MONTHYEARML18100A0142018-04-0404 April 2018 Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML21165A1172018-02-0606 February 2018 NX-503 Rev 0 Part 2 HBL-17-003, License Termination Plan Technical Basis Documents2017-07-0606 July 2017 License Termination Plan Technical Basis Documents HBL-14-017, Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes2014-06-10010 June 2014 Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes ML15210A7352014-02-28028 February 2014 Cultural Resources Monitoring Report No. 1, 08/2010 - 08/2013 DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask ML14128A3952013-08-31031 August 2013 Cultural Resources Monitoring Report & Recommendations, Humboldt Bay Power Plant Decommissioning, Humboldt County, California ML15211A5142013-08-31031 August 2013 Cultural Resources Monitoring Report and Recommendations ML14177A2802013-07-31031 July 2013 Preliminary Wetland Delineation for the PG&E Humboldt Bay Power Plant Canal Remediation Project, Humboldt County California, Dated July 2013 HBL-13-002, Post-Shutdown Decommissioning Activities Report, Revision 42013-07-19019 July 2013 Post-Shutdown Decommissioning Activities Report, Revision 4 ML15211A5062013-07-15015 July 2013 Cultural Resources Inventory and Evaluation ML14177A2822013-07-15015 July 2013 Cultural Resources Inventory and Evaluation, Humboldt Bay Power Plant Decommissioning, Canal Remediation Project, Humboldt County, California, Dated July 15, 2013 ML13130A0092013-05-0303 May 2013 License Termination Plan, Revision 0, Evaluation Through Chapter 2 Site Characterization - East Side Site ML13130A0112013-05-0303 May 2013 License Termination Plan, Revision 0, Chapter 2 - Site Characterization, Appendix 2-C Hbpp Groundwater Monitoring Summary Through Chapter 6 Compliance with the Radiological Criteria for License Termination ML14128A3692012-10-0101 October 2012 Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report ML13130A1402012-09-26026 September 2012 in Situ Object Counting System (Isocs) as Applied to Scan Requirements in Support of Final Status Survey at Hbpp ML13130A1372012-07-11011 July 2012 Gross Activity Dcgl in Support of the Final Status Survey at Hbpp ML14128A1132012-06-28028 June 2012 Report - Decommissioning Capstone Document ML13130A1362012-06-13013 June 2012 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Hbpp ML13130A1392012-05-16016 May 2012 Radionuclide Selection for Dcgl Development, Attachment, a Dandd Calculation Reports ML13130A1382012-05-16016 May 2012 Radionuclide Selection for Dcgl Development HBL-12-004, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 20112012-02-21021 February 2012 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 2011 ML13130A1342011-07-31031 July 2011 Humboldt Bay Power Plant (Hbpp) Historical Site Assessment 2011 Update HBL-13-008, (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils2011-07-31031 July 2011 (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML14128A1112010-10-31031 October 2010 Mitigation Plan, Humboldt Bay Power Plant. Prepared by Jrp Historical Consulting in Response to California Energy Commission for Demolition of Units 1, 2, and 3. Revision Dated October 2010 ML1027005392010-09-17017 September 2010 Scan Action Limits ML1023005572010-08-11011 August 2010 E-mail Dated August 11, 2010, from David Sokolsky, Pg&E, to John Hickman, NRC, Regarding NRC Questions on Humboldt Bay 20.2002 Request Including Radiological Characterization Report ML1027005382010-06-25025 June 2010 Marsame Survey Package - Structural Steel ML1027005372010-03-10010 March 2010 Procedure - Marsame Disposition of Materials and Equipment ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML14128A1122009-07-31031 July 2009 Mitigation Plan, Humboldt Bay Power Plant in Response to California Energy Commission CUL-10 for Demolition of Units 1, 2 and 3 HBL-09-009, Post-Shutdown Decommissioning Activities Report, Revision 32009-06-30030 June 2009 Post-Shutdown Decommissioning Activities Report, Revision 3 ML0830800972008-09-16016 September 2008 Letter Dated September 16, 2008, Providing Background Information for Conference Call with Humboldt Bay on Soil Sampling of New Generation Site HBL-08-006, Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act2008-03-31031 March 2008 Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers HBL-05-017, Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-0172005-05-27027 May 2005 Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-017 HBL-05-010, ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant2005-03-31031 March 2005 ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report ML15211A5102003-08-12012 August 2003 Cultural Resource Study for the PG&E Humboldt Bay Power Plant, ISFSI Licensing Project - Final Report HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest2002-12-27027 December 2002 Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig ML0336503802002-09-0505 September 2002 Data Report a, Revision 0, Geologic Mapping in the ISFSI Site Area. ML0336503842002-09-0505 September 2002 Data Report D, Revision 0, Trenches at the ISFSI Site. ML0336503862002-05-10010 May 2002 Data Report E, Revision 0, Soil Laboratory Test Data. ML0336503822002-05-10010 May 2002 Data Report C, Revision 0, Downhole Geophysics in ISFSI Site Area. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2018-04-04
[Table view] Category:Technical
MONTHYEARML18100A0142018-04-0404 April 2018 Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML21165A1172018-02-0606 February 2018 NX-503 Rev 0 Part 2 HBL-17-003, License Termination Plan Technical Basis Documents2017-07-0606 July 2017 License Termination Plan Technical Basis Documents ML14128A3952013-08-31031 August 2013 Cultural Resources Monitoring Report & Recommendations, Humboldt Bay Power Plant Decommissioning, Humboldt County, California ML14177A2802013-07-31031 July 2013 Preliminary Wetland Delineation for the PG&E Humboldt Bay Power Plant Canal Remediation Project, Humboldt County California, Dated July 2013 ML14177A2822013-07-15015 July 2013 Cultural Resources Inventory and Evaluation, Humboldt Bay Power Plant Decommissioning, Canal Remediation Project, Humboldt County, California, Dated July 15, 2013 ML14128A3692012-10-0101 October 2012 Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report ML13130A1402012-09-26026 September 2012 in Situ Object Counting System (Isocs) as Applied to Scan Requirements in Support of Final Status Survey at Hbpp ML13130A1372012-07-11011 July 2012 Gross Activity Dcgl in Support of the Final Status Survey at Hbpp ML14128A1132012-06-28028 June 2012 Report - Decommissioning Capstone Document ML13130A1362012-06-13013 June 2012 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Hbpp ML13130A1392012-05-16016 May 2012 Radionuclide Selection for Dcgl Development, Attachment, a Dandd Calculation Reports ML13130A1382012-05-16016 May 2012 Radionuclide Selection for Dcgl Development HBL-13-008, (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils2011-07-31031 July 2011 (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils ML13130A1342011-07-31031 July 2011 Humboldt Bay Power Plant (Hbpp) Historical Site Assessment 2011 Update ML14128A1112010-10-31031 October 2010 Mitigation Plan, Humboldt Bay Power Plant. Prepared by Jrp Historical Consulting in Response to California Energy Commission for Demolition of Units 1, 2, and 3. Revision Dated October 2010 ML1027005392010-09-17017 September 2010 Scan Action Limits ML1027005382010-06-25025 June 2010 Marsame Survey Package - Structural Steel ML1027005372010-03-10010 March 2010 Procedure - Marsame Disposition of Materials and Equipment ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML14128A1122009-07-31031 July 2009 Mitigation Plan, Humboldt Bay Power Plant in Response to California Energy Commission CUL-10 for Demolition of Units 1, 2 and 3 ML0830800972008-09-16016 September 2008 Letter Dated September 16, 2008, Providing Background Information for Conference Call with Humboldt Bay on Soil Sampling of New Generation Site HBL-05-017, Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-0172005-05-27027 May 2005 Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-017 HBL-05-010, ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant2005-03-31031 March 2005 ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest2002-12-27027 December 2002 Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig ML0336503802002-09-0505 September 2002 Data Report a, Revision 0, Geologic Mapping in the ISFSI Site Area. ML0336503842002-09-0505 September 2002 Data Report D, Revision 0, Trenches at the ISFSI Site. ML0336503862002-05-10010 May 2002 Data Report E, Revision 0, Soil Laboratory Test Data. ML0336503822002-05-10010 May 2002 Data Report C, Revision 0, Downhole Geophysics in ISFSI Site Area. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2018-04-04
[Table view] |
Text
Pacific.Gias and Electfic Cwiipany IVT I1 Gross Activity DCGL in Support of the Final Status Survey at HBPP July, 11, 2012 Martin C. Erickson Reviewed By: Xi Date: X~- eY --/.s Approved By:: _ _ Date.: L/-"/- /3
Table of Contents
1.0 INTRODUCTION
............................................................................................. 4 2.0 METHODOLOGY ........... .................................................................................
I 4 3.0 HBPP CHARACTERIZATION DATA ................................................................. 5 4.0 G ROSS ACTIVITY DCGL CALCULATION ...................................................... 6
5.0 CONCLUSION
.................................................................................................. 7
6.0 REFERENCES
.................................................................................................. 8 Tables Table 3- 1 Radionuclides and Percent Total ............................................................... 5 2
Executive Summary When surveying building surfaces for release it is most appropriate to use the actual site radionuclide mixture gross activity derived concentration guideline level (DCGL). HBPP site characterization data was used to determine the radionuclide fractions and in turn, used to derive the appropriate beta/gamma gross activity DCGL. Alpha fractions are unknown at this time so the most conservative DCGL for the predominant alpha emitters will be used as the alpha gross activity DCGL. As always, when determining the release of a unit where both beta/gamma and alpha emitters are present, the unity rule will be used to determine if the survey unit meets the release criteria.
3
1.0 INTRODUCTION
Humboldt Bay Power Plant (HBPP) is undergoing a site decommissioning with the ultimate goal of terminating the 10 CFR 50 license. The final state of the site at license termination will consist of mostly open land areas with a few structures remaining. In order for the site to achieve license termination both the soils and structures remaining must meet the release criteria as outlined in the HBPP license termination Plan (LTP).
Residual levels of radioactive material that correspond to the allowable close standards were derived by analysis of various pathways and scenarios through which exposures to a member of the critical group at HBPP could occur. These derived levels, known as DCGLs, are radionuclide specific and are expressed in units of picocuries per gram (pCi/g) for soils and disintegrations per minute per 100 centimeters squared (dpm/100 cm 2) for building surfaces.
Determining if the HBPP soils meet the release criteria is relatively straightforward insofar as the analysis of the soils is a radionuclide specific analysis. Individual nuclides are compared to their respective DCGL using the unity rule. In the case of building surfaces, however, the portable hand held instrumentation utilized at HBPP are not nuclide specific and read out in a gross activity reading. In this instance a gross activity DCGL must be calculated based on a site specific radionuclide mixture.
2.0 METHODOLOGY Surface contamination DCGLs apply to the total of fixed plus removable surface activity.
For surfaces where the radionuclide fractions are unknown the conservative approach would be to compare the measurements to the most conservative DCGL assuming that all activity present was due to the presence of that nuclide. The most realistic approach would be to determine a gross activity DCGL based upon the fractions of nuclides present at the site. The gross activity DCGL is calculated as follows:
- 1. Determine the relative fraction (f) of the total activity contributed by the radionuclide from previous radionuclide-specific analyses.
- 2. Obtain the DCGLw for each significant radionuclide present at the time of the final status survey (FSS).
