ML13302B519

From kanterella
Jump to navigation Jump to search
Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML13302B519
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/24/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 8011130034
Download: ML13302B519 (1)


Text

0 s~

REG&44 10 RGUNITED STATES 0 ~

NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD SUITE 202,-WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 October 24, 1980 Docket Nos.

50-361, 50-362 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Dr. L. T. Papay, Vice President Advanced Engineering Gentlemen:

The enclosed IE Supplement No. 3 to Bulletin 79-O1B is forwarded to you for information., It clarifies two issues raised by Supplement No. 2. These are (1) the submittal of qualification information for equipment resulting from TMI Action Plan requirements and (2) the qualification of equipment which is required to achieve a cold shutdown condition. This action is a result of industry feedback to NRC regarding interpretation of Supplement No. 2.

No written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely,..

R. H. Engelken Director

Enclosures:

1. IE Supplement No. 3 to Bulletin No.79-01B
2.

Recently Issued IE Bulletins cc w/enclosures:

R. Dietch, SCE