MONTHYEARML12307A2192012-10-30030 October 2012 License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation and Associated Proposed Tech Specs and Bases.. Project stage: Request ML13002A1342012-12-21021 December 2012 License Amendment Request on Purification of the Borated Water Storage Tanks, Acceptance Review, ME9877 Project stage: Acceptance Review ML13025A2542013-01-21021 January 2013 Supplement to License Amendment Request Associated with Reverse Osmosis System, License Amendment Request No. 2012-05, Supplement 1 Project stage: Supplement ML13052A1462013-02-21021 February 2013 Request to Operate a Reverse Osmosis System During Unit Operation Project stage: Other ML13172A0432013-06-11011 June 2013 Response to Request for Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation License Amendment Request No. 2012-05, Supplement 2 Project stage: Supplement ML13198A0482013-07-18018 July 2013 Request for Additional Information Regarding Use of a Reverse Osmosis System Project stage: RAI ML13268A4232013-09-0303 September 2013 Response to Request for Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 3 Project stage: Supplement ONS-2103-005, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 42013-10-21021 October 2013 Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 4 Project stage: Supplement ONS-2013-022, Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 52013-12-0202 December 2013 Additional Information Associated with License Amendment Request for Reverse Osmosis System Operation, License Amendment Request No. 2012-05, Supplement 5 Project stage: Supplement ML14106A4182014-04-30030 April 2014 Issuance of Amendment Regarding Use of Reverse Osmosis System Project stage: Approval 2013-12-02
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23284A3322023-10-11011 October 2023 Request for Additional Information Alternative Request (RA-22-0174) (L-2022-LLR-0060) ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23156A2452023-06-0505 June 2023 Audit Summary and RAI-RCI - Revised Enclosure ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23095A0052023-04-0404 April 2023 002 Radiation Safety Baseline Inspection Information Request ML23086C0362023-03-27027 March 2023 Request for Additional Information Steam Generator Tube Inspection Report (03R31) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23038A1832023-02-0707 February 2023 Request for Additional Information Alternative Request (RA-22-0174) to Use ASME Code Case N-752 ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final ML22251A2902022-09-0808 September 2022 Request for Additional Information Additional Mode Change Limitations Applicable to the Adoption of Technical Specifications Tasks Force Traveler (TSTF) No. 359, Revision 9 ML22234A0052022-08-30030 August 2022 SLRA - Feedback for RAI B2.1.7-4a to Duke - August 16, 2022 ML22157A0042022-06-0606 June 2022 10 CFR 50.59 Inspection Initial Information Request ML22157A0012022-06-0101 June 2022 Email from NRC (Angela Wu) to Duke (Paul Guill) - Oconee SLRA - Additional NRC Comments on RAI 4.6.1-1a ML22154A2122022-06-0101 June 2022 SLRA - 2nd Round RAI B2.1.7-4b ML22124A1632022-05-0303 May 2022 (Public) Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22124A1612022-05-0303 May 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.7-4a ML22122A0182022-04-28028 April 2022 Attachment: Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A0192022-04-28028 April 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B2.1.9-2a ML22122A1312022-04-27027 April 2022 (Public) Oconee SLRA - 2nd Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 Redacted ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22113A0092022-04-20020 April 2022 Attachment: Oconee SLRA - Final RAI 3.1.2-1 ML22112A0072022-04-20020 April 2022 Email from Marieliz Johnson (NRC) to Steve Snider (Duke) - Oconee SLRA - Request for Confirmation of Information 3.5.2.2.2.6-L ML22081A0062022-03-21021 March 2022 Attachment: Oconee SLRA - 2nd Round RAI B4.1-3 ML22081A0052022-03-21021 March 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - 2nd Round RAI B4.1-3 ML22080A0772022-03-16016 March 2022 SLRA - RAI Set 4 (2nd Round Rais) ML22069A0012022-03-0808 March 2022 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 4 ML22063A4502022-03-0404 March 2022 Request for Additional Information Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump RA-22-0036, Responses to NRC Request for Additional Information Set 22022-02-14014 February 2022 Responses to NRC Request for Additional Information Set 2 ML22019A1042022-01-18018 January 2022 