/

Docet Fi 7e/

CMcCracken NRC & LPDRs SNewberry PD5 Readin'g EJordan MVirgilio/

BGrimes JLee ACRS (10)

[SO /3 TACS 73734/35]

/PD5 DE I CB DEST/SPLB DRSP/D:PD5 ickman:dr Seberry CMcCracken GWKnighton h\\/89 8/7./89 8/ /89 8/ /89

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 September 5, 1989 Docket Nos.

50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations Irvine Operations Center San Diego Gas and Electric Company 23 Parker 101 Ash Street Irvine, California 92718 Post Office Box 1831 San Diego, California 92112 Gentlemen:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 73734 AND 73735)

The staff is reviewing your 10 CFR 50.59 evaluation of the deviations of the installed configuration on EQML N-E10 series Foxboro transmitters from the as-tested configuration. We find that we require additional information to complete our review. Please provide responses to the following concerns within 30 days of your receipt of this letter.

1. Are the two types of deviations identified in your evaluation - namely, the lack of low point drain holes and improper orientation - the only deviations from the as-tested configuration? Have you thoroughly inspected to confirm that there are no other deviations? Specifically, did the as-tested configuration include terminal blocks in the junction boxes?
2. Provide your schedule for correcting all non-conforming installations to meet the as-tested configuration.

Sincerely, Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

Mr. Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:

Charles R. Kocher, Esq.

Mr. Mark Medford James A. Beoletto, Esq.

Southern California Edison Company Southern California Edison Company Irvine Operations Center Irvine Operations Center 23 Parker 23 Parker Irvine, California 92718 Irvine, California 92718 Mr. Robert G. Lacy Orrick, Herrington & Sutcliffe Manager, Nuclear Department ATTN:

David R. Pigott, Esq.

San Diego Gas & Electric Company 600 Montgomery Street P. 0. Box 1831 San Francisco, California 94111 San Diego, California 92112 Alan R. Watts, Esq.

Mr. John Hickman Rourke & Woodruff Senior Health Physicist 701 S. Parker St. No. 7000 Environmental Radioactive Mgmt. Unit Orange, California 92668-4702 Environmental Management Branch State Department of Health Services Mr. Sherwin Harris 714 P Street, Room 616 Resource Project Manager Sacramento, California 95814 Public Utilities Department City of Riverside Resident Inspector, San Onofre NPS 3900 Main Street co U.S. Nuclear Regulatory Commission Riverside, California 92522 Post Office Box 4329 San Clemente, California 92672 Mr. Charles B. Brinkman Combustion Engineering, Inc.

Mayor, City of San Clemente 12300 Twinbrook Parkway, Suite 330 San Clemente, California 92672 Rockville, Maryland 20852 Regional Administrator, Region V Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 1450 Maria Lane/Suite 210 Region V Walnut Creek, California 94596 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman, Board of Supervisors San Diego County Mr. Don Womeldorf 1600 Pacific Highway, Room 335 Chief Environmental Management Branch San Diego, California 92101 California Department of Health 714 P Street, Room 616 Mr. F. B. Marsh, Project Manager Sacramento, California 95814 Bechtel Power Corporation P.O. Box 60860 Terminal Annex Los Angeles, California 90060 (15)