ML13302A640

From kanterella
Jump to navigation Jump to search
Discusses Costs Incurred in Processing & Issuing Ol.Max Fee for OL Paid.No Addl Fee Required
ML13302A640
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/23/1984
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 8405250330
Download: ML13302A640 (1)


Text

MAR 2 3 1984 Docket No. 50-362 Southern California Edison Company ATTN:

Mr.*, H. B. Ray Vice President Post Office Box 128 San Clemente, California 92672 Gentlemen:

On November 15, 1982, the Commission issued Operating License NPF-15 (five percent power) for the San Onofre Nuclear Generating Station, Unit 3. On September 16, 1983, the license was amended to authorize full power (100%) operation. As required by 10 CFR 170.21, an oper ating license fee of $302,800 was paid for the issuance of the oper ating license.

In accordance with Footnote 3 of Section 170.21, the costs incurred in the processing and issuance of the San Onofre operating license have been reviewed and they substantially exceed the maximum fee of

$302,800 prescribed by the Commission's regulations for a concurrent review under 10 CFR 170.21 A.(l). Since the maximum fee prescribed by regulation for an operating license has been paid, no additional operating license fee is required for San Onofre 3.

Sincerely, Uriginal Signed by Wm o. muer William 0. Miller, Chief License Fee Management Branch Office of Administration DISTRIBUTION:

PDR LPDR Docket File (w/copy of memo to files w/backup info.)

Manpower File CJHolloway, LFMB DWeiss, LFMB RDiggs, LFMB LFMB R/F oFcFe). LFMB

-LFMB: DM LFMB:ADM SURNAME> DWei C

ay WOMill 8405250330 840323 S -

C7 PDR ADOCK 05000362 DATE ]NO

/

P PDR NT..C F

ORM.318.(10-80).NRCM.0240.OFFICIAL.RE N'RC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY