IP-204 1
TASK CONDITIONS:
- 1.
You are an EO.
- 2.
The Control Room has been evacuated.
- 3.
1BwOA PRI-5, Control Room Inaccessibility, is in progress.
- 4.
1CV112D is stuck closed and 1CV112E will not open locally due to the handwheel not engaging.
INITIATING CUES:
- 1.
You have been directed to open 1CV112E at MCC 132X4 Cubicle C2 per 1BwOA ELEC-5.
IP-204 2
TASK TITLE:
Open RWST to CV Pump Suction Valve (1CV112E) from the MCC JPM No.:
IP-204 REV:
2013 NRC TPO No.:
4.D.OA-35 K&A No.:
006000 2.4.35 TASK No.:
R-OA-099, Establish Emergency Control of K&A IMP:
3.8/4.0 Safe Shutdown equipment EXAMINEE:
EVALUATOR:
DATE:
The Examinee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 3-6 APPROX COMPLETION TIME: 31 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1.
1BwOA ELEC-5, Attachment C, Rev. 105 MATERIALS:
- 1.
1BwOA ELEC-5, Attachment C, Rev. 105
- 2.
PPE for electrical work TASK STANDARDS:
- 1.
Open 1CV112E from the MCC.
TASK CONDITIONS:
- 1.
You are an EO.
- 2.
The Control Room has been evacuated.
- 3.
1BwOA PRI-5, Control Room Inaccessibility, is in progress.
- 4.
1CV112D is stuck closed and 1CV112E will not open locally due to the handwheel not engaging.
INITIATING CUES:
- 1.
You have been directed to open 1CV112E at MCC 132X4 Cubicle C2 per 1BwOA ELEC-5.
IP-204 3
RECORD START TIME NOTE: The student must obtain/locate high voltage protective gear (face shield, apron or approved switching coverall, gloves, hardhat, eye protection) and screwdriver to perform this JPM. Require examinees to identify where a set of jumpers would be obtained. It is NOT necessary to don the gear for the simulation.
NOTE: DO NOT ALLOW EXAMINEE TO ACTUALLY OPEN THE MCC CUBICLE DOOR. It is the intent of this JPM for the examinee to locate the MCC cubicle that the jumper will be installed in and explain how the MCC door can be opened. The evaluator should then show the examinee the attached photo of an open MCC and the remainder of the JPM will consist of the examinee explaining their actions to the evaluator using the photo.
PERFORMANCE STEP STANDARD Circle applicable
- 1.
Refer to 1BwOA ELEC-5, Attachment C, step 1.
CUE:
After examinee locates procedure, provide a copy Locate and open 1BwOA ELEC-5, Attachment C, step 1.
SAT UNSAT N/A Comments:
- 2.
Locate proper MCC and cubicle.
Locate MCC 132X4, Cub C2.
SAT UNSAT N/A Comments:
- 3.
De-energize valve.
CUE:
Brkr is OFF and Cubicle door is OPEN.
NOTE: At this point provide examinee with attached photo of 480V MCC valve breaker cubicle.
Turn Breaker OFF and OPEN cubicle door for valve to be opened.
SAT UNSAT N/A Comments:
- 4.
Install jumper.
CUE:
Jumper is installed between points 2 and 3.
Remove terminal cover, then install jumper between points 2 and 3 on terminal board at front of the cubicle. (Point out to evaluator on photo where jumper will be installed)
SAT UNSAT N/A Comments:
IP-204 4
- 5.
Override interlock and then turn breaker on.
NOTE: The door interlock for closing the breaker with the door open, is defeated by pushing the steel bar (that protrudes through a slot in the top of the cubicle bucket above the breaker handle) toward the rear of the cubicle.
NOTE: The interlock screw above the breaker handle is NOT the correct interlock for this JPM. The screw is used to defeat the interlock that prevents opening the door while the breaker is closed. If the examinee tries to use that interlock to close the breaker with the door open, CUE the examinee that the breaker will not close.
CUE:
Interlock is overridden, breaker is ON, O contactor energizes (contactor posts sucked into the picture).
Override breaker/door interlock, then turn breaker ON. (Point out to evaluator on photo how breaker closing interlock will be over ridden)
SAT UNSAT N/A Comments:
- 6.
Restore breaker.
Note: O contactor is upper contactor (when drops out, contactor posts stick outward from picture toward you).
CUE:
O contactor has dropped out.
Breaker is Off.
Jumper is removed.
Terminal cover is installed.
Cubicle door is closed.
When O contactor drops out:
Immediately turn breaker OFF.
Remove the jumper.
o Install terminal cover.
Close the cubicle door.
SAT UNSAT N/A Comments:
- 7.
Verify valve position CUE:
Another EO at 1CV112E reports that 1CV112E is open.
Verify valve position locally by visual inspection.
SAT UNSAT N/A Comments:
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME COMMENTS:
IP-204 5
SIMULATOR SETUP INSTRUCTIONS JPM NO: IP-204 REQUIRED SIMULATOR MODE (S): N/A, IN PLANT MALFUNCTION #S: N/A COMMENTS:
(Final)
1 2 3 4 5 X2 6 7 8 9 10 11
LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 A.
A.
PURPOSE PURPOSE This procedure provides the actions required for local emergency This procedure provides the actions required for local emergency control of loads necessary for safe shutdown operation of the control of loads necessary for safe shutdown operation of the plant.
plant.
B.
B.
SYMPTOMS OR ENTRY CONDITIONS SYMPTOMS OR ENTRY CONDITIONS 1) 1)
The following conditions may cause entry into this procedure:
The following conditions may cause entry into this procedure:
oo Any event causing a loss of normal controls for safe shutdown Any event causing a loss of normal controls for safe shutdown equipment when operation of that equipment is necessary for equipment when operation of that equipment is necessary for safe plant control.
safe plant control.
oo A loss of normal control of a 480V, 4KV or 6.9KV breaker.
A loss of normal control of a 480V, 4KV or 6.9KV breaker.
oo A loss of normal control of a motor operated valve where A loss of normal control of a motor operated valve where local operation is local operation is NOT NOT prudent.
prudent.
Page 1 of 27 Page 1 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
Operators shall wear high voltage Operators shall wear high voltage
protective gear when operating any protective gear when operating any
circuit breaker locally.
circuit breaker locally.
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
Local closure of a breaker will Local closure of a breaker will
start equipment with its starting start equipment with its starting
interlocks disabled.
interlocks disabled.
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º NOTE NOTE ALL ALL ESF equipment operated in the ESF equipment operated in the local emergency mode should be local emergency mode should be powered from powered from ONE ONE ESF Bus.
ESF Bus.
Non-emergency mode equipment should Non-emergency mode equipment should be powered from the other ESF bus.
be powered from the other ESF bus.
NOTE NOTE With this procedure in effect, the With this procedure in effect, the Emergency Director shall evaluate Emergency Director shall evaluate for Emergency Plan conditions.
for Emergency Plan conditions.
111 IMPLEMENT APPROPRIATE IMPLEMENT APPROPRIATE IMPLEMENT APPROPRIATE ATTACHMENT ATTACHMENT ATTACHMENT:::
oo 4KV or 6.9KV Breaker Local 4KV or 6.9KV Breaker Local Operation:
Operation:
oo Closing Breaker -
Closing Breaker -
ATTACHMENT A, Step 1 (Page 4)
ATTACHMENT A, Step 1 (Page 4) oo Opening Breaker -
Opening Breaker -
ATTACHMENT A, Step 3 (Page 7)
ATTACHMENT A, Step 3 (Page 7)
Step continued on next page Step continued on next page Page 2 of 27 Page 2 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 Step 1 (continued)
Step 1 (continued) oo 480V Rackable Breaker Local 480V Rackable Breaker Local Operation:
Operation:
oo Closing Breaker -
Closing Breaker -
ATTACHMENT B, Step 1 (Page 8)
ATTACHMENT B, Step 1 (Page 8) oo Opening Breaker -
Opening Breaker -
ATTACHMENT B, Step 2 (Page 9)
ATTACHMENT B, Step 2 (Page 9) oo Motor Operated Valve (MOV)
Motor Operated Valve (MOV)
Local Operation:
Local Operation:
oo Open MOV -
Open MOV -
ATTACHMENT C, Step 1 ATTACHMENT C, Step 1 (Page 10)
(Page 10) oo Close MOV -
Close MOV -
ATTACHMENT C, Step 2 ATTACHMENT C, Step 2 (Page 13)
(Page 13) oo Component Cooling Pump Local Component Cooling Pump Local Start -
Start -
ATTACHMENT D (Page 17)
ATTACHMENT D (Page 17) oo SVAG VALVE MCC energization -
SVAG VALVE MCC energization -
ATTACHMENT E (Page 22)
ATTACHMENT E (Page 22)
-END-
-END-Page 3 of 27 Page 3 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT A (PG 1 OF 4)
ATTACHMENT A (PG 1 OF 4) 4KV OR 6.9KV BREAKER LOCAL OPERATION 4KV OR 6.9KV BREAKER LOCAL OPERATION
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
EITHER of the following will disable EITHER of the following will disable
protective trips on 4KV or 6.9KV protective trips on 4KV or 6.9KV
equipment:
equipment:
oo Loss of DC control power Loss of DC control power
oo Control power fuses removed Control power fuses removed
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º 111 LOCAL CLOSING OF 4KV OR 6.9KV LOCAL CLOSING OF 4KV OR 6.9KV LOCAL CLOSING OF 4KV OR 6.9KV BREAKERS BREAKERS BREAKERS:::
a.
- a. Check breaker -
Check breaker - RACKED IN RACKED IN a.
- a. Perform the following:
Perform the following:
1)
- 1) Pull the trip and close Pull the trip and close circuit fuse(s).
circuit fuse(s).
2)
- 2) Rack the breaker in.
Rack the breaker in.
3)
- 3) Verify floor trip Verify floor trip mechanism reset.
mechanism reset.
b.
- b. Check relay targets -
Check relay targets - NOT UP NOT UP b.
- b. IF IF redundant equipment is redundant equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO Step 1a.
Step 1a.
IF IF NO equipment is NO equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
c.
- c. Check trip and close circuit Check trip and close circuit c.
- c. Install the fuses.
Install the fuses.
fuses -
fuses - INSTALLED INSTALLED d.
- d. Check closing spring -
Check closing spring - CHARGED CHARGED d.
- d. Charge spring with the Charge spring with the charging lever.
charging lever.
e.
- e. Verify MCR control switch in -
Verify MCR control switch in -
AFTER TRIP AFTER TRIP f.
- f. Close breaker with close reach Close breaker with close reach rod rod Step continued on next page Step continued on next page Page 4 of 27 Page 4 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT A (PG 2 OF 4)
ATTACHMENT A (PG 2 OF 4) 4KV OR 6.9KV BREAKER LOCAL OPERATION 4KV OR 6.9KV BREAKER LOCAL OPERATION Step 1 (continued)
Step 1 (continued) g.
- g. Verify equipment -
Verify equipment - RUNNING RUNNING::
g.
- g. IF IF redundant equipment is redundant equipment is available, available, oo Breaker indicates -
Breaker indicates - CLOSED CLOSED THEN THEN RETURN TO RETURN TO RETURN TO Step 1a.
Step 1a.
oo Ammeter at MCB indicates -
Ammeter at MCB indicates -
IF IF ALL available equipment ALL available equipment RUN CURRENT RUN CURRENT fails to start, fails to start, THEN THEN GO TO GO TO GO TO Step 2 (Next Step 2 (Next oo Local Observation Local Observation Page).
Page).
h.
- h. Establish alternate means Establish alternate means cubicle cooler(s) -
cubicle cooler(s) - RUNNING RUNNING of cooling for ESF pump of cooling for ESF pump cubicle(s).
cubicle(s).
i.
- i. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect.
in effect.
Page 5 of 27 Page 5 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT A (PG 3 OF 4)
ATTACHMENT A (PG 3 OF 4) 4KV OR 6.9KV BREAKER LOCAL OPERATION 4KV OR 6.9KV BREAKER LOCAL OPERATION
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
Do Do NOT NOT attempt to close a breaker attempt to close a breaker
without control power if its power without control power if its power
cable is damaged.
cable is damaged.
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º 222 START OF EQUIPMENT WITHOUT START OF EQUIPMENT WITHOUT START OF EQUIPMENT WITHOUT CONTROL POWER CONTROL POWER CONTROL POWER:::
a.
- a. Select equipment for start Select equipment for start without control power without control power b.
- b. Check relay targets -
Check relay targets - NOT UP NOT UP b.
- b. IF IF redundant equipment is redundant equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO Step 2a.
Step 2a.
IF IF NO equipment is NO equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
c.
- c. Pull trip and close circuit Pull trip and close circuit fuses fuses d.
- d. Check closing spring -
Check closing spring - CHARGED CHARGED d.
- d. Charge spring with the Charge spring with the charging lever.
charging lever.
e.
- e. Close breaker with close reach Close breaker with close reach rod rod f.
- f. Verify equipment -
Verify equipment - RUNNING RUNNING::
f.
- f. IF IF redundant equipment is redundant equipment is available, available, oo Breaker indicates -
Breaker indicates - CLOSED CLOSED THEN THEN RETURN TO RETURN TO RETURN TO Step 2a.
Step 2a.
oo Ammeter at MCB indicates -
Ammeter at MCB indicates -
IF IF ALL available equipment ALL available equipment RUN CURRENT RUN CURRENT fails to start, fails to start, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure oo Local observation Local observation and step in effect.
and step in effect.
g.
- g. Establish alternate means Establish alternate means cubicle cooler(s) -
cubicle cooler(s) - RUNNING RUNNING of cooling for ESF pump of cooling for ESF pump cubicle(s).
cubicle(s).
h.
- h. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect.
in effect.
Page 6 of 27 Page 6 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT A (PG 4 OF 4)
ATTACHMENT A (PG 4 OF 4) 4KV OR 6.9KV BREAKER LOCAL OPERATION 4KV OR 6.9KV BREAKER LOCAL OPERATION 333 LOCAL OPENING OF 4KV OR 6.9KV LOCAL OPENING OF 4KV OR 6.9KV LOCAL OPENING OF 4KV OR 6.9KV BREAKERS BREAKERS BREAKERS:::
a.
- a. Pull trip and close circuit Pull trip and close circuit fuses fuses b.
- b. Open breaker using open reach Open breaker using open reach rod rod c.
- c. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect.
in effect.
-END-
-END-Page 7 of 27 Page 7 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT B (PG 1 OF 2)
ATTACHMENT B (PG 1 OF 2) 480V RACKABLE BREAKER LOCAL OPERATION 480V RACKABLE BREAKER LOCAL OPERATION NOTE NOTE 480 Volt breakers protective trips 480 Volt breakers protective trips do do NOT NOT require control power to require control power to function.
function.
NOTE NOTE When shifting RCFC's from high to When shifting RCFC's from high to low speed a 20 second time delay low speed a 20 second time delay must be observed to prevent must be observed to prevent equipment damage.
equipment damage.
- 1
- 1
- 1 LOCAL CLOSING OF 480V BREAKERS LOCAL CLOSING OF 480V BREAKERS LOCAL CLOSING OF 480V BREAKERS:::
a.
- a. Check breaker -
Check breaker - RACKED IN RACKED IN a.
- a. Perform the following:
Perform the following:
1)
- 1) Pull the trip and close Pull the trip and close circuit fuse.
circuit fuse.
2)
- 2) Rack the breaker in.
Rack the breaker in.
b.
- b. Check trip and close circuit Check trip and close circuit b.
- b. Install the fuse.
Install the fuse.
fuse -
fuse - INSTALLED INSTALLED c.
- c. Check closing spring -
Check closing spring - CHARGED CHARGED c.
- c. Charge the closing spring.
Charge the closing spring.
d.
