ML13302B476

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-28, Possible Malfunction of Namco Model EA180 Limit Switches at Elevated Temps. Action Required
ML13302B476
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/07/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7912200247
Download: ML13302B476 (1)


Text

,kREG j o

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V C

1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 December 7, 1979 Docket Nos. 50-361 50-362 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Mr. A. Arenal, Vice President Advanced Engineering Gentlemen:

Enclosed is IE Bulletin No. 79-28 which requires action by you with regard to your power reactor facility(ies) with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact.this office.

Sincerely, R. H. Engelken Director.

Enclosures:

1. IE Bulletin No. 79-28
2. List of Recently Issued IE Bulletins cc w/enclosures:

J. H. Drake, SCE

-o 2200