4
- 3. Substitute the values of f and DCGL in the following equation 1
Gross Activity DCGL = 1 DCGLI + DCGL 2 ... DCGLJ 3.0 HBPP CHARACTERIZATION DATA A characterization was performed on the HBPP site in 2008 to include site soils and structures. Contained within this characterization were samples taken in drains and trenches inside buildings and on their roof tops. The samples of the drains and trenches were analyzed using a nuclide-specific gamma spectroscopy. Samples with identifiable amounts of plant-related activity were found on Class 1 and Class 2 structures, presently designated for demolition. While the structures identified as remaining at license termination are classified as Class 3, using the data from the other class structures would be a conservative approach. The sample results for the positively identified nuclides are contained in Table 3.1.
Table 3- 1 Radionuclides and Percent Total Cs-1 37 Co-60 Location (pCilg) % total Cs (pCiig) % total Co U3 Gen/Exciter 25.20 92.5 2.05 7.5 Unit 3 Roof 4.27 93 0.32 7.0 5.40 92 0.45 8.0 2.11 100 ND 0.0 17.1 93 1.30 7.0 Unit 1 Second Floor 0.82 91 0.08 9.0 7.79 95 0.42 5.0 7.53 96 0.30 4.0 Unit 2 Ground 5
Cs-I 37 Co-60 Location (pCilg) % total Cs (pCilg) % total Co Floor 15.20 97 0.52 3.0 Unit 2 Second Floor 2.12 94 0.14 6.0 3.79 93 0.27 7.0 As can be seen Cs-1 37 represents approximately 94% of the total activity with Co-60 contributing approximately 6%. As was stated earlier only significant radionuclides should be considered, Significant radionuclides are typically based on the guidance provided in NUREG-5849 and DG-4006 which states that only radionuclides that contribute greater than 10% of the radiation dose from all contamination, or which are present at concentrations exceeding 10% of their respective guideline values are considered as significant. While Co-60 could be considered as insignificant contributing 6% to the total activity it is appropriately conservative to include the nuclide, with its more restrictive DCGL, in the gross activity DCGL derivation. As further decay occurs the fraction of Co-60 to Cs-1 37 is reduced, thus the calculated gross activity value will be conservative over the course of the decommissioning project.
4.0 GROSS ACTIVITY DCGL CALCULATION Based on the analysis of the data presented in Table 3-1, the following calculation for the gross activity DCGL can be determined:
1 2 Gross Activity DCGL = = 4.06E + 04 dpm/lOOcm 0.94 0.06 4.66E + 04+ 1.36E + 041 Where:
0.94 is the fraction for Cs-137 4.66E+04 is the DCGL for Cs-1 37 0.06 is the fraction for Co-60 6
1.36E+04 is the DCGL for Co-60 Since there is limited data concerning the fractional composition of alpha emitters at HBPP, when surveying for alpha the DCGL of 3,000 dpm/100 cm 2 (i.e. the DCGL for Am-241 which is the most limiting prevalent alpha emitter at HBPP) will be used for alpha readings.
5.0 CONCLUSION
Based on the characterization data taken at HBPP, a gross activity DCGL of 4.06E+04 dpm/100 cm 2 for beta/gamma emitters should be used. A gross activity DCGL of 3E+04 dpm/100 cm 2 should be used for alpha emitters. When surveying for both beta/gamma and alpha activity the unity rule will be used for determining if the survey unit meets the release criteria.
7
6.0 REFERENCES
Abelquist, E. W. (2001). Decommissioning Health Physics. New York: Yaylor & Francis Group.
ENERCON. (2008). HBPP RPT 001, Revision 1, RadiologicalCharacterizationReport Humboldt Bay Power Plant.
NRC. (1992). NUREG/CR-5849, Revision 0. Manual for Conducting Radiological Surveys in Support of License Termination.
NRC. (1998). DG-4006. DemonstratingCompliance With the RadiologicalCriteria for License Teirmination.
NRC. (2000). NUREG-1 575, Revision 1. Multi-Agency RadiationSurvey and Site Investigation Manual (MARSSIM).
8