- d. Verify MCR control switch in -
Verify MCR control switch in -
AFTER TRIP AFTER TRIP e.
- e. Depress CLOSE pushbutton on Depress CLOSE pushbutton on front of breaker front of breaker Step continued on next page Step continued on next page Page 8 of 27 Page 8 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT B (PG 2 OF 2)
ATTACHMENT B (PG 2 OF 2) 480V RACKABLE BREAKER LOCAL OPERATION 480V RACKABLE BREAKER LOCAL OPERATION Step 1 (continued)
Step 1 (continued) f.
- f. Check equipment -
Check equipment - RUNNING RUNNING::
f.
- f. IF IF redundant equipment is redundant equipment is available, available, oo Breaker indicates -
Breaker indicates - CLOSED CLOSED THEN THEN RETURN TO RETURN TO RETURN TO Step 1a Step 1a (Previous Page).
(Previous Page).
oo Ammeter at MCB indicates -
Ammeter at MCB indicates -
RUN CURRENT RUN CURRENT IF IF ALL available equipment ALL available equipment fails to start, fails to start, oo Local Observation Local Observation THEN THEN perform the perform the following:
following:
1)
- 1) Select equipment to Select equipment to start without control start without control power.
power.
2)
- 2) Pull the trip and close Pull the trip and close circuit fuse for the circuit fuse for the selected equipment.
selected equipment.
3)
- 3) RETURN TO RETURN TO RETURN TO Step 1c Step 1c (Previous Page).
(Previous Page).
g.
- g. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect 222 LOCAL OPENING OF 480V BREAKERS LOCAL OPENING OF 480V BREAKERS LOCAL OPENING OF 480V BREAKERS:::
a.
- a. Pull trip and close circuit Pull trip and close circuit fuse fuse b.
- b. Depress TRIP pushbutton on Depress TRIP pushbutton on front of breaker front of breaker c.
- c. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect
-END-
-END-Page 9 of 27 Page 9 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 1 OF 7)
ATTACHMENT C (PG 1 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION NOTE NOTE If a seal-in signal is present the If a seal-in signal is present the MOV will reclose after the "O" MOV will reclose after the "O" contactor drops out, unless the MOV contactor drops out, unless the MOV is IMMEDIATELY deenergized.
is IMMEDIATELY deenergized.
NOTE NOTE Valves 1SI8811A or B can not be Valves 1SI8811A or B can not be jumpered OPEN without first lifting jumpered OPEN without first lifting the lead to defeat the shorting the lead to defeat the shorting circuit.
circuit.
111 TO OPEN ANY MOV (480 VOLT MCC)
TO OPEN ANY MOV (480 VOLT MCC)
TO OPEN ANY MOV (480 VOLT MCC):::
a.
- a. Turn breaker OFF Turn breaker OFF b.
- b. Open cubicle door for valve to Open cubicle door for valve to be opened be opened Step continued on next page Step continued on next page Page 10 of 27 Page 10 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 2 OF 7)
ATTACHMENT C (PG 2 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION Step 1 (continued)
Step 1 (continued) c.
- c. Check valve -
Check valve - NOT LISTED BELOW NOT LISTED BELOW::
c.
- c. Locally open valve(s):
Locally open valve(s):
1SI8811A 1SI8811A oo Open electrically from Open electrically from
1SI8811B 1SI8811B breaker:
breaker:
a) a) Lift lead from Point Lift lead from Point 10 on terminal strip 10 on terminal strip at front of cubicle at front of cubicle to defeat shorting to defeat shorting circuit:
circuit:
oo 1SI8811A MCC 131X1 1SI8811A MCC 131X1 M3 (364' S12)
M3 (364' S12) oo 1SI8811B MCC 132X4 1SI8811B MCC 132X4 H1 (426' S12)
H1 (426' S12) b)
b) Tape end of lead.
Tape end of lead.
c) c) Notify the control Notify the control room to log lifted room to log lifted lead in TCC Log.
d) d) GO TO GO TO GO TO Step 1d Step 1d oo Open manually at valve:
Open manually at valve:
a) a) Locally open valve Locally open valve using the handwheel.
using the handwheel.
b) b) RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
d.
- d. Install jumper between points 2 Install jumper between points 2 and 3 on terminal board at and 3 on terminal board at front of cubicle front of cubicle e.
- e. Override breaker and door Override breaker and door interlock interlock f.
- f. Turn breaker ON Turn breaker ON Step continued on next page Step continued on next page Page 11 of 27 Page 11 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 3 OF 7)
ATTACHMENT C (PG 3 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION Step 1 (continued)
Step 1 (continued) g.
- g. WHEN "O" contactor drops out, WHEN "O" contactor drops out, THEN immediately turn breaker THEN immediately turn breaker OFF OFF h.
- h. Remove jumper Remove jumper i.
- i. Close cubicle door Close cubicle door j.
- j. Check valve position by local Check valve position by local j.
- j. Locally open valve at Locally open valve at inspection if possible inspection if possible Shift Manager's Shift Manager's discretion.
discretion.
k.
- k. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect Page 12 of 27 Page 12 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 4 OF 7)
ATTACHMENT C (PG 4 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION NOTE NOTE If a seal-in signal is present the If a seal-in signal is present the MOV will reopen after the "C" MOV will reopen after the "C" contactor drops out, unless the MOV contactor drops out, unless the MOV is IMMEDIATELY deenergized.
is IMMEDIATELY deenergized.
NOTE NOTE The valves listed in step 2c (Next The valves listed in step 2c (Next Page) can not be jumpered Page) can not be jumpered Closed Closed without first lifting a lead to without first lifting a lead to defeat the shorting circuit.
defeat the shorting circuit.
NOTE NOTE Valves 1AF013C, D, G and H require Valves 1AF013C, D, G and H require placing the RSDP Transfer Control placing the RSDP Transfer Control Switch in LOCAL to defeat the Switch in LOCAL to defeat the shorting circuit. Transfer switch shorting circuit. Transfer switch must be maintained in LOCAL after must be maintained in LOCAL after use.
use.
222 TO CLOSE ANY MOV (480 VOLT MCC)
TO CLOSE ANY MOV (480 VOLT MCC)
TO CLOSE ANY MOV (480 VOLT MCC):::
a.
- a. Turn breaker OFF Turn breaker OFF b.
- b. Open cubicle door for valve to Open cubicle door for valve to be closed be closed Step continued on next page Step continued on next page Page 13 of 27 Page 13 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 5 OF 7)
ATTACHMENT C (PG 5 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION Step 2 (continued)
Step 2 (continued) c.
- c. Check valve -
Check valve - NOT LISTED BELOW NOT LISTED BELOW::
c.
- c. Locally close valve:
Locally close valve:
1CV112B 1CV112B oo Close electrically from Close electrically from
1CV112C 1CV112C breaker:
breaker:
1CV8110 1CV8110
1CV8111 1CV8111 a) a) Lift lead to defeat Lift lead to defeat
1SX004 1SX004 shorting ciruit:
shorting ciruit:
1SX010 1SX010
1SX011 1SX011 oo 1CV112B MCC 131X5 1CV112B MCC 131X5
1SX033 1SX033 A5 (426' Q16)
A5 (426' Q16)
1SX034 1SX034 (Point 13)
(Point 13)
1SX136 1SX136 oo 1CV112C MCC 132X4 1CV112C MCC 132X4
G1 (426' S12 CWA)
G1 (426' S12 CWA)
(Point-13)
(Point-13)
oo 1CV8110 MCC 131X1 1CV8110 MCC 131X1 M1 (364' S12)
M1 (364' S12)
(Point 14)
(Point 14) oo 1CV8111 MCC 132X4 1CV8111 MCC 132X4 C4 (426' S12)
C4 (426' S12)
(Point 14)
(Point 14) oo 1SX004 MCC 131X1 A2 1SX004 MCC 131X1 A2 (364' S12)
(364' S12)
(Point-13)
(Point-13) oo 1SX010 MCC 132X1 H4 1SX010 MCC 132X1 H4 (364' P18)
(364' P18)
(Point-13)
(Point-13) oo 1SX011 MCC 132X1 B2 1SX011 MCC 132X1 B2 (364' P18)
(364' P18)
(Point-13)
(Point-13) oo 1SX033 MCC 131X1 A4 1SX033 MCC 131X1 A4 (364' S12)
(364' S12)
(Point-13)
(Point-13) oo 1SX034 MCC 132X1 B4 1SX034 MCC 132X1 B4 (364' P18)
(364' P18)
(Point-13)
(Point-13) oo 1SX136 MCC 132X1 H5 1SX136 MCC 132X1 H5 (364' P18)
(364' P18)
(Point-13)
(Point-13) b)
b) Tape end of lead.
Tape end of lead.
Step continued on next page Step continued on next page Page 14 of 27 Page 14 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 6 OF 7)
ATTACHMENT C (PG 6 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION Step 2 (continued)
Step 2 (continued) c)
c) Notify the control Notify the control room to log lifted room to log lifted lead in TCC Log.
d) d) GO TO GO TO GO TO Step 2e.
Step 2e.
oo Locally close valve Locally close valve using the hand wheel.
using the hand wheel.
d.
- d. Check valve -
Check valve - NOT LISTED BELOW NOT LISTED BELOW::
d.
- d. Close electrically from Close electrically from breaker:
breaker:
1AF013C 1AF013C
1AF013D 1AF013D 1)
- 1) Defeat shorting circuit:
Defeat shorting circuit:
1AF013G 1AF013G
1AF013H 1AF013H a) a) Place RSDP Place RSDP Local/Remote Transfer Local/Remote Transfer C/S in LOCAL.
C/S in LOCAL.
b) b) Install a jumper Install a jumper between points 21 and between points 21 and 5 on terminal board 5 on terminal board in front of cubicle.
in front of cubicle.
2)
Log.
3)
- 3) Notify the control room Notify the control room to log switch position to log switch position using an Abnormal using an Abnormal Component Position Component Position Sheet.
Sheet.
4)
- 4) GO TO GO TO GO TO Step 2f (Next Step 2f (Next Page).
Page).
e.
- e. Install jumper between points 4 Install jumper between points 4 and 5 on terminal board at and 5 on terminal board at front of cubicle front of cubicle Step continued on next page Step continued on next page Page 15 of 27 Page 15 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT C (PG 7 OF 7)
ATTACHMENT C (PG 7 OF 7)
MOTOR OPERATED VALVE (MOV) LOCAL OPERATION MOTOR OPERATED VALVE (MOV) LOCAL OPERATION Step 2 (continued)
Step 2 (continued) f.
- f. Override breaker and door Override breaker and door interlock interlock g.
- g. Turn breaker ON Turn breaker ON h.
- h. WHEN "C" contactor drops out, WHEN "C" contactor drops out, THEN immediately turn breaker THEN immediately turn breaker OFF OFF i.
- i. Remove jumper Remove jumper j.
- j. Close cubicle door Close cubicle door k.
- k. Check valve position by local Check valve position by local k.
- k. IF IF unable to electrically unable to electrically inspection if possible inspection if possible close valve, close valve, THEN THEN locally close at locally close at Shift Manager's Shift Manager's discretion.
discretion.
l.
- l. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect
-END-
-END-Page 16 of 27 Page 16 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT D (PG 1 OF 5)
ATTACHMENT D (PG 1 OF 5)
COMPONENT COOLING PUMP LOCAL START COMPONENT COOLING PUMP LOCAL START
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
EITHER of the following will disable EITHER of the following will disable
the protective trips on the CC the protective trips on the CC
pumps:
pumps:
oo Loss of DC control power Loss of DC control power
oo Control power fuses removed Control power fuses removed
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CAUTION CAUTION
For the U-0 CC pump to trip on low For the U-0 CC pump to trip on low
surge tank level, the control power surge tank level, the control power
fuses must be installed in EITHER fuses must be installed in EITHER
the 1A CC pump breaker if the U-0 the 1A CC pump breaker if the U-0
pump is racked into Bus 141 pump is racked into Bus 141 OR OR in in
the 1B CC pump breaker if the U-0 the 1B CC pump breaker if the U-0
pump is racked into Bus 142.
pump is racked into Bus 142.
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º NOTE NOTE The U-0 CC pump has a bus breaker The U-0 CC pump has a bus breaker and a local breaker in series. The and a local breaker in series. The local breaker is interlocked to local breaker is interlocked to close when the bus breaker closes.
close when the bus breaker closes.
111 CC PUMP LOCAL EMERGENCY START CC PUMP LOCAL EMERGENCY START CC PUMP LOCAL EMERGENCY START:::
a.
- a. Check selected pump Check selected pump a.
- a. Perform the following:
Perform the following:
breaker(s) -
breaker(s) - RACKED IN RACKED IN::
1)
- 1) Pull the trip and close Pull the trip and close oo CC pump 1A (Bus 141 Cub 12)
CC pump 1A (Bus 141 Cub 12) circuit fuses.
circuit fuses.
oo CC pump 1B (Bus 142 Cub 9)
CC pump 1B (Bus 142 Cub 9) 2)
- 2) Rack the breaker(s) in.
Rack the breaker(s) in.
oo CC pump 0:
CC pump 0:
3)
- 3) Verify floor trip Verify floor trip mechanism reset.
mechanism reset.
Bus 141 Cub 18 Bus 141 Cub 18
-AND-
-AND-
Local Breaker for Bus 141 Local Breaker for Bus 141 (383' N-17)
(383' N-17)
Step continued on next page Step continued on next page Page 17 of 27 Page 17 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT D (PG 2 OF 5)
ATTACHMENT D (PG 2 OF 5)
COMPONENT COOLING PUMP LOCAL START COMPONENT COOLING PUMP LOCAL START Step 1a (continued)
Step 1a (continued) oo CC pump 0:
CC pump 0:
Bus 142 Cub 12 Bus 142 Cub 12
-AND-
-AND-
Local Breaker for Bus 142 Local Breaker for Bus 142 (383' N-17)
(383' N-17) b.
- b. Check relay targets -
Check relay targets - NOT UP NOT UP b.
- b. IF IF redundant equipment is redundant equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO Step 1a Step 1a (Previous Page).
(Previous Page).
IF IF NO CC pumps are NO CC pumps are available, available, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
c.
- c. Verify the following for Verify the following for EACH EACH breaker to be closed:
breaker to be closed:
1)
- 1) Trip and close circuit Trip and close circuit 1)
- 1) Install the fuses.
Install the fuses.
fuses -
fuses - INSTALLED INSTALLED 2)
- 2) Closing spring -
Closing spring - CHARGED CHARGED 2)
- 2) Charge spring with the Charge spring with the charging lever.
charging lever.
d.
- d. Verify MCR control switch in -
Verify MCR control switch in -
AFTER TRIP AFTER TRIP e.
- e. Close breaker with close reach Close breaker with close reach rod:
rod:
oo CC pump 1A (Bus 141 Cub 12)
CC pump 1A (Bus 141 Cub 12) oo CC pump 1B (Bus 142 Cub 9)
CC pump 1B (Bus 142 Cub 9) oo CC pump 0 (Bus 141 Cub 18)
CC pump 0 (Bus 141 Cub 18) oo CC pump 0 (Bus 142 Cub 12)
CC pump 0 (Bus 142 Cub 12)
Step continued on next page Step continued on next page Page 18 of 27 Page 18 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT D (PG 3 OF 5)
ATTACHMENT D (PG 3 OF 5)
COMPONENT COOLING PUMP LOCAL START COMPONENT COOLING PUMP LOCAL START Step 1 (continued)
Step 1 (continued) f.
- f. Verify pump -
Verify pump - RUNNING RUNNING::
f.
Breaker(s) indicate - CLOSED CLOSED THEN THEN close its associated close its associated breaker (383' N-17) with breaker (383' N-17) with oo Ammeter at MCB indicates -
Ammeter at MCB indicates -
the close reach rod.
the close reach rod.