Attachment: Oconee SLRA - Final Requests for Additional Information - Set 3 ML22019A2442022-01-18018 January 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000269/2022010, 05000270/2022010, 05000287/2022010) and Request for Information (RFI) ML22019A1032022-01-18018 January 2022 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Requests for Additional Information - Set 3 ML22012A0422022-01-11011 January 2022 SLRA - Final Requests for Additional Information - Set 2 ML22010A1132022-01-0505 January 2022 SLRA - RCIs - Set 3 ML21333A0392021-11-29029 November 2021 RP Inspection Document Request ML21330A0192021-11-23023 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 2 ML21327A2782021-11-23023 November 2021 Email from Angela Wu (NRC) to Steve Snider (Duke) - Oconee SLRA - Final RAIs (Set 1 and 2nd Round RAI B2.1.27-1a) ML21327A2792021-11-23023 November 2021 SLRA - Final Requests for Additional Information - Set 1 ML21327A2802021-11-23023 November 2021 SLRA - Final 2nd Round RAI - RAI B2.1.27-1a ML21313A2342021-11-0404 November 2021 Attachment: Oconee SLRA - Final Requests for Confirmation of Information - Set 1 ML21274A0682021-10-0101 October 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21273A0492021-09-30030 September 2021 Request for Additional Information Alternative Request (ON-RPI-OMN-28) to Use Code Case OMN-28 ML21271A5892021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Draft) ML21271A5902021-09-28028 September 2021 SLRA - RAI B2.1.27-1 (Final) ML21271A5882021-09-22022 September 2021 SLRA - Request for Additional Information B2.1.27-1 - Email from Angela Wu (NRC) to Steve Snider (Duke) ML21217A1912021-08-0505 August 2021 Request for Additional Information Alternative Request (RA-20-0334) Regarding Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21190A0172021-07-0808 July 2021 NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3 - Request for Additional Information Alternative for ISI RPV Weld Examination from 10 to 20 Years (EPID-L-2021-LLR-0004) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) 2023-07-03
[Table view] Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2013 Mr. Scott Batson Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1,2, AND 3, REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT APPLICATION FOR USE OF A REVERSE OSMOSIS PURIFICATION SYSTEM (TAC NOS. ME9877, ME9878, AND ME9879)
Dear Mr. Batson:
On October 30,2012, as supplemented on January 21,2013, and June 11, 2013, Duke Energy Carolinas, LLC (Duke), submitted an application for a proposed amendment for the Oconee Nuclear Station, Units 1, 2, and 3, which would allow the use of a reverse osmosis system to purify the borated water storage tanks and the spent fuel pools during power operation.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On July 18, 2013, the Duke staff indicated that a response to the RAI would be provided within 45 days of the date of this letter.
If you have any questions, please call me at 301-415-2901.
Sincerely, D.~
~ J hn P. Boska, Senior Project Manager lant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION REGARDING USE OF A REVERSE OSMOSIS SYSTEM DUKE ENERGY CAROLINAS, LLC OCONEE NUCLEAR STATION. UNITS 1,2. AND 3 DOCKET NOS. 50-269, 50-270 AND 50-287 Duke Energy Carolinas, LLC (Duke or the licensee) originally submitted a license amendment request (LAR) dated November 15, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103220101) requesting approval to operate a reverse osmosis (RO) purification system at Oconee Nuclear Station (ONS), Units 1, 2, and 3, to purify the borated water storage tanks and the spent fuel pools during power operation. Duke then submitted responses to the Nuclear Regulatory Commission's (NRC's) request for additional information (RAI) on the following dates: February 18, 2011 (ADAMS Accession No. ML110550616), May 12, 2011 (ADAMS Accession No. ML11137A112), August 2,2011 (ADAMS Accession No. ML11215A198), October 10, 2011 {ADAMS Accession No. ML11285A302}, and December 15, 2011 {ADAMS Accession No. ML11354A253}. Based on discussions between Duke and the NRC, by letter dated April 3,2012, Duke requested to withdraw this LAR, and the NRC staff agreed by letter dated April 12, 2012. In a letter dated October 30, 2012 (ADAMS Accession No. ML12307A219), as supplemented on January 21,2013 (ADAMS Accession No. ML13025A254), and June 11,2013 (ADAMS Accession No. ML13172A043), Duke submitted a revised LAR for the use of the RO system. The Nuclear Regulatory Commission (NRC) staff is reviewing the submittals and has the following questions.
