BVY 13-034, Response to Request for Additional Information Regarding Relief Request No. RR-PR-01

From kanterella
(Redirected from ML13127A076)
Jump to navigation Jump to search

Response to Request for Additional Information Regarding Relief Request No. RR-PR-01
ML13127A076
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/01/2013
From: Wamser C
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 13-034, RR-PR-01
Download: ML13127A076 (18)


Text

Entergy Nuclear Operations, Inc.

Vermont Yankee 320 Governor Hunt Rd.

SEntergy Vernon, VT 802-257-7711 Christopher J. Wamser Site Vice President BVY 13-034 May 1, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Response to Request for Additional Information Regarding Relief Request No. RR-PR-01 Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28

REFERENCES:

1. Letter, Entergy Nuclear Operations, Inc. to USNRC, "Inservice Testing Program Plan for the Fifth Ten-Year Interval," BVY 13-008, dated February 1, 2013
2. Letter, USNRC to Entergy Nuclear Operations, Inc., "Vermont Yankee Nuclear Power Station - Request for Additional Information Relating to Relief Request No. RR-PR-01 Associated with the Fifth 10-Year Inservice Testing Interval (TAC No.

MF0625)," NVY 13-040, dated April 2, 2013

Dear Sir or Madam:

In Reference 1, Entergy Nuclear Operations, Inc. (Entergy) submitted the inservice test (IST) program and relief requests for the fifth 10-year interval for Vermont Yankee Nuclear Power Station. This letter provides supplemental information to address a request for additional information (RAI) received on April 2, 2013 (Reference 2). Attachment 1 to this submittal provides Entergy's response to the RAI. Attachment 2 contains the requested service water pump IST data.

This letter contains no new regulatory commitments.

Should you have any questions concerning this letter or require additional information, please contact Mr. Robert Wanczyk at 802-451-3166.

Sincerely, CJW/plc AýwT

BVY 13-034 / Page 2 of 2 Attachments: 1. Response to Request for Additional Information

2. Inservice Test Data cc: William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Mr. Richard V. Guzman, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC 320 Governor Hunt Road Vernon, Vermont 05354 Mr. Christopher Recchia Commissioner Vermont Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601

BVY 13-034 Docket 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Response to Request for Additional Information

BVY 13-034/ Attachment 1 / page 1 of 2 REQUEST FOR ADDITIONAL INFORMATION FOR RELIEF REQUEST NO. RR-PR-01 RELATED TO TESTING OF SERVICE WATER PUMPS ENTERGY NUCLEAR OPERATIONS. INC.

VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 The Nuclear Regulatory Commission (NRC) staff is reviewing the information provided by Entergy Nuclear Operations, Inc for Vermont Yankee Nuclear Power Station, in its letter dated February 1, 2013, and has determined that additional information is necessary to complete the review of Relief Request No. RR-PR-01. The NRC staff has determined that additional information requested below will be needed to support its review.

RAI RR-P01-1 It is stated in part, in Section 6 of the Reference, that, "scheduled inspection/replacement of Service Water pumps will be on a 6 year fixed interval for this Relief Request." Please confirm that this means that each service water pump will be inspected, replaced, or rebuilt every six years or less. Also, please provide the last date of the inspection or replacement of each service water pump.

Response

Each service water pump will be inspected and rebuilt, as required, or replaced at least once every six years. The 'A' Service Water pump was replaced May 16, 2007. The 'B' Service Water pump was replaced June 14, 2012. The 'C' Service Water pump was replaced May 17, 2009. The 'D' Service Water pump was replaced June 1, 2007.

RAI RR-P01-2 Section 6 also states, in part, that, "Once per Cycle, typically during each refueling outage when plant loads are minimized, a head-flow curve will be generated in accordance with ISTB-5210, and the pump comprehensive test will be performed in accordance with ISTB-5223." Explain how generating a new head-flow curve for each pump approximately every two years, instead of using the same head-flow curve for the 6-year inspection/replacement interval, will not mask pump degradation.

Response

It is only by comparing the most recent 5-point curve to the previous curves that pump degradation can be detected. An "as-found" curve is generated each refueling outage (RFO) and compared to the curve from the previous cycle, the curves since the most recent pump rebuild, and the original manufacturer's curve. A new "as left" curve is generated for each lift adjustment or replacement. This assures the required pump capacity is available until the next scheduled adjustment, replacement, or RFO.

RAI RR-P01-3 Additionally, Section 6 states, in part, that, "On a quarterly basis, surveillance will be performed by measuring pump differential pressure, motor vibration, and motor amps.