RUN CURRENT RUN CURRENT IF IF the selected pump did the selected pump did oo Local observation Local observation NOT NOT start, start, THEN THEN RETURN TO RETURN TO RETURN TO Step 1a Step 1a (Page 17) to start an (Page 17) to start an alternate pump.
alternate pump.
IF IF ALL available CC pumps ALL available CC pumps fail to start, fail to start, THEN THEN GO TO GO TO GO TO Step 2 (Next Step 2 (Next Page).
Page).
g.
- g. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect.
in effect.
Page 19 of 27 Page 19 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT D (PG 4 OF 5)
ATTACHMENT D (PG 4 OF 5)
COMPONENT COOLING PUMP LOCAL START COMPONENT COOLING PUMP LOCAL START 222 START OF A CC PUMP WITHOUT START OF A CC PUMP WITHOUT START OF A CC PUMP WITHOUT CONTROL POWER CONTROL POWER CONTROL POWER:::
a.
- a. Select a CC pump for start Select a CC pump for start without control power without control power b.
- b. Check relay targets -
Check relay targets - NOT UP NOT UP b.
- b. IF IF redundant equipment is redundant equipment is available, available, THEN THEN RETURN TO RETURN TO RETURN TO Step 2a.
Step 2a.
IF IF NO CC pumps are NO CC pumps are available, available, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
c.
- c. Pull trip and close circuit Pull trip and close circuit fuses fuses d.
- d. Check closing spring -
Check closing spring - CHARGED CHARGED d.
- d. Charge spring with the Charge spring with the charging lever.
charging lever.
Step continued on next page Step continued on next page Page 20 of 27 Page 20 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT D (PG 5 OF 5)
ATTACHMENT D (PG 5 OF 5)
COMPONENT COOLING PUMP LOCAL START COMPONENT COOLING PUMP LOCAL START Step 2 (continued)
Step 2 (continued) e.
- e. Close breaker(s) with close Close breaker(s) with close reach rod:
reach rod:
oo CC pump 1A (Bus 141 Cub 12)
CC pump 1A (Bus 141 Cub 12) oo CC pump 1B (Bus 142 Cub 9)
CC pump 1B (Bus 142 Cub 9) oo CC pump 0:
CC pump 0:
Bus 141 Cub 18 Bus 141 Cub 18
-AND-
-AND-
Local Breaker for Bus 141 Local Breaker for Bus 141 (383' N-17)
(383' N-17) oo CC pump 0:
CC pump 0:
Bus 142 Cub 12 Bus 142 Cub 12
-AND-
-AND-
Local Breaker for Bus 142 Local Breaker for Bus 142 (383' N-17)
(383' N-17) f.
- f. Verify pump -
Verify pump - RUNNING RUNNING::
f.
- f. IF IF redundant equipment is redundant equipment is available, available, oo Breaker(s) indicate -
Breaker(s) indicate - CLOSED CLOSED THEN THEN RETURN TO RETURN TO RETURN TO Step 2a Step 2a (Previous Page).
(Previous Page).
oo Ammeter at MCB indicates -
Ammeter at MCB indicates -
RUN CURRENT RUN CURRENT IF IF NO CC pumps are NO CC pumps are available, available, oo Local observation Local observation THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
g.
- g. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect.
in effect.
-END-
-END-Page 21 of 27 Page 21 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 1 OF 6)
ATTACHMENT E (PG 1 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION 111 ENERGIZE DESIRED MCC(S)
ENERGIZE DESIRED MCC(S)
ENERGIZE DESIRED MCC(S):::
oo Train A SI accumulator Train A SI accumulator discharge valves (MCC 131X2A) -
discharge valves (MCC 131X2A) -
GO TO GO TO GO TO STEP 2 (Next Page)
STEP 2 (Next Page) oo Train B SI accumulator Train B SI accumulator discharge valves (MCC 132X2A) -
discharge valves (MCC 132X2A) -
GO TO GO TO GO TO STEP 3 (Page 24)
STEP 3 (Page 24) oo Train A SVAG VALVES Train A SVAG VALVES (MCC 131X1A) -
(MCC 131X1A) -
GO TO GO TO GO TO STEP 4 (Page 25)
STEP 4 (Page 25) oo Train B SVAG VALVES Train B SVAG VALVES (MCC 132X4A) -
(MCC 132X4A) -
GO TO GO TO GO TO STEP 5 (Page 26)
STEP 5 (Page 26)
Page 22 of 27 Page 22 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 2 OF 6)
ATTACHMENT E (PG 2 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION 222 TRAIN A (1SI8808A AND D)
TRAIN A (1SI8808A AND D)
TRAIN A (1SI8808A AND D):::
a.
(414' S12 CWA):
1)
- 1) Turn MCC 131X2 B2 -
Turn MCC 131X2 B2 - OFF OFF 2)
- 2) Open cubicle door Open cubicle door 3)
- 3) Install jumper between point Install jumper between point 1 and 3A on terminal board at 1 and 3A on terminal board at front of cubicle front of cubicle 4)
- 4) Override breaker and door Override breaker and door interlock interlock 5)
- 5) Turn breaker MCC 131X2 B2 -
Turn breaker MCC 131X2 B2 -
ON ON 6)
- 6) Check MCC 131X2A -
Check MCC 131X2A - ENERGIZED ENERGIZED b.
- b. Locally close SI accumulator Locally close SI accumulator b.
- b. Locally close valve(s):
Locally close valve(s):
discharge valves per 1BwOA discharge valves per 1BwOA ELEC-5, LOCAL EMERGENCY CONTROL ELEC-5, LOCAL EMERGENCY CONTROL oo 1SI8808A (412' R15 OMB) 1SI8808A (412' R15 OMB)
OF SAFE SHUTDOWN EQUIPMENT OF SAFE SHUTDOWN EQUIPMENT oo 1SI8808D (412' R9 OMB) 1SI8808D (412' R9 OMB)
MCC 131X2A A3 (1SI8808A)
MCC 131X2A A3 (1SI8808A)
(414' S12 CWA)
(414' S12 CWA)
MCC 131X2A A2 (1SI8808D)
MCC 131X2A A2 (1SI8808D)
(414' S12 CWA)
(414' S12 CWA) c.
(414' S12 CWA):
1)
- 1) Turn MCC 131X2 B2 -
Turn MCC 131X2 B2 - OFF OFF 2)
- 2) Remove jumper Remove jumper 3)
- 3) Close cubicle door Close cubicle door 4)
- 4) Turn MCC 131X2 B2 -
Turn MCC 131X2 B2 - ON ON Page 23 of 27 Page 23 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 3 OF 6)
ATTACHMENT E (PG 3 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION 333 TRAIN B (1SI8808B AND C)
TRAIN B (1SI8808B AND C)
TRAIN B (1SI8808B AND C):::
a.
(426' S12 CWA):
1)
- 1) Turn MCC 132X2 B2 -
Turn MCC 132X2 B2 - OFF OFF 2)
- 2) Open cubicle door Open cubicle door 3)
- 3) Install jumper between point Install jumper between point 1 and 3A on terminal board at 1 and 3A on terminal board at front of cubicle front of cubicle 4)
- 4) Override breaker and door Override breaker and door interlock interlock 5)
- 5) Turn breaker MCC 132X2 B2 -
Turn breaker MCC 132X2 B2 -
ON ON 6)
- 6) Check MCC 132X2A -
Check MCC 132X2A - ENERGIZED ENERGIZED b.
- b. Locally close SI accumulator Locally close SI accumulator b.
- b. Locally close valve(s):
Locally close valve(s):
discharge valves per 1BwOA discharge valves per 1BwOA ELEC-5, LOCAL EMERGENCY CONTROL ELEC-5, LOCAL EMERGENCY CONTROL oo 1SI8808B (412' R18 OMB) 1SI8808B (412' R18 OMB)
OF SAFE SHUTDOWN EQUIPMENT OF SAFE SHUTDOWN EQUIPMENT oo 1SI8808C (412' R5 OMB) 1SI8808C (412' R5 OMB)
MCC 132X2A A3 (1SI8808B)
MCC 132X2A A3 (1SI8808B)
(426' S12 CWA)
(426' S12 CWA)
MCC 132X2A A2 (1SI8808C)
MCC 132X2A A2 (1SI8808C)
(426' S12 CWA)
(426' S12 CWA) c.
(426' S12 CWA):
1)
- 1) Turn MCC 132X2 B2 -
Turn MCC 132X2 B2 - OFF OFF 2)
- 2) Remove jumper Remove jumper 3)
- 3) Close cubicle door Close cubicle door 4)
- 4) Turn MCC 132X2 B2 -
Turn MCC 132X2 B2 - ON ON Page 24 of 27 Page 24 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 4 OF 6)
ATTACHMENT E (PG 4 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION 444 TRAIN A SVAG VALVES TRAIN A SVAG VALVES TRAIN A SVAG VALVES:::
a.
(364' S12 CWA):
1)
- 1) Turn MCC 131X1 M2 -
Turn MCC 131X1 M2 - OFF OFF 2)
- 2) Open cubicle door Open cubicle door 3)
- 3) Lift lead from Point 14 on Lift lead from Point 14 on terminal strip at front of terminal strip at front of cubicle to defeat shorting cubicle to defeat shorting circuit circuit 4)
- 4) Tape end of lead.
Tape end of lead.
5)
- 5) Notify the control room to Notify the control room to log lifted lead in TCC log log lifted lead in TCC log 6)
- 6) Install jumper between points Install jumper between points 1 and 3 on control relay in 1 and 3 on control relay in front of cubicle front of cubicle 7)
- 7) Override breaker and door Override breaker and door interlock interlock 8)
- 8) Turn breaker MCC 131X1 M2 -
Turn breaker MCC 131X1 M2 -
ON ON 9)
- 9) Check MCC 131X1A -
Check MCC 131X1A - ENERGIZED ENERGIZED b.
- b. Align valve(s) as required:
Align valve(s) as required:
oo Control switch Control switch oo 1BwOA ELEC-5, LOCAL EMERGENCY 1BwOA ELEC-5, LOCAL EMERGENCY CONTROL OF SAFE SHUTDOWN CONTROL OF SAFE SHUTDOWN EQUIPMENT EQUIPMENT c.
(364' S12 CWA):
1)
- 1) Turn MCC 131X1 M2 -
Turn MCC 131X1 M2 - OFF OFF 2)
- 2) Remove jumper Remove jumper 3)
- 3) Untape and land lead from Untape and land lead from Point 14 on terminal strip at Point 14 on terminal strip at front of cubicle front of cubicle 4)
- 5) Close cubicle door Close cubicle door 6)
- 6) Turn MCC 131X1 M2 -
Turn MCC 131X1 M2 - ON ON Page 25 of 27 Page 25 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 5 OF 6)
ATTACHMENT E (PG 5 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION 555 TRAIN B SVAG VALVES TRAIN B SVAG VALVES TRAIN B SVAG VALVES:::
a.
(426' S12 CWA):
1)
- 1) Turn MCC 132X4 K2 -
Turn MCC 132X4 K2 - OFF OFF 2)
- 2) Open cubicle door Open cubicle door 3)
- 3) Lift lead from Point 14 on Lift lead from Point 14 on terminal strip at front of terminal strip at front of cubicle to defeat shorting cubicle to defeat shorting circuit circuit 4)
- 4) Tape end of lead.
Tape end of lead.
5)
- 5) Notify the control room to Notify the control room to log lifted lead in TCC log log lifted lead in TCC log 6)
- 6) Install jumper between points Install jumper between points 1 and 3 on control relay in 1 and 3 on control relay in front of cubicle front of cubicle 7)
- 7) Override breaker and door Override breaker and door interlock interlock 8)
- 8) Turn breaker MCC 132X4 K2 -
Turn breaker MCC 132X4 K2 -
ON ON 9)
- 9) Check MCC 132X4A -
Check MCC 132X4A - ENERGIZED ENERGIZED b.
- b. Align valve(s) as required:
Align valve(s) as required:
oo Control switch Control switch oo 1BwOA ELEC-5, LOCAL EMERGENCY 1BwOA ELEC-5, LOCAL EMERGENCY CONTROL OF SAFE SHUTDOWN CONTROL OF SAFE SHUTDOWN EQUIPMENT EQUIPMENT Step continued on next page Step continued on next page Page 26 of 27 Page 26 of 27
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE LOCAL EMERGENCY CONTROL OF SAFE REV. 105 REV. 105 REV. 105 1BwOA 1BwOA 1BwOA SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT SHUTDOWN EQUIPMENT ELEC-5 ELEC-5 ELEC-5 UNIT 1 UNIT 1 UNIT 1 ATTACHMENT E (PG 6 OF 6)
ATTACHMENT E (PG 6 OF 6)
SVAG VALVE MCC ENERGIZATION SVAG VALVE MCC ENERGIZATION Step 5 (continued)
Step 5 (continued) c.
(426' S12 CWA):
1)
- 1) Turn MCC 132X4 K2 -
Turn MCC 132X4 K2 - OFF OFF 2)
- 2) Remove jumper Remove jumper 3)
- 3) Untape and land lead from Untape and land lead from Point 14 on terminal strip at Point 14 on terminal strip at front of cubicle front of cubicle 4)
- 5) Close cubicle door Close cubicle door 6)
- 6) Turn MCC 132X4 K2 -
Turn MCC 132X4 K2 - ON ON
-END-
-END-Page 27 of 27 Page 27 of 27
GRAPHIC FOR EXAMINER: DO NOT SHOW TO EXAMINEE Interlock bar must be pushed perpendicular into the picture to override interlock and allow closing breaker with door open.
O Contactor. Posts.
IP-406S Page 1 of 4 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are an extra NSO.
- 2.
A loss of Essential Service Water is in progress on Unit 2.
- 3.
2A CV pump is not running.
INITIATING CUES:
- 1.
The Unit Supervisor has directed you to align Fire Protection Cooling ONLY to the 2A Centrifugal Charging Pump per 2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, Attachment C.
- 2.
2A CV pump will remain in standby.
- 3.
Inform the Unit Supervisor when you have aligned Fire Protection Cooling to the 2A Centrifugal Charging Pump.
IP-406S Page 2 of 4 TASK TITLE: Align Fire Protection Cooling to the 2A Centrifugal Charging Pump JPM No.:
IP-406S REV:
2013 NRC Task No.:
R-CV-23 K&A No.:
K2.1.30 Objective No.: 4.D.OA-69 K&A IMP:
4.4/4.0 EXAMINEE:
EVALUATOR:
DATE:
The Examinee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 2, 3 APPROX COMPLETION TIME: 15 MINUTES CRITICAL TIME:
NA EVALUATION METHOD:
LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1.
2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, Rev 105.
MATERIALS:
- 2.
2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, Rev 105.
TASK STANDARDS:
- 1.
Connect FP hose between FP system and SX system.
- 2.
Align FR system to 2A CV pump oil cooler.
TASK CONDITIONS:
- 1.
You are an extra NSO.
- 2.
A loss of Essential Service Water is in progress on Unit 2.
- 3.
2A CV pump is not running.
INITIATING CUES:
- 1.
The Unit 2 Unit Supervisor has directed you to align Fire Protection Cooling ONLY to the 2A Centrifugal Charging Pump per 2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, Attachment C.
- 2.
2A CV pump will remain in standby.
- 3.
Inform the Unit 2 Unit Supervisor when you have aligned Fire Protection Cooling to the 2A Centrifugal Charging Pump.
IP-406S Page 3 of 4 RECORD START TIME:
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 1.
Refer to 2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION.
CUE:
After examinee locates procedure, provide copy of 2BwOA PRI-8, Attachment C.
Locate and open 2BwOA PRI-8, ESSENTIAL SERVICE WATER MALFUNCTION, Attachment C.
- Determine 2A CV pump selected for FP alignment (from initial cue).