RAI-16 (Follow-up to previous RAI 7):
In lieu of automatically actuated isolation valves, the LAR proposes to use a time critical operator action (TCOA) to ensure the RO system supply piping boundary valves are manually closed before initiation of recirculation to prevent post loss-of-coolant accident (LOCA) fluids from entering the RO system.
Regulatory Guide 1.183, Regulatory Position 5.1.2 states that:
Credit may be taken for accident mitigation features that are classified as safety-related, are required to be operable by technical specifications, are powered by emergency power sources, and are either automatically actuated or, in limited cases, have actuation requirements explicitly addressed in emergency operating procedures. The single active component failure that results in the most limiting radiological consequences should be assumed.
The licensee has not provided adequate justification for why these boundary valves do not need to be automatically actuated. The proposed boundary valves are manually operated and both located in the same room. A dedicated operator will not be used to ensure the valves are closed when directed by the emergency operating procedures and no remote indication has been Enclosure
-2 provided in order to verify the valves are closed. During the recirculation phase, these valves isolate the reactor coolant system from the environment similar to containment isolation valves, which must be locked closed or automatically isolated (General Design Criteria 56/57). As discussed in Generic Letter (GL) 91-08, normally closed isolation valves may be opened for limited time periods under administrative controls, which includes stationing of a dedicated operator. As discussed in Information Notice 97-78, if a dedicated operator is not provided, an evaluation of the impact of a single operator error should be performed, including the ability to recover from credible operator errors and the time required to make the recovery. Therefore, provide one of the following:
- 1. An analysis of the impact of not isolating the RO system on the radiological consequences of a design basis accident.
- 2. Automatically actuated RO system boundary valves.
- 3. A dedicated operator responsible for closing the RO system boundary valves, with the controls for maintaining operability of the RO system valves using the dedicated operator discussed in the TS Bases.
- 4. An evaluation of the impact of a single operator error on the ability to perform the TCOA within 33 minutes, including failure of the operator to be dispatched to perform the action, the ability of the operator to get to the valves using more than one pathway, and the impact of having no verification that the action has been performed.
RAI-17 (follow-up to previous RAI 9)
Explain why the spent fuel (SF) cooling and purification system will not become contaminated with post-LOCA back leakage, since the SF cooling and purification system connects to the borated water storage tank (BWST) with the valves open to carry the RO discharge flow back to the BWST, and the BWST itself is subject to post-LOCA back leakage.
July 18, 2013 Mr. Scott Batson Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT APPLICATION FOR USE OF A REVERSE OSMOSIS PURIFICATION SYSTEM (TAC NOS. ME9877, ME9878, AND ME9879)
Dear Mr. Batson:
On October 30, 2012, as supplemented on January 21, 2013, and June 11, 2013, Duke Energy Carolinas, LLC (Duke), submitted an application for a proposed amendment for the Oconee Nuclear Station, Units 1, 2, and 3, which would allow the use of a reverse osmosis system to purify the borated water storage tanks and the spent fuel pools during power operation.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On July 18, 2013, the Duke staff indicated that a response to the RAI would be provided within 45 days of the date of this letter.
If you have any questions, please call me at 301-415-2901.
Sincerely, IRAJ John P. Boska, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsAcrsAcnw_MailCtr Resource RidsNrrDorlDpr Resource LPLlI-1 RtF RidsNrrLASFigueroa Resource RidsNrrDorlLp2-1 Resource RidsNrrPMOconee RidsRgn2MailCenter Resource RidsNrrDraAhpb RidsNrrDraAadb RidsNrrDeEmcb RidsNrrDssStsb ADAMS Accession No.: ML13198A048 *See email iOFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/AHPB/BC*
NAME JBoska SFigueroa UShoop DATE 7118113 7/18/2013 7/11/13 OFFICE NRR/AADB/BC* NRRtLPL2-1/BC NRR/LPL2-1/PM NAME TTate RPascarelli JBoska DATE 6/27/13 7118113 7/18113 OFFICIAL RECORD COpy