2010 10CFR 50.59 Annual Report Page Replacement Due to Typographical Error
ML13211A313
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/25/2013
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13211A313 (4)


Text

DUKE Scott L. Batson ENiXGi 4Li

~kI~Df~VVice President Oconee Nuclear Station Duke Energy ONO1VP 17800 RochesterHwy Seneca, SC 29672 o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com July 25, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station Units 1, 2, and 3 Docket Nos. 50-269, -270, -287 2010 10 CFR 50.59 Annual Report Page Replacement Due to Typographical Error Attached is a revised page 2 of 6 to the Oconee Nuclear Station 2010 10 CFR 50.59 annual report that was submitted on June 30, 2011. This page is being revised because a typographical error was discovered by a Duke Energy internal assessment team. The typographical error on this page was associated with the number of pressurizer heaters and the corresponding maximum allowable steam space leakage rate. In the original submittal these two numbers were copied as one, however after review these numbers should be defined in two separate columns as seen in the attached document. Please replace page 2 of 6 in the original submittal with the attached document.

This submittal document contains no regulatory commitments.

If there are any questions, please contact Corey Gray at (864) 873-6325.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachment

-LF3C---7 www.duke-energy.com

U.S. Nuclear Regulatory Commission July 25, 2013 Page 2 xc: Mr. Victor McCree Regional Administrator, Region II U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Ga 30303-1257 Mr. John Boska, Project Manager (By electronic mail only)

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation One White Flint North, M/S 0-8 G9A 11555 Rockville Pike Rockville, MD 20852 Mr. Ed Crowe Senior NRC Resident Inspector Oconee Nuclear Station

July 25, 2013 Attachment

Attachment U. S. Nuclear Regulatory Commission Page 2 of 6 Type: Technical Specification Bases (TSB) 3.10.1 revision (AR# 00302658)

Title:

Revise TSB 3.10.1 for Unit 1 Required SSF (Standby Shutdown Facility)-Controlled Pressurizer Heaters

==

Description:==

This is a revision to TS BASES 3.10.1 and results from a surveillance and follow-up calculation update by established refueling-frequency processes which are specifically for the purpose of verifying or updating the TS 3.10.1 BASES tables for SSF-controlled pressurizer heaters, as outlined in Reactor Coolant System (RCS) Design Basis Document (DBD) Test Matrix (OSS-0254.00-00-1033 section B.13). The surveillance is performed at 100% Full Power (FP) after stable conditions are reached following startup from refueling, In this case the surveillance and calculation indicated a need to revise the TS BASES 3.1.10 table shown below for Unit 1. Pending revision of the TS BASES table, Unit 1 is considered Operable But Degraded Non-Conforming (OBDN). When the TS 3.10.1 BASES table is revised, the OBDN will be resolved and the affected table will read as follows (increase of 1 heater has been made on each line).

Unit 1 Number of Bank 2 Group B & C Maximum Allowed Pressurizer, Pressurizer Heaters Available Steam Space Leakage 17 0.50 GPM 16 0.25 GPM 15 0.10 GPM 14 0.00 GPM This increases by one (1) the number of SSF-controlled pressurizer heaters required for Unit 1.

The analysis supporting the change in OSC-3144 rev. 13.

This change is similar to previous TS BASES 3.10.1 changes for earlier updates to OSC-3144.

Implementing this change will resolve an OBDN condition on Unit 1 documented in PIP 0-10-1113.

The results of the evaluation show that:

- No TS change is required.

- No change to the UFSAR is required.