SAT UNSAT N/A Comments:
- 2.
Connect and align fire hose.
CUE:
FP Supply Hose Connected CUE:
0FP840 is rotated counter clockwise until the valve handwheel stops.
CUE:
Hose is not pinched by room door. No kinks in hose Connect and align fire hose
- Locate fire hose in 2A CV pump room.
- Connect one end of fire hose to CV pump 2A lube oil cooler.
- Connect opposite end of fire hose to FP connection outside 2A CV Pump room (364 V18).
- Determine FP hose NOT required to be connected to 1A CV pump (from initiating cue, only 2A CV pump to be aligned to FP cooling).
- Open 0FP840, 1A/2A CV pump oil cooler alternate cooling water supply tie valve (364 V18)
- Verify fire hose charged Hose not pinched by room door.
No kinks in hose.
SAT UNSAT N/A Comments:
IP-406S Page 4 of 4 PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 3.
Align FP cooling to oil cooler CUE:
2SX259A is rotated counter clockwise until the valve handwheel stops.
CUE:
2SX258A is rotated clockwise until the valve handwheel stops.
Align FP to CHG PUMP Lube Oil Cooler:
- Open 2SX259A, 2A CV pump FP supply to oil cooler isolation valve (364 U20 in 2A CV ump room).
- Close 2SX258A, 2A CV pump gear and oil cooler isolation valve (364 U20 in 2A CV ump room).
SAT UNSAT N/A Comments:
- 4.
Check Centrifugal Charging Pump 2A Operation:
CUE:
2A CV Pump is not running.
Check Centrifugal Charging Pump 2A Operation:
- 2A CV pump is not running (from initiating cue)
- Determine 2A CV pump is being aligned for standby operation (from initiating cue)
SAT UNSAT N/A Comments:
- 5.
Check if FP alignment required for 2B CV pump:
CUE:
As Unit Supervisor, acknowledge report.
NOTE: The alignment does render the 2A CV pump inoperable, even though the pump will function.
Check if FP alignment required for 2B CV pump:
Determine 2A CV pump selected for FP alignment (from initial cue).
Return to procedure and step in effect.
Inform US FP aligned to 2A CV pump.
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
(Final)
REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 A.
A.
PURPOSE PURPOSE This procedure provides actions required in the event of a This procedure provides actions required in the event of a malfunction of the Essential Service Water system.
malfunction of the Essential Service Water system.
B.
B.
SYMPTOMS OR ENTRY CONDITIONS SYMPTOMS OR ENTRY CONDITIONS 1) 1)
The following annunciators may cause entry into this procedure:
The following annunciators may cause entry into this procedure:
oo CNMT DRAIN LEAK DETECT FLOW HIGH (2-1-A2)
CNMT DRAIN LEAK DETECT FLOW HIGH (2-1-A2) oo SX PUMP TRIP (2-2-A1)
SX PUMP TRIP (2-2-A1) oo SX PUMP DSCH HDR PRESS LOW (2-2-A2)
SX PUMP DSCH HDR PRESS LOW (2-2-A2) oo SX PUMP DSCH HDR TEMP HIGH/LOW (2-2-B2)
SX PUMP DSCH HDR TEMP HIGH/LOW (2-2-B2) oo SX PUMP SUCT PRESS LOW (2-2-C1)
SX PUMP SUCT PRESS LOW (2-2-C1) oo SX STRN DP HIGH (2-2-C2)
SX STRN DP HIGH (2-2-C2) oo SX PUMP SUCT VLV PIT LEVEL HIGH (2-2-D2)
SX PUMP SUCT VLV PIT LEVEL HIGH (2-2-D2)
Page 1 of 29 Page 1 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 NOTE NOTE With this procedure in effect, the With this procedure in effect, the Emergency Director shall evaluate Emergency Director shall evaluate for Emergency Plan conditions.
for Emergency Plan conditions.
111 CHECK FOR EXCESSIVE LEAKAGE IN CHECK FOR EXCESSIVE LEAKAGE IN CHECK FOR EXCESSIVE LEAKAGE IN GO TO GO TO GO TO ATTACHMENT A, Step 1 ATTACHMENT A, Step 1 AUX BUILDING AUX BUILDING AUX BUILDING:::
(Page 15).
(Page 15).
Contact Radwaste to monitor aux Contact Radwaste to monitor aux building sumps:
building sumps:
Aux Bldg sumps -
Aux Bldg sumps - NORMAL NORMAL
SX PUMP SUCT VLV PIT LEVEL HIGH SX PUMP SUCT VLV PIT LEVEL HIGH (2-2-D2) -
(2-2-D2) - NOT LIT NOT LIT 222 CHECK STATUS OF SX PUMPS CHECK STATUS OF SX PUMPS CHECK STATUS OF SX PUMPS:::
a.
- a. SX pumps -
SX pumps - AT LEAST ONE RUNNING AT LEAST ONE RUNNING a.
- a. Perform the following for Perform the following for the SX train to be the SX train to be started:
started:
1)
- 1) Verify the following Verify the following valves open:
valves open:
oo Train A Train A
2SX001A 2SX001A
2SX016A 2SX016A
2SX027A 2SX027A
-OR-
-OR-oo Train B Train B
2SX001B 2SX001B
2SX016B 2SX016B
2SX027B 2SX027B 2)
pump.
IF IF NO NO UNIT 2 SX pump(s)
UNIT 2 SX pump(s) can be started, can be started, THEN THEN GO TO GO TO GO TO
- ATTACHMENT B
- ATTACHMENT B (Page 18).
(Page 18).
Page 2 of 29 Page 2 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 333 CHECK STATUS OF SX SYSTEM CHECK STATUS OF SX SYSTEM CHECK STATUS OF SX SYSTEM:::
a.
- a. Perform the following:
Perform the following:
(2-2-C1) -
(2-2-C1) - NOT LIT NOT LIT 1)
- 1) Verify SX pump(s)
Verify SX pump(s) suction valves are open:
suction valves are open:
2SX001A 2SX001A
2SX001B 2SX001B 2)
- 2) Dispatch an operator to Dispatch an operator to verify traveling screens verify traveling screens clear of icing/debris.
clear of icing/debris.
b.
- b. SX STRN DP HIGH (2-2-C2) -
SX STRN DP HIGH (2-2-C2) - NOT NOT b.
- b. Locally backwash Locally backwash LIT LIT strainer(s) per BwOP SX-6, strainer(s) per BwOP SX-6, ESSENTIAL SERVICE WATER ESSENTIAL SERVICE WATER STRAINER MANUAL OPERATION STRAINER MANUAL OPERATION c.
- c. Perform the following:
Perform the following:
(2-2-A2) -
(2-2-A2) - NOT LIT NOT LIT oo Start an additional SX Start an additional SX pump.
pump.
oo Locally verify the SX Locally verify the SX pump discharge strainers pump discharge strainers are are NOT NOT backwashing.
backwashing.
Step continued on next page Step continued on next page Page 3 of 29 Page 3 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 3 (continued)
Step 3 (continued) oo Locally adjust SX outlet Locally adjust SX outlet from CC heat exchanger from CC heat exchanger valve(s) while valve(s) while maintaining outlet maintaining outlet temperature(s) less than temperature(s) less than 105 105FF::
oo 2SX007 (346' M20):
2SX007 (346' M20):
1)
- 1) Close 2SX007E, Close 2SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 2SX007 as Throttle 2SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 2SX007E, open 2SX007E,
Local Disc Sw.
Local Disc Sw.
oo 0SX007 (346' M16):
0SX007 (346' M16):
1)
- 1) Close 0SX007E, Close 0SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 0SX007 as Throttle 0SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 0SX007E open 0SX007E
Local Disc Sw.
Local Disc Sw.
Step continued on next page Step continued on next page Page 4 of 29 Page 4 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 3 (continued)
Step 3 (continued)
IF IF SX pump discharge SX pump discharge header pressure can header pressure can NOT NOT be be
- restored, restored, THEN THEN perform the perform the following:
following:
a) a) Monitor temperatures of Monitor temperatures of equipment cooled by SX.
equipment cooled by SX.
b) b) Shutdown Shutdown ANY ANY unnecessary unnecessary equipment:
equipment:
oo DG(s)
RCFC(s) oo Containment Containment chiller(s) chiller(s) c)
c) Close the SX outlet Close the SX outlet valve for valve for ANY ANY shutdown shutdown RCFC train(s):
RCFC train(s):
oo 2SX027A 2SX027A oo 2SX027B 2SX027B d) d) IF IF CENT CHG pump CENT CHG pump temperatures are temperatures are approaching the limits approaching the limits of TABLE A (Page 29),
of TABLE A (Page 29),
THEN THEN align FP to a CENT align FP to a CENT CHG pump lube oil cooler CHG pump lube oil cooler per ATTACHMENT C per ATTACHMENT C (Page 23) while (Page 23) while continuing with this continuing with this procedure:
procedure:
oo CENT CHG pump 2A CENT CHG pump 2A oo CENT CHG pump 2B CENT CHG pump 2B e) e) Shutdown Shutdown ANY ANY vital vital equipment exceeding the equipment exceeding the limits of TABLE A limits of TABLE A (Page 29).
(Page 29).
Step continued on next page Step continued on next page Page 5 of 29 Page 5 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 3 (continued)
Step 3 (continued) f)
f) At Shift Manager At Shift Manager discretion align discretion align UNIT 1 UNIT 1 UNIT 1 SX to cool Unit 2 CC SX to cool Unit 2 CC loads via the Unit 0 CC loads via the Unit 0 CC heat exchanger:
heat exchanger:
1)
valve:
1SX005 1SX005 2)
outlet valve(s):
oo 0SX146 0SX146 oo 0SX147 0SX147 3)
- 3) Align the UNIT 0 CC Align the UNIT 0 CC heat exchanger to heat exchanger to Unit 2 per BwOP CC-8, Unit 2 per BwOP CC-8, ISOLATION OF CC ISOLATION OF CC BETWEEN UNITS 1 AND BETWEEN UNITS 1 AND 2.
2.
Step continued on next page Step continued on next page Page 6 of 29 Page 6 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 3 (continued)
Step 3 (continued) d.
- d. Perform the following:
Perform the following:
(2-2-B2) -
(2-2-B2) - NOT LIT NOT LIT 1)
- 1) Start an additional SX Start an additional SX pump at Shift Manager pump at Shift Manager discretion.
discretion.
2)
- 2) Monitor temperatures of Monitor temperatures of running equipment cooled running equipment cooled by SX.
by SX.
3)
- 3) Shutdown Shutdown ANY ANY unnecessary unnecessary equipment:
equipment:
oo DG(s)
RCFC(s) oo Containment Containment chiller(s) chiller(s) 4)
- 4) Close the SX outlet Close the SX outlet valve for valve for ANY ANY shutdown shutdown RCFC train(s):
RCFC train(s):
oo 2SX027A 2SX027A oo 2SX027B 2SX027B 5)
- 5) IF IF CENT CHG pump CENT CHG pump temperatures are temperatures are approaching the limits approaching the limits of TABLE A (Page 29),
of TABLE A (Page 29),
THEN THEN align FP to a CENT align FP to a CENT CHG pump lube oil cooler CHG pump lube oil cooler per ATTACHMENT C per ATTACHMENT C (Page 23) while (Page 23) while continuing with this continuing with this procedure:
procedure:
oo CENT CHG pump 2A CENT CHG pump 2A oo CENT CHG pump 2B CENT CHG pump 2B 6)
- 6) Shutdown Shutdown ANY ANY vital vital equipment exceeding the equipment exceeding the limits of TABLE A limits of TABLE A (Page 29).
(Page 29).
Step continued on next page Step continued on next page Page 7 of 29 Page 7 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 3 (continued)
Step 3 (continued) 7)
- 7) At Shift Manager At Shift Manager discretion align discretion align UNIT 1 UNIT 1 UNIT 1 SX to cool Unit 2 CC SX to cool Unit 2 CC loads via the Unit 0 CC loads via the Unit 0 CC heat exchanger:
heat exchanger:
a) a) Open the CC HX 0 SX Open the CC HX 0 SX inlet valve:
inlet valve:
1SX005 1SX005 b) b) Open CC HX 0 SX Open CC HX 0 SX outlet valve(s):
outlet valve(s):
oo 0SX146 0SX146 oo 0SX147 0SX147 c) c) Align the UNIT 0 CC Align the UNIT 0 CC heat exchanger to heat exchanger to Unit 2 per BwOP CC-8, Unit 2 per BwOP CC-8, ISOLATION OF CC ISOLATION OF CC BETWEEN UNITS 1 AND BETWEEN UNITS 1 AND 2.
2.
e.
- e. Perform the following:
Perform the following:
pump(s) -
pump(s) - NOT ROTATING NOT ROTATING 1)
- 1) Dispatch an operator to Dispatch an operator to energize the affected energize the affected pump's suction valve:
pump's suction valve:
oo 2SX001A at MCC 231X3 2SX001A at MCC 231X3 E4 (401' M20)
E4 (401' M20) oo 2SX001B at MCC 232X1 2SX001B at MCC 232X1 C1 (383' M23)
C1 (383' M23) 2)
- 2) Close affected pump's Close affected pump's suction valve:
suction valve:
oo 2SX001A 2SX001A oo 2SX001B 2SX001B Page 8 of 29 Page 8 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 444 CHECK FOR SX LEAKAGE INTO CHECK FOR SX LEAKAGE INTO CHECK FOR SX LEAKAGE INTO Perform the following:
Perform the following:
CONTAINMENT CONTAINMENT CONTAINMENT:::
a.
CNMT DRAIN LEAK DETECT FLOW CNMT DRAIN LEAK DETECT FLOW running.
running.
HIGH (2-1-A2) -
HIGH (2-1-A2) - NOT LIT NOT LIT b.
non-running SX pump:
1)
- 1) Stop associated RCFCs:
Stop associated RCFCs:
oo SX pump 2A:
SX pump 2A:
RCFC 2C RCFC 2C oo SX pump 2B:
SX pump 2B:
inlet valve:
oo 2SX016A (SX pump 2A) 2SX016A (SX pump 2A) oo 2SX016B (SX pump 2B) 2SX016B (SX pump 2B) 3)
outlet valve:
oo 2SX027A (SX pump 2A) 2SX027A (SX pump 2A) oo 2SX027B (SX pump 2B) 2SX027B (SX pump 2B)
Step continued on next page Step continued on next page Page 9 of 29 Page 9 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 4 (continued)
Step 4 (continued) c.
- c. Determine if leakage Determine if leakage stopped:
stopped:
oo Monitor SX pump Monitor SX pump parameters:
parameters:
Pump discharge Pump discharge pressure pressure
Pump amps Pump amps oo Monitor containment Monitor containment water level:
water level:
Floor drain sump Floor drain sump level:
level:
2LI-PC002 2LI-PC002
2LI-PC003 2LI-PC003
Floor water level:
Floor water level:
2LI-PC006 2LI-PC006
2LI-PC007 2LI-PC007 d.
- d. IF IF leakage is stopped, leakage is stopped, THEN THEN perform the perform the following:
following:
1)
online:
oo 2PR02J 2PR02J oo 2PR03J 2PR03J 2)
- 2) GO TO GO TO GO TO Step 5 (Page 12).
Step 5 (Page 12).
Step continued on next page Step continued on next page Page 10 of 29 Page 10 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 Step 4 (continued)
Step 4 (continued) e.
- e. IF IF leakage still exists, leakage still exists, THEN THEN perform the following perform the following to swap running RCFC to swap running RCFC trains:
trains:
1)
for non-running SX pump:
oo 2SX016A (SX pump 2A) 2SX016A (SX pump 2A) oo 2SX016B (SX pump 2B) 2SX016B (SX pump 2B) 2)
pump:
oo 2SX027A (SX pump 2A) 2SX027A (SX pump 2A) oo 2SX027B (SX pump 2B) 2SX027B (SX pump 2B) 3)
- 3) Swap running SX pumps.
