UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 October 24, 2013

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO.3-REQUEST FOR ADDITIONAL INFORMATION REGARDING THE STEAM GENERATOR TUBE INSERVICE INSPECTION PERFORMED DURING THE SPRING 2013 REFUELING OUTAGE (TAC NO. MF2614)

Dear Sir or Madam:

By letter dated August 15, 2013, Entergy Nuclear Operations, Inc. submitted the Steam Generator Tube Inspection Report resulting from the steam generator inspections performed during the Spring 2013 refueling outage at the Indian Point Nuclear Generating Unit No. 3.

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). Based on our discussions we understand that a response to the RAI will be provided within 30 days of the date of this letter.

Please contact me at (301) 415-1364 if you have any questions on this issue.

Docket No. 50-286

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

INDIAN POINT NUCLEAR GENERATING, UNIT NO. 3 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE STEAM GENERATOR TUBE INSERVICE INSPECTIONS FOR THE SPRING 2013 REFUELING OUTAGE DOCKET NO. 50-286 By letter dated August, 15, 2013, (Agencywide Documents Access and Management Systems Accession Number [ADAMS] ML13235A047), Entergy Nuclear Operations, Inc., the licensee, submitted information summarizing the results of the 2013 steam generator (SG) tube inspections performed at Indian Point, Unit 3. The staff requests the following information:

1. The SG tube inspection report states that "no tubes were found with newly-formed degradation." It further states that there are eight small volumetric indications in the steam generator. If these eight tubes were inspected during the 3R 17 outage, please provide the size, location, orientation, and measured sizes of any service induced indications (regardless of whether they are new) including the eight small volumetric indications created in 2001 as a result of sludge lance rail wear.
2. Please clarify the results of the tube plug and primary bowl drain area inspections. For example, were all plugs present and in the correct position? Did any plugs show any evidence of leakage or degradation? For the primary bowl drain area inspections, were any anomalies or degradation detected?
3. Please clarify the results of the secondary side steam drum and top tube support plate inspections. For example, discuss deposit loading in the secondary side and discuss whether any anomalies or degradation were observed. The staff notes that in a prior inspection possible erosion/corrosion in two J-tube welds was identified. Please discuss whether these indications still exist or whether any other evidence exists that erosion/corrosion is occurring. If it is occurring, discuss the results of the condition monitoring and any planned corrective action.
4. Please discuss the results of the anti-vibration bar position verification.

Enclosure

October 24, 2013 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO.3-REQUEST FOR ADDITIONAL INFORMATION REGARDING THE STEAM GENERATOR TUBE INSERVICE INSPECTION PERFORMED DURING THE SPRING 2013 REFUELING OUTAGE (TAC NO. MF2614)

Dear Sir or Madam:

By letter dated August 15, 2013, Entergy Nuclear Operations, Inc. submitted the Steam Generator Tube Inspection Report resulting from the steam generator inspections performed during the Spring 2013 refueling outage at the Indian Point Nuclear Generating Unit No. 3.

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). Based on our discussions we understand that a response to the RAI will be provided within 30 days of the date of this letter.

Please contact me at (301) 415-1364 if you have any questions on this issue.

Docket No. 50-286

Enclosure:

Sincerely, Ira/

Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDoriDpr RidsNrrLAKGoldstein RidsRgn1 MaiiCenter RidsNrrDoriLpl1-1 LPL 1-1 Reading File RidsAcrsAcnw _MaiiCTR ABurritt, R 1 RidsNrrPMindianPoint RidsNrrDeEsgb CHunt, ESGB ADAMS ACCESSION NO.: ML13295A174 OFFICE LPL 1-1/PM LPL 1-1/LA ESGB/BC LPL 1-1/BC(A)

NAME DPickett KGoldstein GKulsea by memo dated RBeall DATE 10 /24/13 10 /24/13 10/18/13 10 /24/13 OFFICIAL RECORD COPY