prtDocket Nos.: 50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
PROPOSED CHANGE PCN-215 SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 tTAC NOS. 61514 AND 61515)
By letter dated June 13, 1986 you submitted proposed change PCN-215 to Operating License Nos. NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3 respectively. This change would revise Technical Specification 3/4.8.1.1, "Electrical Power Systems, AC Sources,"
to allow a Unit 3 diesel generator to provide emergency power to Unit 2 emergency buses and vice versa, and to allow credit to be taken for an operable diesel generator on the opposite unit. However, your staff subsequently informed the NRC during a telephone conference on April 4, 1989 that the amendment is no longer requested. Therefore, your proposed change is considered to be withdrawn. If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.
Sincerely,
/s/
Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects cc:
See next page DISTRIBUTION Docket Fille MVirgilio ACRS (10)
OGC NRC & LPDRS JLee EJordan PD5 Reading DHickman BGrimes D
05 Dh4 a :cdd hton 4/-7 /89 4/i/189 PDR ADOCK 05000361 P
0 UNITED STATES NUCLEAR REGULATORY COMMISSION I-.
WASHINGTON, D. C. 20555 April 12, 1989 Docket Nos.:
50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rosemead, California 91770 Post Office Box 1831 San Diego, California 92112 Gentlemen:
SUBJECT:
PROPOSED CHANGE PCN-215, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 (TAC NOS. 61514 AND 61515)
By letter dated June 13, 1986 you submitted proposed change PCN-215 to Operating License Nos.
NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3 respectively. This change would revise Technical Specification 3/4.8.1.1, "Electrical Power Systems, AC Sources,'
to allow a Unit 3 diesel generator to provide emergency power to Unit 2 emergency buses and vice versa, and to allow credit to be taken for an operable diesel generator on the opposite unit. However, your staff subsequently informed the NRC during a telephone conference on April 4, 1989 that the amendment is no longer requested. Therefore, your proposed change is considered to be withdrawn. If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.
Sincerely, Donald E. Hickman, Project Manager Project Directorate V Divisionof Reactor Projects III, IV, V and Special Projects cc:
See next page
Mr. Kenneth P. Baskin San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:
Mr. Gary D. Cotton Mr. Hans Kaspar, Executive Director Senior Vice President Marine Review Committee, Inc.
Engineering and Operations 531 Encinitas Boulevard, Suite 105 San Diego Gas & Electric Company Encinitas, California 92024 101 Ash Street Post Office Box 1831 San Diego, California 92112 Mr. Mark Medford Southern California Edison Company Charles R. Kocher, Esq.
2244 Walnut Grove Avenue James A. Beoletto, Esq.
P. 0. Box 800 Southern California Edison Company Rosemead, California 91770 2244 Walnut Grove Avenue P. 0. Box 800 Mr. Robert G. Lacy Rosemead, California 91770 Manager, Nuclear Department San Diego Gas & Electric Company Orrick, Herrington & Sutcliffe P. 0. Box 1831 ATTN:
David R. Pigott, Esq.
San Diego, California 92112 600 Montgomery Street San Francisco, California 94111 Richard J. Wharton, Esq.
University of San Diego School of Alan R. Watts, Esq.
Law Rourke & Woodruff Environmental Law Clinic 701 S. Parker St. No. 7000 San Diego, California 92110 Orange, California 92668-4702 Charles E. McClung, Jr., Esq.
Attorney at Law Mr. S. McClusky 24012 Calle de la Plaza/Suite 330 Bechtel Power Corporation Laguna Hills, California 92653 P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. Charles B. Brinkman 1450 Maria Lane/Suite 210 Combustion Engineering, Inc.
Walnut Creek, California 94596 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Resident Inspector, San Onofre NPS c/o U. S. Nuclear Regulatory Commission Mr. Dennis F. Kirsh Post Office Box.4329 U.S. Nuclear Regulatory Commission San Clemente, California 92672 Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Sherwin Harris Resource Project Manager Public Utilities Department City of Riverside City Hall 3900 Main Street Riverside, California 92522