Swap running SX pumps.
4)
- 4) Start non-running RCFCs.
Start non-running RCFCs.
5)
- 5) RETURN TO RETURN TO RETURN TO Substep 4b Substep 4b RNO above.
RNO above.
Page 11 of 29 Page 11 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 555 CHECK CC OUTLET TEMPERATURE CHECK CC OUTLET TEMPERATURE CHECK CC OUTLET TEMPERATURE:::
a.
- a. Perform the following:
Perform the following:
temperature(s) -
temperature(s) - LESS THAN LESS THAN 105 105FF::
1)
(2TI-674)
(2TI-674) exchanger valve(s) to exchanger valve(s) to
(2TI-675)
(2TI-675) maintain CC maintain CC temperature(s) less than temperature(s) less than 105 105FF::
oo 2SX007 (346' M20):
2SX007 (346' M20):
1)
- 1) Close 2SX007E, Close 2SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 2SX007 as Throttle 2SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 2SX007E, open 2SX007E,
Local Disc Sw.
Local Disc Sw.
oo 0SX007 (346' M16):
0SX007 (346' M16):
1)
- 1) Close 0SX007E, Close 0SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 0SX007 as Throttle 0SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 0SX007E open 0SX007E
Local Disc Sw.
Local Disc Sw.
2)
WTR TEMP HIGH (2-7-E3) is LIT, is LIT, THEN THEN maintain seal maintain seal injection flow between injection flow between 8 GPM 8 GPM and and 13 GPM 13 GPM per per pump.
pump.
Page 12 of 29 Page 12 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 666 CHECK RCP COOLING CHECK RCP COOLING CHECK RCP COOLING:::
a.
- a. Check the following alarms -
Check the following alarms -
a.
- a. Monitor RCP temperatures.
Monitor RCP temperatures.
NOT LIT NOT LIT::
IF IF motor bearing motor bearing
RCP THERM BARR CC WTR TEMP RCP THERM BARR CC WTR TEMP temperature exceeds temperature exceeds 195 195FF HIGH (2-7-E3)
HIGH (2-7-E3)
OR OR lower radial bearing lower radial bearing temperature exceeds temperature exceeds 225 225FF
RCP BRNG CC WTR TEMP HIGH RCP BRNG CC WTR TEMP HIGH OR OR seal outlet temperature seal outlet temperature (2-7-E5)
(2-7-E5) exceeds exceeds 235
- 235FF, THEN THEN perform the perform the following:
following:
a) a) Trip the reactor.
Trip the reactor.
b) b) Trip the affected Trip the affected RCP(s).
RCP(s).
c) c) Perform 2BwEP-0, REACTOR Perform 2BwEP-0, REACTOR TRIP OR SAFETY INJECTION TRIP OR SAFETY INJECTION while continuing with while continuing with this procedure.
this procedure.
777 NOTIFY THE SHIFT MANAGER TO NOTIFY THE SHIFT MANAGER TO NOTIFY THE SHIFT MANAGER TO PERFORM THE FOLLOWING PERFORM THE FOLLOWING PERFORM THE FOLLOWING:::
Risk Evaluation Risk Evaluation
Initiate an IR Initiate an IR
Notify the following personnel Notify the following personnel as appropriate:
as appropriate:
oo Station Duty Manager Station Duty Manager oo Station Duty Officer Station Duty Officer oo Nuclear Duty Officer Nuclear Duty Officer oo Work Week Manager Work Week Manager 888 REFER TO TECH SPECS REFER TO TECH SPECS REFER TO TECH SPECS:::
3.6.6 3.6.6
3.7.8 3.7.8
3.7.9 3.7.9
Perform a risk assessment Perform a risk assessment Page 13 of 29 Page 13 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 999 RETURN TO PROCEDURE AND STEP IN RETURN TO PROCEDURE AND STEP IN RETURN TO PROCEDURE AND STEP IN EFFECT EFFECT EFFECT
-END-
-END-Page 14 of 29 Page 14 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT A (PG 1 OF 3)
ATTACHMENT A (PG 1 OF 3)
AUX BUILDING PIPING RUPTURE AUX BUILDING PIPING RUPTURE 111 PERFORM 0BWOA PRI-8, AUXILIARY PERFORM 0BWOA PRI-8, AUXILIARY PERFORM 0BWOA PRI-8, AUXILIARY BUILDING FLOODING, WHILE BUILDING FLOODING, WHILE BUILDING FLOODING, WHILE CONTINUING WITH THIS PROCEDURE CONTINUING WITH THIS PROCEDURE CONTINUING WITH THIS PROCEDURE 222 MONITOR TEMPERATURES ON RUNNING MONITOR TEMPERATURES ON RUNNING MONITOR TEMPERATURES ON RUNNING EQUIPMENT COOLED BY SX EQUIPMENT COOLED BY SX EQUIPMENT COOLED BY SX:::
PPC Trend Page TR104 (BwOA PPC Trend Page TR104 (BwOA PRI-8, SX MALFUNCTION)
PRI-8, SX MALFUNCTION)
CC heat exchanger outlet CC heat exchanger outlet temperature temperature 333 ALIGN FIRE PROTECTION TO CENT CHG ALIGN FIRE PROTECTION TO CENT CHG ALIGN FIRE PROTECTION TO CENT CHG PUMP LUBE OIL COOLERS PUMP LUBE OIL COOLERS PUMP LUBE OIL COOLERS:::
a.
- a. Dispatch an operator to align Dispatch an operator to align FP to CENT CHG pump(s) lube oil FP to CENT CHG pump(s) lube oil cooler per ATTACHMENT C cooler per ATTACHMENT C (Page 23) while continuing with (Page 23) while continuing with this procedure:
this procedure:
oo CENT CHG pump 2A CENT CHG pump 2A oo CENT CHG pump 2B CENT CHG pump 2B 444 PROTECT IMPORTANT EQUIPMENT PROTECT IMPORTANT EQUIPMENT PROTECT IMPORTANT EQUIPMENT:::
a.
- a. Shutdown Shutdown ANY ANY unnecessary unnecessary equipment:
equipment:
oo DG(s)
SI pump(s) oo Containment chiller(s)
Containment chiller(s) b.
- b. Place in PULL OUT Place in PULL OUT ANY ANY vital vital equipment -
equipment - EXCEEDING THE EXCEEDING THE LIMITS OF TABLE A (Page 29)
LIMITS OF TABLE A (Page 29) c.
- c. Dispatch an operator to prepare Dispatch an operator to prepare Startup FW pump for start per Startup FW pump for start per BwOP FW-5, OPERATION OF A BwOP FW-5, OPERATION OF A STARTUP FW PUMP STARTUP FW PUMP Page 15 of 29 Page 15 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT A (PG 2 OF 3)
ATTACHMENT A (PG 2 OF 3)
AUX BUILDING PIPING RUPTURE AUX BUILDING PIPING RUPTURE 555 CHECK IF REACTOR SHUTDOWN CHECK IF REACTOR SHUTDOWN CHECK IF REACTOR SHUTDOWN REQUIRED REQUIRED REQUIRED:::
a.
- a. Field reports indicate flooding Field reports indicate flooding a.
- a. Continue with Step 6 (Next Continue with Step 6 (Next of vital equipment (SX pumps in of vital equipment (SX pumps in Page).
Page).
both rooms, RH pumps, etc.) -
both rooms, RH pumps, etc.) -
IF IF reports indicate reports indicate IMMINENT IMMINENT flooding of vital flooding of vital equipment is imminent, equipment is imminent, THEN THEN do Steps 5b thru 5j.
do Steps 5b thru 5j.
b.
- b. Trip the reactor Trip the reactor c.
- c. Perform 2BwEP-0, REACTOR TRIP Perform 2BwEP-0, REACTOR TRIP OR SAFETY INJECTION while OR SAFETY INJECTION while continuing with this procedure continuing with this procedure d.
- d. Check WS pumps -
Check WS pumps - ANY RUNNING ANY RUNNING d.
- d. Perform the following:
Perform the following:
1)
pump in - PULL OUT PULL OUT::
- 2) Shutdown the following Shutdown the following SX cooled equipment:
SX cooled equipment:
DG(s)
DG(s)
MCR chiller(s)
MCR chiller(s)
SI pump(s)
SI pump(s)
Containment Containment chiller(s) chiller(s) 3)
- 3) Control feed flow from Control feed flow from the diesel driven AF the diesel driven AF pump to maintain narrow pump to maintain narrow range levels -
range levels - BETWEEN BETWEEN 42% AND 50%
42% AND 50%
4)
- 4) GO TO GO TO GO TO Step 6 (Next Step 6 (Next Page).
Page).
e.
- e. Align normal feedwater per Align normal feedwater per 2BwEP ES-0.1, REACTOR TRIP 2BwEP ES-0.1, REACTOR TRIP RESPONSE, ATTACHMENT C RESPONSE, ATTACHMENT C Step continued on next page Step continued on next page Page 16 of 29 Page 16 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT A (PG 3 OF 3)
ATTACHMENT A (PG 3 OF 3)
AUX BUILDING PIPING RUPTURE AUX BUILDING PIPING RUPTURE Step 5 (continued)
Step 5 (continued) f.
- f. Control feed flow to maintain Control feed flow to maintain narrow range levels -
narrow range levels - BETWEEN BETWEEN 42% AND 50%
42% AND 50%
g.
- g. Place motor driven AF pump in -
Place motor driven AF pump in -
PULL OUT PULL OUT::
cooled equipment:
DG(s)
DG(s)
MCR chiller(s)
MCR chiller(s)
SI pump(s)
SI pump(s)
Containment chiller(s)
Containment chiller(s) i.
- i. Check all SG levels -
Check all SG levels - GREATER GREATER i.
- i. Continue with Step 6.
Continue with Step 6.
THAN 42%
THAN 42%
WHEN WHEN all SG levels are all SG levels are greater than greater than 42%
42%,
THEN THEN do Step 5j.
do Step 5j.
j.
in - AFTER TRIP AFTER TRIP::
AF pump 2B AF pump 2B 666 CHECK STATUS OF PIPE LEAK CHECK STATUS OF PIPE LEAK CHECK STATUS OF PIPE LEAK:::
a.
- a. Aux building flooding -
Aux building flooding - STOPPED STOPPED a.
- a. RETURN TO RETURN TO RETURN TO Step 2 Step 2 (Page 15).
(Page 15).
b.
- b. SX pumps -
SX pumps - NONE RUNNING ON NONE RUNNING ON b.
- b. IF IF an SX pump is running an SX pump is running EITHER UNIT EITHER UNIT on Unit 2, on Unit 2, THEN THEN RETURN TO RETURN TO RETURN TO MAIN BODY, MAIN BODY, Step 3 (Page 3).
Step 3 (Page 3).
c.
- c. GO TO GO TO GO TO 0BwOA PRI-8, AUXILIARY 0BwOA PRI-8, AUXILIARY BUILDING FLOODING, Step 10 BUILDING FLOODING, Step 10
-END-
-END-Page 17 of 29 Page 17 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8
- ATTACHMENT B (PG 1 OF 5)
- ATTACHMENT B (PG 1 OF 5)
ESSENTIAL SERVICE WATER SYSTEM CROSSTIE ESSENTIAL SERVICE WATER SYSTEM CROSSTIE 111 START AN ADDITIONAL START AN ADDITIONAL START AN ADDITIONAL UNIT 1 UNIT 1 UNIT 1 SX SX SX PUMP PUMP PUMP:::
a.
- a. Check the following valves for Check the following valves for a.
- a. Manually open valve(s).
Manually open valve(s).
UNIT 1 UNIT 1 UNIT 1 SX train to be SX train to be started -
started - OPEN OPEN::
IF IF an SX001 valve is an SX001 valve is deenergized closed, deenergized closed, oo Train A:
Train A:
THEN THEN dispatch an operator dispatch an operator to energize the affected to energize the affected
1SX001A 1SX001A pump's suction valve:
pump's suction valve:
1SX016A 1SX016A
1SX027A 1SX027A oo 1SX001A at MCC 131X3 E4 1SX001A at MCC 131X3 E4 (383' M15)
(383' M15)
-OR-
-OR-oo 1SX001B at MCC 132X1 C1 1SX001B at MCC 132X1 C1 (364' P18 (364' P18 oo Train B:
Train B:
1SX001B 1SX001B
1SX016B 1SX016B
1SX027B 1SX027B b.
- b. Perform the following:
Perform the following:
1)
unit:
oo 2A and 2C RCFC 2A and 2C RCFC oo 2B and 2D RCFC 2B and 2D RCFC oo 1A and 1C RCFC 1A and 1C RCFC oo 1B and 1D RCFC 1B and 1D RCFC 2)
- 2) Close the SX outlet Close the SX outlet valve for the shutdown valve for the shutdown RCFC trains:
RCFC trains:
oo 2SX027A 2SX027A oo 2SX027B 2SX027B oo 1SX027A 1SX027A oo 1SX027B 1SX027B 3)
- 3) Monitor containment Monitor containment temperature and pressure temperature and pressure on on BOTH BOTH units.
units.
Page 18 of 29 Page 18 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8
- ATTACHMENT B (PG 2 OF 5)
- ATTACHMENT B (PG 2 OF 5)
ESSENTIAL SERVICE WATER SYSTEM CROSSTIE ESSENTIAL SERVICE WATER SYSTEM CROSSTIE 222 CROSSTIE SX SYSTEM CROSSTIE SX SYSTEM CROSSTIE SX SYSTEM:::
a.
- a. Locally open valves:
Locally open valves:
valves:
valves:
oo 1SX005 (330' Q19) 1SX005 (330' Q19)
1SX005 1SX005 oo 2SX005 (330' Q20) 2SX005 (330' Q20)
2SX005 2SX005 b.
- b. Check SX pump crosstie valves -
Check SX pump crosstie valves -
b.
- b. Manually or locally open Manually or locally open OPEN OPEN::
valves:
valves:
1SX033 1SX033 oo 1SX033 (330' Q17) 1SX033 (330' Q17)
1SX034 1SX034 oo 1SX034 (330' Q19) 1SX034 (330' Q19)
2SX033 2SX033 oo 2SX033 (330' Q17) 2SX033 (330' Q17)
2SX034 2SX034 oo 2SX034 (330' Q20) 2SX034 (330' Q20)
Page 19 of 29 Page 19 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8
- ATTACHMENT B (PG 3 OF 5)
- ATTACHMENT B (PG 3 OF 5)
ESSENTIAL SERVICE WATER SYSTEM CROSSTIE ESSENTIAL SERVICE WATER SYSTEM CROSSTIE 333 MONITOR MONITOR MONITOR UNIT 1 UNIT 1 UNIT 1 SX SYSTEM SX SYSTEM SX SYSTEM:::
a.
- a. Check the following:
Check the following:
a.
