OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
Enclosure transmitted herewith contain SUNSI. When separated from Enclosure, this
transmittal document is decontrolled.
LIMITED INTERNAL
DISTRIBUTION PERMITTED
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
October 8, 2013
Ernest J. Kapopoulos Jr.
Vice President
Carolina Power and Light Company
Shearon Harris Nuclear Power Plant
P.O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT
Dear Mr. Kapopoulos:
On August 29, 2013, the U. S. Nuclear Regulatory Commission (NRC) completed a security
inspection at your Shearon Harris Nuclear Plant, Unit 1. The inspectors discussed the results
of this inspection with Mr. J. Dufner and other members of your staff. The inspectors
documented the results of this inspection in the enclosed inspection report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
inspections, exemptions, requests for withholdings, of the NRC's Rules of Practice, a copy of
this letter will be available electronically for public inspection in the NRC Public Document
Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS), which is accessible from the NRC
Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance
with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security
vulnerability. Therefore, the material in the Enclosure will not be made available electronically
for public inspection in the NRC Public Document Room, or from the PARS component of
NRCs ADAMS. If you choose to provide a response and Security-Related Information is
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
E. Kapopoulos
2
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
necessary to provide an acceptable response, please mark your entire response Security-
Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with
10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In
accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response.
Sincerely,
/RA/
Binoy Desai, Chief
Plant Support Branch 2
Division of Reactor Safety
Docket No. 50-400
License No. NPF-63
Enclosure:
Inspection Report 05000400/2013404
w/Attachment: Supplementary Information (OUO)
cc: (See page 3)
X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED
OFFICE
RII:DRS/PSB2
RII:DRS/PSB2
RII:DRS/PSB2
RII:DRP/BR4
RII:DRS/PSB2
SIGNATURE
KXD
JHW2
RLP5
GTH1
BBD
NAME
K. Davis
J. Wallo
R. Patterson
G. Hopper
B. Desai
DATE
10/ 8 /2013
10/ 8 /2013
10/ 8 /2013
10/ 8 /2013
10/ 8 /2013
E-MAIL COPY
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
E. Kapopoulos
3
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
cc:
John Dufner
Plant General Manager
Carolina Power and Light Company
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562-0165
R. Keith Holbrook
Manager, Support Services
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562
David H. Corlett
Supervisor
Licensing/Regulatory Programs
Progress Energy
P.O. Box 165, Mail Code: Zone 1
New Hill, NC 27562-0165
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy
TPP-15
100 E. Davie Street
Raleigh, NC 27601
Edward T. O'Neil
Director
Nuclear Protective Serv and Emergency
Preparedness
Progress Energy
TPP-15
100 East Davie Street
Raleigh, NC 27601
Terrence E. Slake
Manager
Nuclear Plant Security
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562