- a. Perform the following:
Perform the following:
UNIT 1 UNIT 1 UNIT 1 SX pump motor amps -
SX pump motor amps -
oo IF IF CENT CHG pump CENT CHG pump LESS THAN 180 AMPS LESS THAN 180 AMPS temperatures are temperatures are approaching the limits approaching the limits
UNIT 1 UNIT 1 UNIT 1 SX pump discharge SX pump discharge of TABLE A (Page 29),
of TABLE A (Page 29),
pressure -
pressure - GREATER THAN GREATER THAN THEN THEN align FP to a CENT align FP to a CENT 90 PSIG 90 PSIG::
CHG pump lube oil cooler CHG pump lube oil cooler per ATTACHMENT C per ATTACHMENT C oo 1PI-SX007 (1A SX pump) 1PI-SX007 (1A SX pump)
(Page 23) while (Page 23) while oo 1PI-SX008 (1B SX pump) 1PI-SX008 (1B SX pump) continuing with this continuing with this procedure:
procedure:
CC heat exchanger outlet CC heat exchanger outlet temperature -
temperature - LESS THAN 105 LESS THAN 105FF::
oo CENT CHG pump 2A CENT CHG pump 2A oo CENT CHG pump 2B CENT CHG pump 2B
1TI-674 1TI-674
2TI-674 2TI-674 oo Isolate SX to UNIT 2 Isolate SX to UNIT 2
0TI-675 0TI-675 RCFC train(s):
RCFC train(s):
a) a) Shutdown RCFC Shutdown RCFC train(s):
train(s):
oo 2A and 2C RCFC 2A and 2C RCFC oo 2B and 2D RCFC 2B and 2D RCFC b) b) Close RCFC SX outlet Close RCFC SX outlet valves:
valves:
oo 2SX027A 2SX027A oo 2SX027B 2SX027B c) c) Monitor containment Monitor containment temperature and temperature and pressure.
pressure.
Step continued on next page Step continued on next page Page 20 of 29 Page 20 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8
- ATTACHMENT B (PG 4 OF 5)
- ATTACHMENT B (PG 4 OF 5)
ESSENTIAL SERVICE WATER SYSTEM CROSSTIE ESSENTIAL SERVICE WATER SYSTEM CROSSTIE Step 3 (continued)
Step 3 (continued) oo Locally adjust SX outlet Locally adjust SX outlet from CC heat exchanger from CC heat exchanger valve(s):
valve(s):
oo 2SX007 (346' M20):
2SX007 (346' M20):
1)
- 1) Close 2SX007E, Close 2SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 2SX007 as Throttle 2SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 2SX007E, open 2SX007E,
Local Disc Sw.
Local Disc Sw.
oo 1SX007 (346' M16) 1SX007 (346' M16)
1)
- 1) Close 1SX007E, Close 1SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 1SX007 as Throttle 1SX007 as
required.
required.
3)
- 3) When adjustments When adjustments
are complete, are complete,
THEN THEN open 1SX007E, open 1SX007E,
Local Disc Sw.
Local Disc Sw.
oo 0SX007 (346' M16):
0SX007 (346' M16):
1)
- 1) Close 0SX007E, Close 0SX007E,
Local Disc Sw.
Local Disc Sw.
2)
- 2) Throttle 0SX007 as Throttle 0SX007 as
required.
required.
3)
- 3) WHEN WHEN adjustments adjustments
are complete, are complete,
THEN THEN open 0SX007E open 0SX007E
Local Disc Sw.
Local Disc Sw.
oo Shutdown Shutdown ANY ANY unnecessary unnecessary diesel generators.
diesel generators.
Page 21 of 29 Page 21 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8
- ATTACHMENT B (PG 5 OF 5)
- ATTACHMENT B (PG 5 OF 5)
ESSENTIAL SERVICE WATER SYSTEM CROSSTIE ESSENTIAL SERVICE WATER SYSTEM CROSSTIE 444 CHECK CHILLER OPERATION CHECK CHILLER OPERATION CHECK CHILLER OPERATION:::
a.
- a. MCR chillers -
MCR chillers - AT LEAST ONE AT LEAST ONE a.
- a. Place Place ONE ONE chiller in chiller in RUNNING RUNNING operation per BwOP VC-10, operation per BwOP VC-10, STARTUP OF THE CONTROL STARTUP OF THE CONTROL ROOM CHILLED WATER SYSTEM.
ROOM CHILLED WATER SYSTEM.
b.
- b. Restart containment chillers as Restart containment chillers as necessary necessary 555 RETURN TO MAIN BODY, Step 3 RETURN TO MAIN BODY, Step 3 RETURN TO MAIN BODY, Step 3 (Page 3)
(Page 3)
(Page 3)
-END-
-END-Page 22 of 29 Page 22 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT C (PG 1 OF 4)
ATTACHMENT C (PG 1 OF 4)
ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER 111 LOCALLY ALIGN FP TO CENT CHG PUMP LOCALLY ALIGN FP TO CENT CHG PUMP LOCALLY ALIGN FP TO CENT CHG PUMP 2A LUBE OIL COOLER 2A LUBE OIL COOLER 2A LUBE OIL COOLER:::
a.
- a. Check CENT CHG pump 2A -
Check CENT CHG pump 2A -
a.
- a. GO TO GO TO GO TO Step 3 (Page 25) to Step 3 (Page 25) to SELECTED FOR FP ALIGNMENT SELECTED FOR FP ALIGNMENT align CENT CHG pump 2B.
align CENT CHG pump 2B.
b.
- b. Connect fire hose (located in Connect fire hose (located in 2A 2A 2A CV pump room) to CENT CHG CV pump room) to CENT CHG pump 2A lube oil cooler pump 2A lube oil cooler AND AND FP FP connection outside connection outside 2A 2A 2A CV pump CV pump room (364' V18) room (364' V18) c.
- c. Check FP hose -
Check FP hose - CONNECTED TO CONNECTED TO c.
- c. IF IF only CENT CHG pump 2A only CENT CHG pump 2A CENT CHG PUMPS ON BOTH UNITS CENT CHG PUMPS ON BOTH UNITS::
is being aligned to FP, is being aligned to FP, THEN THEN GO TO GO TO GO TO Step 1d.
Step 1d.
CENT CHG pump 2A CENT CHG pump 2A IF IF CENT CHG pump 1A is CENT CHG pump 1A is
CENT CHG pump 1A CENT CHG pump 1A also being aligned, also being aligned, THEN THEN do do NOT NOT continue until continue until hose connections are hose connections are complete to BOTH CENT CHG complete to BOTH CENT CHG pumps.
pumps.
d.
valve:
0FP840 (364' V18) 0FP840 (364' V18) e.
- e. Verify fire hose -
Verify fire hose - CHARGED CHARGED::
Hose Hose NOT NOT pinched by room door pinched by room door
No kinks in hose No kinks in hose f.
- f. Open CENT CHG pump oil cooler Open CENT CHG pump oil cooler FP supply isolation valve:
FP supply isolation valve:
2SX259A (364' U20 2A CENT 2SX259A (364' U20 2A CENT CHG pump room)
CHG pump room) g.
- g. Close CENT CHG pump oil cooler Close CENT CHG pump oil cooler SX supply isolation valve:
SX supply isolation valve:
2SX258A (364' U20 2A CENT 2SX258A (364' U20 2A CENT CHG pump room)
CHG pump room)
Page 23 of 29 Page 23 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT C (PG 2 OF 4)
ATTACHMENT C (PG 2 OF 4)
ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER 222 CHECK CENT CHG PUMP 2A CHECK CENT CHG PUMP 2A CHECK CENT CHG PUMP 2A OPERATION OPERATION OPERATION:::
a.
- a. CENT CHG pump 2A -
CENT CHG pump 2A - RUNNING RUNNING a.
- a. IF IF CENT CHG pump 2A is CENT CHG pump 2A is being aligned for standby being aligned for standby operation, operation, THEN THEN GO TO GO TO GO TO Step 3 (Next Step 3 (Next Page).
Page).
IF IF CENT CHG pump 2A is CENT CHG pump 2A is desired to be running, desired to be running, THEN THEN Start CENT CHG pump Start CENT CHG pump 2A per either of the 2A per either of the following:
following:
oo BwOP CV-19, SWITCHING BwOP CV-19, SWITCHING CHARGING PUMPS CHARGING PUMPS
-OR-
-OR-oo BwOP CV-1, CV SYSTEM BwOP CV-1, CV SYSTEM STARTUP STARTUP b.
- b. Monitor temperatures listed in Monitor temperatures listed in TABLE A (Page 29) for CENT CHG TABLE A (Page 29) for CENT CHG pump 2A pump 2A c.
- c. Place a portable fan in door Place a portable fan in door opening as necessary to opening as necessary to maintain CENT CHG pump 2A room maintain CENT CHG pump 2A room temperature -
temperature - NORMAL NORMAL Page 24 of 29 Page 24 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT C (PG 3 OF 4)
ATTACHMENT C (PG 3 OF 4)
ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER 333 LOCALLY ALIGN FP TO CENT CHG PUMP LOCALLY ALIGN FP TO CENT CHG PUMP LOCALLY ALIGN FP TO CENT CHG PUMP 2B LUBE OIL COOLER 2B LUBE OIL COOLER 2B LUBE OIL COOLER:::
a.
- a. Check CENT CHG pump 2B -
Check CENT CHG pump 2B -
a.
- a. RETURN TO RETURN TO RETURN TO procedure and procedure and SELECTED FOR FP ALIGNMENT SELECTED FOR FP ALIGNMENT step in effect step in effect b.
- b. Connect fire hose (located in Connect fire hose (located in 2B CV pump room) to CENT CHG 2B CV pump room) to CENT CHG pump 2B lube oil cooler pump 2B lube oil cooler AND AND FP FP connection outside 2B CV pump connection outside 2B CV pump room (364' Y21) room (364' Y21) c.
valve:
2FP384 (364' Y21) 2FP384 (364' Y21) d.
- d. Verify fire hose -
Verify fire hose - CHARGED CHARGED::
Hose Hose NOT NOT pinched by room door pinched by room door
No kinks in hose No kinks in hose e.
- e. Open CENT CHG pump oil cooler Open CENT CHG pump oil cooler FP supply isolation valve:
FP supply isolation valve:
2SX259B (364' Y22 2B CENT 2SX259B (364' Y22 2B CENT CHG pump room)
CHG pump room) f.
- f. Close CENT CHG pump oil cooler Close CENT CHG pump oil cooler SX supply isolation valve:
SX supply isolation valve:
2SX258B (364' Y22 2B CENT 2SX258B (364' Y22 2B CENT CHG pump room)
CHG pump room)
Page 25 of 29 Page 25 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT C (PG 4 OF 4)
ATTACHMENT C (PG 4 OF 4)
ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER ALIGNMENT OF FP TO CENT CHG PUMP LUBE OIL COOLER 444 CHECK CENT CHG PUMP 2B CHECK CENT CHG PUMP 2B CHECK CENT CHG PUMP 2B OPERATION OPERATION OPERATION:::
a.
- a. CENT CHG pump 2B -
CENT CHG pump 2B - RUNNING RUNNING a.
- a. IF IF CENT CHG pump 2B is CENT CHG pump 2B is being aligned for standby being aligned for standby operation, operation, THEN THEN RETURN TO RETURN TO RETURN TO procedure procedure and step in effect.
and step in effect.
IF IF CENT CHG pump 2B is CENT CHG pump 2B is desired to be running, desired to be running, THEN THEN Start CENT CHG pump Start CENT CHG pump 2B per either of the 2B per either of the following:
following:
oo BwOP CV-19, SWITCHING BwOP CV-19, SWITCHING CHARGING PUMPS CHARGING PUMPS
-OR-
-OR-oo BwOP CV-1, CV SYSTEM BwOP CV-1, CV SYSTEM STARTUP STARTUP b.
- b. Monitor temperatures listed in Monitor temperatures listed in TABLE A (Page 29) for CENT CHG TABLE A (Page 29) for CENT CHG pump 2B pump 2B c.
- c. Place a portable fan in door Place a portable fan in door opening as necessary to opening as necessary to maintain CENT CHG pump 2B room maintain CENT CHG pump 2B room temperature -
temperature - NORMAL NORMAL d.
- d. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect
-END-
-END-Page 26 of 29 Page 26 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT D (PG 1 OF 2)
ATTACHMENT D (PG 1 OF 2)
RESTORATION OF SX TO CENT CHG PUMP LUBE OIL COOLER RESTORATION OF SX TO CENT CHG PUMP LUBE OIL COOLER NOTE NOTE If either the FP cooling or the If either the FP cooling or the portable fan will remain in place, portable fan will remain in place, Temporary Configuration Change Temporary Configuration Change Paperwork should be initiated per Paperwork should be initiated per CC-AA-112.
111 LOCALLY ALIGN SX TO CENT CHG PUMP LOCALLY ALIGN SX TO CENT CHG PUMP LOCALLY ALIGN SX TO CENT CHG PUMP 2A LUBE OIL COOLER 2A LUBE OIL COOLER 2A LUBE OIL COOLER:::
a.
- a. Check CENT CHG pump 2A -
Check CENT CHG pump 2A -
a.
- a. GO TO GO TO GO TO Step 2 (Next Page)
Step 2 (Next Page)
ALIGNED FOR FP COOLING ALIGNED FOR FP COOLING to align CENT CHG pump 2B.
to align CENT CHG pump 2B.
b.
- b. Open CENT CHG pump oil cooler Open CENT CHG pump oil cooler SX supply isolation valve:
SX supply isolation valve:
2SX258A (364' U20 2A CENT 2SX258A (364' U20 2A CENT CHG pump room)
CHG pump room) c.
- c. Close CENT CHG pump oil cooler Close CENT CHG pump oil cooler FP supply isolation valve:
FP supply isolation valve:
2SX259A (364' U20 2A CENT 2SX259A (364' U20 2A CENT CHG pump room)
CHG pump room) d.
- d. Check CENT CHG pump Check CENT CHG pump 1A 1A 1A lube oil lube oil d.
cooler - NOT ALIGNED TO FP NOT ALIGNED TO FP cooling is restored to the cooling is restored to the COOLING COOLING CENT CHG pump CENT CHG pump 1A 1A 1A lube oil lube oil cooler.
cooler.
e.
valve:
0FP840 (364' V18) 0FP840 (364' V18) f.
- f. Disconnect fire hose Disconnect fire hose g.
- g. Remove portable fan Remove portable fan Page 27 of 29 Page 27 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 ATTACHMENT D (PG 2 OF 2)
ATTACHMENT D (PG 2 OF 2)
RESTORATION OF SX TO CENT CHG PUMP LUBE OIL COOLER RESTORATION OF SX TO CENT CHG PUMP LUBE OIL COOLER 222 LOCALLY ALIGN SX TO CENT CHG PUMP LOCALLY ALIGN SX TO CENT CHG PUMP LOCALLY ALIGN SX TO CENT CHG PUMP 2B LUBE OIL COOLER 2B LUBE OIL COOLER 2B LUBE OIL COOLER:::
a.
- a. Check CENT CHG pump 2B -
Check CENT CHG pump 2B -
a.
- a. RETURN TO RETURN TO RETURN TO procedure and procedure and ALIGNED FOR FP COOLING ALIGNED FOR FP COOLING step in effect.
step in effect.
b.
- b. Open CENT CHG pump oil cooler Open CENT CHG pump oil cooler SX supply isolation valve:
SX supply isolation valve:
2SX258B (364' Y22 2B CENT 2SX258B (364' Y22 2B CENT CHG pump room)
CHG pump room) c.
- c. Close CENT CHG pump oil cooler Close CENT CHG pump oil cooler FP supply isolation valve:
FP supply isolation valve:
2SX259B (364' Y22 2B CENT 2SX259B (364' Y22 2B CENT CHG pump room)
CHG pump room) d.
valve:
2FP384 (364' Y21) 2FP384 (364' Y21) e.
- e. Disconnect fire hose Disconnect fire hose f.
- f. Remove portable fan Remove portable fan g.
- g. RETURN TO RETURN TO RETURN TO procedure and step procedure and step in effect in effect
-END-
-END-Page 28 of 29 Page 28 of 29
STEP STEP ACTION/EXPECTED RESPONSE ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED RESPONSE NOT OBTAINED REV. 105 REV. 105 REV. 105 ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION ESSENTIAL SERVICE WATER MALFUNCTION 2BwOA 2BwOA 2BwOA UNIT 2 UNIT 2 UNIT 2 PRI-8 PRI-8 PRI-8 TABLE A (PG 1 OF 1)
TABLE A (PG 1 OF 1)
VITAL EQUIPMENT TEMPERATURE LIMITS VITAL EQUIPMENT TEMPERATURE LIMITS 111 TEMPERATURE LIMITS TEMPERATURE LIMITS TEMPERATURE LIMITS:::
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
>>¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
EQUIPMENT COMPUTER TREND/POINT LIMIT EQUIPMENT COMPUTER TREND/POINT LIMIT
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CENT CHG PUMP 2A TR048 CENT CHG PUMP 2A TR048
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
INBD BRNG T0112 205 INBD BRNG T0112 205F F
OUTBD BRNG T0113 205 OUTBD BRNG T0113 205F F
THRUST BRNG T0114 205 THRUST BRNG T0114 205F F
GEAR DRIVE OIL (Local gauge at pump) 175 GEAR DRIVE OIL (Local gauge at pump) 175F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
CENT CHG PUMP 2B TR049 CENT CHG PUMP 2B TR049
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
INBD BRNG T0117 205 INBD BRNG T0117 205F F
OUTBD BRNG T0118 205 OUTBD BRNG T0118 205F F
THRUST BRNG T0119 205 THRUST BRNG T0119 205F F
GEAR DRIVE OIL (Local gauge at pump) 175 GEAR DRIVE OIL (Local gauge at pump) 175F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
SX PUMP 2A TR037 SX PUMP 2A TR037
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
INBD BRNG T0643 175 INBD BRNG T0643 175F F
OUTBD BRNG T0644 175 OUTBD BRNG T0644 175F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
SX PUMP 2B TR038 SX PUMP 2B TR038
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
INBD BRNG T0648 175 INBD BRNG T0648 175F F
OUTBD BRNG T0649 175 OUTBD BRNG T0649 175F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
AF PUMP 2A TR042 AF PUMP 2A TR042
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
THRUST BRNG T2372 165 THRUST BRNG T2372 165F F
INBD BRNG T2373 165 INBD BRNG T2373 165F F
OUTBD BRNG T2374 165 OUTBD BRNG T2374 165F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
AF PUMP 2B TR043 AF PUMP 2B TR043
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
THRUST BRNG T2377 165 THRUST BRNG T2377 165F F
INBD BRNG T2378 165 INBD BRNG T2378 165F F
OUTBD BRNG T2379 165 OUTBD BRNG T2379 165F F
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥º
-END-
-END-Page 29 of 29 Page 29 of 29
REV. 105 REV. 105 REV. 105 OPERATOR ACTION
SUMMARY
OPERATOR ACTION
SUMMARY
OPERATOR ACTION
SUMMARY
2BwOA PRI-F:8 2BwOA PRI-F:8 2BwOA PRI-F:8 FOR 2BwOA PRI-8 FOR 2BwOA PRI-8 FOR 2BwOA PRI-8 GO TO ATTACHMENT A STEP 5b IF GO TO ATTACHMENT A STEP 5b IF GO TO ATTACHMENT A STEP 5b IF FLOODING OF VITAL EQUIPMENT IS FLOODING OF VITAL EQUIPMENT IS FLOODING OF VITAL EQUIPMENT IS IMMINENT IMMINENT IMMINENT
IP-804 Page 1 of 6 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1.
You are an extra NSO.
- 2.
Both Units are at 100% power.
- 3.
A fire is occurring in the 2B Aux Feedwater Pump Room.
- 4.
The automatic CO2 actuating circuits have failed to operate.
INITIATING CUES:
- 1.
The Unit 2 Unit Supervisor has instructed you to manually initiate CO2 to the 2B Aux Feedwater Pump Room.
- 2.
Inform the Unit 2 Unit Supervisor when CO2 has been initiated to the 2B Aux Feedwater Pump Room.
IP-804 Page 2 of 6 TASK TITLE: Manual Actuation of the CO2 Fire Suppression System JPM No.:
IP-804 REV:
2013 NRC Task No.:
R-FP-002 K&A No.:
08600A2.04 Objective No.: 4C.FP-02 K&A IMP:
3.3/3.9 EXAMINEE:
EVALUATOR:
DATE:
The Examinee:
PASSED this JPM.
TIME STARTED:
FAILED TIME FINISHED:
JPM TIME:
MINUTES CRITICAL ELEMENTS:
(*) 5, 6 APPROX COMPLETION TIME: 25 MINUTES CRITICAL TIME:
NA ALTERNATE PATH: YES EVALUATION METHOD:
LOCATION:
PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL
REFERENCES:
- 1.
BwOP CO-5, MANUAL ACTUATION OF THE CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS, Rev 6.
- 2.
BwOP CO-5T2, MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2, Rev. 4.
MATERIALS:
- 1.
BwOP CO-5, MANUAL ACTUATION OF THE CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS, Rev 6.
- 2.
BwOP CO-5T2, MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2, Rev. 4.
- 3.
Watch/method of timing 79 seconds (needed for examiner, not examinee)
TASK STANDARDS:
- 1.
Determine Carbon Dioxide system manual alignment required to actuate system.
- 2.
Manually initiate the Carbon Dioxide suppression system to the 2B Aux Feedwater Pump Room.
TASK CONDITIONS:
- 5.
You are an extra NSO.
- 6.
Both Units are at 100% power.
- 7.
A fire is occurring in the 2B Aux Feedwater Pump Room.
- 8.
The automatic CO2 actuating circuits have failed to operate.
INITIATING CUES:
- 3.
The Unit 2 Unit Supervisor has instructed you to manually initiate CO2 to the 2B Aux Feedwater Pump Room.
- 4.
Inform the Unit 2 Unit Supervisor when CO2 has been initiated to the 2B Aux Feedwater Pump Room.
IP-804 Page 3 of 6 RECORD START TIME:
NOTE: Examiner needs a watch/means to time 79 seconds in step 6 of JPM.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 1.
Refer to BwOP CO-5 and BwOP CO-5T2.
CUE:
After examinee locates procedures, provide copies of BwOP CO-5 &
BwOP CO-5T2 as earned.
CUE:
All applicable prerequisites, precautions, limitations and actions have been met.
Refer to BwOP CO-5 and BwOP CO-5T2:
- Verify all applicable Prerequisites, Precautions, and Limitations and Actions are satisfactorily addressed.
SAT UNSAT N/A Comments:
- 2.
Determine and locate the appropriate Pushbutton Station for the 2B AF Pump Room.
Note: 2HS-CO032 is located on the wall to the right of 2B AF pump room door, 383 M-19.
Note: 2HS-CO033 is located on the wall to the left of 2B AF pump room door, 383 M-19.
The Procedure does not specify to try one PB prior to the other.
Determine and locate pushbutton stations for 2B AF pump room from page 2 of BwOP CO-5T2 as follows:
o Pushbutton #1 (2HS-CO032) is at Aux Bldg 383 M-19.
o Pushbutton #2 (2HS-CO033) is at Aux Bldg 383 M-19.
SAT UNSAT N/A Comments:
IP-804 Page 4 of 6 Examiners note: The examinee may attempt to actuate CO2 from both pushbuttons in the following step. Depressing both pushbuttons is NOT required since they are redundant functions.
PERFORMANCE STEP STANDARD CIRCLE APPLICABLE
- 3.
Actuate CO2 system from local pushbuttons.
CUE:
Pushbutton Station Cover is pulled down.
CUE: Pushbutton has been depressed.
NOTE: Wait 3-5 seconds and provide the following cue:
CUE: 3-5 seconds have elapsed.
CUE:
Pushbutton has been released.
CUE: For FIRST Pushbutton attempted: Pre-discharge alarm did NOT sound. No sound of CO2 flowing and discharge piping is NOT frosted.
CUE: For SECOND Pushbutton attempted (if used): Pre-discharge alarm has sounded.
CUE:
Pre-discharge alarm is stopped.
Note: Provide the following cue after the examinee has checked for CO2 flow.
CUE: No sound of CO2 flowing.
CUE: CO2 discharge piping is NOT frosted.
Perform the following at one of the pushbutton locations to attempt to actuate CO2 system from local pushbuttons: (Step may be performed twice, once at 2HS-CO032 and once at 2HS-CO033):
Pull down the cover on the pushbutton station.
Depress the pushbutton for 3-5 seconds.
Verify the pre-discharge alarm sounds. (NO ALARM sounded)
Realizes the first pushbutton did not function.
Attempt to actuate CO2 using alternate pushbutton (following first attempt).
Verify the pre-discharge alarm sounds. (ALARM sounded)
After pre-discharge alarm stops, verify CO2 discharge by sound and frosting of piping above 2CO14JB. (No sound of flow or frosting)
Determines CO2 system did not actuate.
Proceed to step F.2 (following second attempt).
SAT UNSAT N/A Comments:
IP-804 Page 5 of 6 EVALUATOR NOTE: Alternate path begins here
- 4.
Determine and locate the 2B AF Pump Room Damper Control Cabinet and determine power is available.
Note: 2CO18J is located on the wall to the left of 2B AF pump room door, 383 M-20.
Note: When correct cabinet is located, and power light is checked, provide the following cue:
CUE:
The RED (power available) light is lit.
Determine and locate the 2B AF Pump Room Damper Control Cabinet from BwOP CO-5T2 page 2 as follows:
Damper Control Cabinet (2CO18J) for 2B AF Pump Room is at Aux Bldg 383 M-20.
VERIFY power at the Damper Control Cabinet.
Power available light lit.
SAT UNSAT N/A Comments:
IP-804 Page 6 of 6 PERFORMANCE STEP STANDARD Circle applicable
- 5.
Actuate CO2 from Selector EMPC valve Note: 2CO14JB is located on the wall to the right of 2B AF pump room door, 383 M-19.
CUE:
Selector EMPC glass is broken.
CUE: Selector EMPC is rotated 90° to open position.
CUE: Sound of CO2 flowing is heard and frosting of piping is evident.
Perform the following to actuate CO2 system from the Selector EMPC valve:
Determine and locate the selector EMPC (2CO14JB) at Aux Bldg 383 M-19.
Break the selector EMPC cabinet glass.
Place selector EMPC actuator lever in the open position.
Verify CO2 discharge by sound and frosting of piping.
SAT UNSAT N/A Comments:
- 6.
Secure CO2 using the Selector EMPC valve.
CUE: After 79 seconds have elapsed, ask the examinee when the next step may be performed.
IF the examinee closes the EMPC actuator lever prior to 79 seconds has elapsed, then failure criteria is met.
CUE: Selector EMPC is in close position.
Note: After examinee closes the selector EMPC valve provide the following cue:
CUE: No sound of CO2 flowing.
CUE: Unit supervisor informs you another operator will complete BwOP CO-5.
Perform the following to secure CO2 system from the Selector EMPC valve Maintain selector EMPC in open position for >79 seconds.
Place the Selector EMPC actuator lever in the closed position.
SAT UNSAT N/A Comments:
CUE: THIS COMPLETES THIS JPM.
RECORD STOP TIME:
COMMENTS:
(Final)
PROCEDURE NO.
BwOP CO-5 BRAIDWOOD STATION UNIT NO.
REVISION NO.
6 PROCEDURE TITLE:
MANUAL ACTUATION OF THE CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS Rev Summary IR# / EC# (if applicable) 6 UCSR CO2 Abandonment withdrawn per EC 383002 EC 383002 PCRA 1118751-11
BwOP CO-5 Revision 6 Continuous Use 1
MANUAL ACTUATION OF THE CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS A.
STATEMENT OF APPLICABILITY This procedure provides the method to be used to manually actuate any of the carbon dioxide fire suppression systems, with, or without power.
B.
REFERENCES 1.
Station Procedures:
a.
BwAP 1110-1, Fire Protection Program System Requirements.
b.
BwOP CO-5T1, Manual Actuation of the Unit 1 Carbon Dioxide Fire Suppression Systems, Table 1.
c.
BwOP CO-5T2, Manual Actuation of the Unit 2 Carbon Dioxide Fire Suppression Systems, Table 2.
d.
BwOP CO-6, Carbon Dioxide Fire Suppression Systems Reset.
2.
Station Drawing: M-58, Diagrams of CO2 and H2 System, sheets 1, 2, and 4.
3.
Vendor Manual: Chemetron Fire Systems Operation and Service Manual.
4.
Exelon Radiation Protection Standards.
C.
PREREQUISITES 1.
A fire has been determined to exist in an area protected by carbon dioxide and automatic actuation of the area's fire suppression system has failed.
2.
Obtain permission from the Shift Manager, or designee, prior to performing this procedure.
3.
The system being actuated must be in service and lined up in accordance with the appropriate Mechanical Lineup for a successful actuation.
4.
Verify personnel have been evacuated from the fire area.
BwOP CO-5 Revision 6 Continuous Use 2
D.
PRECAUTIONS 1.
Actuation of a system utilizing the EMPCs WILL NOT GENERATE A PRE-DISCHARGE WARNING. Personnel must be notified to evacuate the area prior to an EMPC actuation.
2.
If there is no power to the associated fire damper control cabinet, the dampers for the zone to be actuated will not close. An actuation under these conditions will result in carbon dioxide extending beyond the area of the fire and may place plant personnel in a hazardous situation. Prior to actuating a system under these conditions, an evaluation must be made, giving consideration to the following:
a.
What is the extent and intensity of the fire?
b.
Do other feasible means exist to suppress the fire?
c.
To what extent is the fire threatening the safety of the public, plant personnel, and plant equipment?
d.
A discharge under these conditions may not extinguish the fire.
e.
All personnel anywhere near the area must be evacuated and the discharge will probably have to exceed required discharge duration.
3.
Carbon dioxide in the systems is scented with a wintergreen odorizer. If a wintergreen scent is detected, appropriate safety measures should be taken immediately.
4.
Carbon dioxide will displace oxygen in confined/enclosed spaces and will seek the lowest level and accumulate.
5.
Breathing carbon dioxide vapors may cause dizziness, faintness, headache, loss of consciousness, suffocation due to lack of oxygen.
6.
Contact with liquid carbon dioxide may cause frostbite.
BwOP CO-5 Revision 6 Continuous Use 3
E.
LIMITATIONS AND ACTIONS 1.
The Fire Brigade shall be activated in situations requiring actuation of a carbon dioxide fire suppression system.
2.
Self contained breathing apparatus, protective clothing, and fire suppression equipment shall be used when making any entry into an area that has had a carbon dioxide system actuation.
3.
Once the fire has been extinguished, an investigation into the cause and origin must take place. In order to assure the safety of personnel and to protect any existing evidence, access to the area must be restricted until it has been declared to be CLEAR by the Shift Manager, Station Fire Marshal and Radiation Protection. CLEAR status shall be declared when the initiating condition has been corrected, the atmosphere contains a minimum of 19.5% oxygen, all required investigative information has been obtained, and the area is safe for personnel to enter.
4.
Actuation of the Carbon Dioxide Fire Suppression System to any of the Diesel Generator Rooms will also actuate the system protecting the corresponding Diesel Generator Day Tank Room.
5.
Actuation of any Carbon Dioxide Fire Suppression System utilizing the EMPCs will result in IMMEDIATE discharge of carbon dioxide WITHOUT A PRE-DISCHARGE WARNING.
6.
The system Master Valves are designed to fail OPEN on loss of power. This will charge system piping with carbon dioxide up to the Selector Valves.
7.
Carbon dioxide will continue to discharge for as long as the Selector EMPC is maintained in the OPEN position. Placing the Selector EMPC in the CLOSED position will terminate the discharge.
8.
Loss of power to a damper control panel will result in the failure of associated dampers to close. An evaluation of the effect of a carbon dioxide discharge under these conditions must be made prior to actuating a carbon dioxide system.
9.
The Upper Cable Spreading Rooms Carbon Dioxide Fire Suppression System is a manual system to be used as back-up in the event that the Automatic Halon Fire Suppression System fails.
BwOP CO-5 Revision 6 Continuous Use 4
F.
MAIN BODY 1.
Manual actuation of carbon dioxide with electrical power:
NOTE Refer to BwOP CO-5T1 for Unit 1 system information. Refer to BwOP CO-5T2 for Unit 2 system information.
a.
DETERMINE the appropriate Pushbutton Station and location, for the zone to be actuated.
b.
PULL DOWN the cover on the Pushbutton Station.
c.
DEPRESS the Pushbutton for 3-5 seconds.
d.
VERIFY the pre-discharge alarm sounds.
e.
Upon termination of pre-discharge alarm, VERIFY carbon dioxide discharge by sound and frosting of supply piping.
f.
IF the Carbon Dioxide Fire Suppression System fails to actuate, THEN PERFORM step F.2.
- g.
IF the zone being actuated is in the Upper Cable Spreading rooms, THEN PERFORM the following:
1)
Wait 10 minutes.
2)
RE-PERFORM steps F.1.a thru F.1.e NOTE During the 20 minute soak time, adjacent areas should be checked to verify no fire extension, carbon dioxide leakage, or other danger to personnel and equipment.
h.
ALLOW a minimum of 20 minutes soak time prior to entering the area.
BwOP CO-5 Revision 6 Continuous Use 5
NOTE Once the fire has been extinguished, an investigation into the cause and origin must take place. In order to assure the safety of personnel and to protect any existing evidence, access to the area must be restricted until it has been declared to be CLEAR by the Shift Manager, Station Fire Marshal, and Radiation Protection.
CLEAR status shall be declared when the initiating condition has been corrected, the atmosphere contains a minimum of 19.5%
oxygen, all required investigative information has been obtained, and the area is safe for personnel to enter.
F.
1.
i.
Once the fire has been extinguished, SECURE the area, with Fire Watch, Security Guards, or otherwise, until the area has been returned to CLEAR status.
j.
IMPLEMENT the appropriate measures/actions as required by BwAP 1110-1, section E.4.
k.
WHEN appropriate, RESET the system utilizing BwOP CO-6.
BwOP CO-5 Revision 6 Continuous Use 6
F.
2.
Manual actuation of carbon dioxide without electrical power:
NOTE Refer to BwOP CO-5T1 for Unit 1 system information.
Refer to BwOP CO-5T2 for Unit 2 system information.
a.
DETERMINE the Damper Control Cabinet, and its location for the zone to be actuated.
CAUTION If there is no power to the associated Damper Control Cabinet, the fire dampers for the zone to be actuated will not close. This will result in carbon dioxide extending beyond the fire zone area and may place plant personnel in a hazardous situation. A decision must be made, taking into account the extent and intensity of the fire, the ability to suppress the fire utilizing other means, and the extent to which the fire is threatening the safety of the general public, plant personnel, and the plant itself.
All these aspects must be evaluated before discharging carbon dioxide.
b.
VERIFY power at the Damper Control Cabinet.
c.
DETERMINE the Selector EMPC and location for the zone to be actuated.
d.
BREAK the Selector EMPC Cabinet glass.
e.
PLACE the Selector EMPC in the OPEN position.
f.
VERIFY carbon dioxide discharge, by sound and frosting of supply piping.
BwOP CO-5 Revision 6 Continuous Use 7
F.
2.
g.
IF the Carbon Dioxide Fire Suppression System fails to actuate, THEN PERFORM the following for the appropriate zone(s):
1)
For Diesel Generator, D/G Day Tank or Cable Tunnel Zones:
a)
CLOSE the SELECTOR EMPC.
b)
IDENTIFY the MASTER EMPC for the affected zone.
c)
VERIFY/OPEN the MASTER EMPC.
d)
PLACE the SELECTOR EMPC in the OPEN position.
e)
VERIFY carbon dioxide discharge by sound and frosting of supply piping.
2)
For AFW Pump and AFW Day Tank Zones:
a)
CLOSE the SELECTOR EMPC.
b)
IDENTIFY the MASTER EMPC and the REDUNDANT MASTER EMPC for the affected zone.
c)
VERIFY/OPEN the MASTER EMPC.
d)
VERIFY/OPEN the REDUNDANT MASTER EMPC.
e)
PLACE the SELECTOR EMPC in the OPEN position.
f)
VERIFY carbon dioxide discharge by sound and frosting of supply piping.
3)
For LCSR Zones:
a)
CLOSE the SELECTOR EMPC.
b)
IDENTIFY the MASTER EMPC and the REDUNDANT MASTER EMPC for the affected zone.
c)
VERIFY/OPEN the MASTER EMPC.
d)
VERIFY/OPEN the REDUNDANT MASTER EMPC.
e)
PLACE the SELECTOR EMPC in the OPEN position.
f)
VERIFY carbon dioxide discharge by sound and frosting of supply piping.
BwOP CO-5 Revision 6 Continuous Use 8
F.
2.
g.
4)
For UCSR Zones:
a)
CLOSE the SELECTOR EMPC.
b)
IDENTIFY the MASTER EMPC and the REDUNDANT MASTER EMPC for the affected zone.
c)
VERIFY/OPEN the MASTER EMPC.
d)
VERIFY/OPEN the REDUNDANT MASTER EMPC.
e)
PLACE the SELECTOR EMPC in the OPEN position.
f)
VERIFY Carbon Dioxide discharge by sound and frosting of supply piping h.
MAINTAIN the SELECTOR EMPC and/or REDUNDANT SELECTOR EMPC in the OPEN position for the time specified in the Required Discharge Duration column of the applicable Table.
i.
WHEN the Required Discharge Duration has been completed, CLOSE the SELECTOR EMPC and/or REDUNDANT SELECTOR EMPC.
j.
IF the zone being actuated is in the Upper Cable Spreading Rooms, THEN PERFORM the following:
1)
WAIT 10 minutes.
2)
REOPEN the Selector EMPC for the Initial Discharge Duration again.
3)
CLOSE the Selector EMPC when the second Initial Discharge Duration has been completed.
BwOP CO-5 Revision 6 Continuous Use 9
NOTE During the 20 minute soak time, adjacent areas should be checked to verify no fire extension, carbon dioxide leakage, or other danger to personnel and equipment.
k.
ALLOW a minimum of 20 minutes soak time prior to entering the area.
l.
Once the fire has been extinguished, SECURE the area, with Fire Watch, Security Guards, or otherwise, until the area has been returned to CLEAR status.
m.
IMPLEMENT the appropriate measures/actions as required by BwAP 1110-1, section E.4.
n.
WHEN appropriate, RESET the system utilizing BwOP CO-6.
(Final)
PROCEDURE NO.
BwOP CO-5T2 BRAIDWOOD STATION UNIT NO.
TWO REVISION NO.
4 PROCEDURE TITLE:
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE UNIT 2 DIESEL GENERATOR AND DAY TANK ROOMS Rev Summary IR# / EC# (if applicable) 4 UCSR CO2 Abandonment withdrawn per EC 383002 EC 383002 PCRA 1118751-11
BwOP CO-5T2 Revision 4 Continuous Use 1
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2 UNIT 2 DIESEL GENERATOR AND DAY TANK ROOMS SUPPRESSION ZONE #
2S-37 2S-38 2S-39 2S-40 ZONE DESCRIPTION 2B D/G RM 2A D/G RM 2B D/G DAY TANK RM 2A D/G DAY TANK RM PUSHBUTTON #1 LOCATION 2HS-CO002 TURB BLDG 401' L-28 2HS-CO012 TURB BLDG 401' L-28 2HS-C0022 2B D/G RM 401' P-28 2HS-CO027 2A D/G RM 401' P-28 PUSHBUTTON #2 LOCATION 2HS-CO003 TURB BLDG 401' L-29 2HS-CO013 TURB BLDG 401' L-24 NONE NONE DAMPER CONTROL CABINET LOCATION 2CO17JB TURB BLDG 401' L-29 2CO17JA TURB BLDG 401' L-25 2CO17JB TURB BLDG 401' L-29 2CO17JA TURB BLDG 401' L-25 SELECTOR EMPC LOCATION 2CO03JB TURB BLDG 401' L-29 2CO01JB TURB BLDG 401' L-25 2CO04JB TURB BLDG 401' L-28 2CO02JB TURB BLDG 401' L-25 REQUIRED DISCHARGE DURATION 95 SECONDS (1 minute, 35 seconds) 92 SECONDS (1 minute, 32 seconds) 493 SECONDS (8 minutes, 13 seconds) 492 SECONDS (8 minutes, 12 seconds)
DAMPER CONTROL POWER SUPPLY MCC 234V3 COMPT. C2, CKT. 5 MCC 233X3 COMPT. C2 CKT. 12 MCC 234V3 COMPT. C2 CKT. 5 MCC 233X3 COMPT. C2 CKT. 12 MASTER EMPC LOCATION 0CO09J TURB BLDG 401' L-17 0CO09J TURB BLDG 401' L-17 0CO07J TURB BLDG 401' L-17 0CO07J TURB BLDG 401' L-17
BwOP CO-5T2 Revision 4 Continuous Use 2
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2 UNIT 2 AUX FW PP AND DAY TANK ROOMS SUPPRESSION ZONE #
2S-41 2S-42 ZONE DESCRIPTION 2B AUX FW PP RM 2B AUX FW PP DAY TANK RM PUSHBUTTON #1 LOCATION 2HS-CO032 AUX BLDG 383' M-19 2HS-CO038 AUX BLDG 383' M-20 PUSHBUTTON #2 LOCATION 2HS-CO033 AUX BLDG 383' M-19 NONE DAMPER CONTROL CABINET LOCATION 2CO18J AUX BLDG 383' M-20 2CO18J AUX BLDG 383' M-20 SELECTOR EMPC LOCATION 2CO14JB AUX BLDG 383' M-19 2CO15JB AUX BLDG 383' M-19 REQUIRED DISCHARGE DURATION 79 SECONDS (1 minute, 19 seconds) 167 SECONDS (2 minutes, 47 seconds)
DAMPER CONTROL POWER SUPPLY MCC 234V3 COMPT. C2, CKT. 7 MCC 234V3 COMPT. C2, CKT. 7 MASTER EMPC LOCATION 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 REDUNDANT MASTER EMPC LOCATION 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17
BwOP CO-5T2 Revision 4 Continuous Use 3
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2 UNIT 2 LOWER CABLE SPREADING ROOMS SUPPRESSION ZONE #
2S-43 2S-44 2S-45 2S-46 ZONE DESCRIPTION LCSR AREA 2Z1 LCSR AREA 2Z2 LCSR AREA 2Z3 LCSR AREA 2Z4 PUSHBUTTON #1 LOCATION 2HS-CO043 AUX BLDG 463 Q-19 2HS-CO047 AUX BLDG 463 Q-19 2HS-C0051 AUX BLDG 463 Q-19 2HS-CO055 AUX BLDG 463 Q-19 PUSHBUTTON #2 LOCATION 2HS-CO044 AUX BLDG 439' P-26 AREA 2Z2 FROM TURB BLDG 2HS-CO048 AUX BLDG 439' P-23 AREA 2Z4 FROM TURB BLDG 2HS-CO052 AUX BLDG 439' P-20 AREA 2Z4 FROM TURB BLDG 2HS-CO056 AUX BLDG 439' P-19 UPPER VLV OPERATING AREA U2 FROM TURB BLDG DAMPER CONTROL CABINET LOCATION 2CO19JA TURB BLDG 401' L-26 2CO19JB AUX BLDG 463' Q-20 2CO19JB AUX BLDG 463' Q-20 2CO19JB AUX BLDG 463' Q-20 SELECTOR EMPC LOCATION 2CO05JB AUX BLDG 439' Q-19 2CO06JB AUX BLDG 439' Q-20 2CO07JB AUX BLDG 463 Q-20 2CO08JB AUX BLDG 463 Q-20 REQUIRED DISCHARGE DURATION 1223 SECONDS (20 minutes, 23 seconds) 1168 SECONDS (19 minutes, 28 seconds) 1200 SECONDS (20 minutes, 00 seconds) 1204 SECONDS (20 minutes, 04 seconds)
DAMPER CONTROL POWER SUPPLY MCC 234V3 COMPT. C2, CKT. 9 MCC 234V3 COMPT. C2 CKT. 11 MCC 234V3 COMPT. C2 CKT. 11 MCC 234V3 COMPT. C2 CKT. 11 REDUNDANT SELECTOR EMPC LOCATION 2CO05JC AUX BLDG 439' P.5-19 2CO06JC AUX BLDG 439' P.5-19 2CO07JC AUX BLDG 439' P.5-19 2CO08JC TURB BLDG 439' P.5-19 MASTER EMPC LOCATION 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 REDUNDANT MASTER EMPC LOCATION 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17
BwOP CO-5T2 Revision 4 Continuous Use 4
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2 UNIT 2 ELECTRICAL CABLE TUNNEL SUPPRESSION ZONE #
2S-47 ZONE DESCRIPTION U-2 ELECTRICAL CABLE TUNNEL PUSHBUTTON #1 LOCATION 2HS-CO059 TURB BLDG 401' L-28 PUSHBUTTON #2 LOCATION 2HS-CO060 TURB BLDG 401' K.5-27 DAMPER CONTROL CABINET LOCATION 2CO19JA TURB BLDG 401' L-26 SELECTOR EMPC LOCATION 2CO13JB TURB BLDG 401' K-5-26 REQUIRED DISCHARGE DURATION 187 SECONDS (3 minutes, 07 seconds)
DAMPER CONTROL POWER SUPPLY MCC 234V3 COMPT. C2 CKT. 9 MASTER EMPC LOCATION 0CO09J TURB BLDG 401' L-17
BwOP CO-5T2 Revision 4 Continuous Use 5
MANUAL ACTUATION OF THE UNIT 2 CARBON DIOXIDE FIRE SUPPRESSION SYSTEMS TABLE 2 UNIT 2 UPPER CABLE SPREADING ROOMS SUPPRESSION ZONE #
2S-48 2S-49 2S-50 2S-51 ZONE DESCRIPTION UCSR AREA 2EE1 UCSR AREA 2EE2 UCSR AREA 2EE3 UCSR AREA 2EE4 PUSHBUTTON #1 LOCATION 2HS-CO063 AUX BLDG 426' P-22 2HS-CO067 AUX BLDG 426' P-22 2HS-C0071 AUX BLDG 426' P-21 2HS-CO075 AUX BLDG 426' P-21 PUSHBUTTON #2 LOCATION 2HS-CO064 AUX BLDG 463' L-25 0B VC HVAC ROOM FROM TURB BLDG 2HS-CO068 AUX BLDG 463' M-23 FROM TURB BLDG 2HS-CO072 AUX BLDG 463' P-20 FROM TURB BLDG 2HS-CO076 AUX BLDG 463' Q-18 DAMPER CONTROL CABINET LOCATION 2CO20J AUX BLDG 426' P-20 2CO20J AUX BLDG 426' P-20 2CO20J AUX BLDG 426' P-20 2CO20J AUX BLDG 426' P-20 SELECTOR EMPC LOCATION 2CO09JB AUX BLDG 426' P-22 2CO10JB AUX BLDG 426' P-20 2CO11JB AUX BLDG 426' P-21 2CO12JB AUX BLDG 426' P-21 REQUIRED DISCHARGE DURATION 152 SECONDS (2 minutes, 32 seconds) 254 SECONDS (4 minutes, 14 seconds) 244 SECONDS (4 minutes, 04 seconds) 200 SECONDS (3 minutes, 20 seconds)
DAMPER CONTROL POWER SUPPLY MCC 233V2 COMPT. B2, CKT. 13 MCC 233V2 COMPT. B2 CKT. 13 MCC 233V2 COMPT. B2 CKT. 13 MCC 233V2 COMPT. B2 CKT. 13 MASTER EMPC LOCATION 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 1CO16J TURB BLDG 401' L-17 REDUNDANT MASTER EMPC LOCATION 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17 1CO23J TURB BLDG 401' L-17 (Final)