BVY 13-034/ Attachment 1 / page 2 of 2 The data will be compared to the degree possible with the head-flow curve and vibration measurements and amps obtained during the previous 5-point test." Explain how the repeatability of the pump flow rate will be achieved, since as you noted in the above referenced document the pump flow rate cannot be measured. Also, please explain how the pump differential pressure will be measured.

Response

As stated, flow rate cannot be measured during the quarterly test, because the plant was constructed without instrumentation to obtain individual service water pump flow during operation. During the quarterly test, vibration readings are obtained and compared to the value at the -2700 gallon per minute test point on the 5-point curve. Also during the quarterly test, differential pressure (d/p) is determined by measuring discharge pressure minus the temperature-corrected, bay level measured, correlated pressure. Comparison of the differential pressure to the 5-point test is somewhat subjective, since it is affected by varying the number of operating pumps, plant loads, and cross-tied header operation. Motor amps are a measure of pump load and are conservatively compared to the quarterly vibration measurement and d/p measurement.

Primarily, the quarterly test only allows that vibration and amps be monitored within the acceptance criteria, and can be correlated to the measured d/p, but is only indicative of that pumps performance related to the number of pumps operating at the time. The once per cycle test data is used to assure the required pump capacity is available until the next scheduled adjustment, replacement, or RFO.

RAI RR-PO1-4 Please provide the inservice test data for the past 10 years for all of the service water pumps noted in this request.

Response

The inservice test (IST) 5-point (capacity) test, quarterly d/p and amperage test, and quarterly pump vibration test data for the past 10 years for all of the Service Water pumps noted in the relief request are included in Attachment 2. Note that vibration data, which is taken at all 5 points during the 5-point test, is not included in capacity test results due to the volume of data.

Additional notes on the test data:

1. Vibration test data is in units of inches per second. The .325"/sec. is generic OM Code Alert maximum, however point A-1 is approx. 1/2 of maximum.
2. The quarterly test data is from the IST trend database (original data transferred from completed test forms).
3. The 5-point test data is from the IST "set-up" validation spreadsheet (official data is contained in the completed test form). This data includes the scheduled RFO surveillance and lift adjustments.

BVY 13-034 Docket 50-271 Attachment 2 Vermont Yankee Nuclear Power Station Inservice Test Data

P-7-1A Capacity Tests, 2003 - 2013 124.00 .. ....... ... ......

- -- RF028 122.00 ""


RF029 120.00 30-Oct-2009


RFO-27 118.00 -

- RF026 116.00 -U--- 7-Feb-2013 PSID ---- RF030 114.00 - 3/6/2003 NRF024 112.00 RF025

- 2/8/2007 110.00 3/7/2007

  • -.-- 2/14/2008 108.00 3/10/2007

-- O-Vendor 106.00 K 104.00 1800 2000 2200 2400 2600 2800 3000 3200 Flow (gpm)

P-7-1 B Capacity Test, 2003 - 2013 124 122 . . . .. TRM RFO-29 120 RF028 12-Mar-2011 118 --- 9-Dec-2009 a RFO-27 116 . .

27-Sep-2008 PSID RF026 114 - .RFO-25 6/14/2012 112 .1/24/2013 1 RFO30 110 -3/6/2003

-. RF024 108 9/25/2008

- 4/28/2005 1-06oVendor 104 1800 2000 2200 2400 2600 2800 3000 3200 Flow (gpm)

P-7-1C Capacity Test, 2003 - 2013 124.00 122.00 - 05/15/2012 120.00 ' - 5/18/2012

--- 5/17/2009

- RF028 118.00 +

-- RF029 116.00 -eTRM PSID --- 2/1/2013 114.00 -U- RFO30 RF026 112.00 RF027 110.00 ,-- 6-Mar-2003 RF024 108.00 S dRFO-25

-.-<)--- Vendor 106.00 104.00 1800 2000 2200 2400 2600 2800 3000 3200 Flow (gpm)

P-7-1 D Capacity Test, 2003 - 2013 124 122 -*TRM 120 s RF029

- RF028 118 2/3/2012 116 ----- RFO-27 PSID 114 RF026 0 RFO-25 112 ----- RF024 110 Mar-2003 1/18/2013 108 RFO30 106 5/18/2010 Z Vendor 104 1800 2000 2200 2400 2600 2800 3000 3200 Flow (gpm)

OP 4181.01(Q) P-7-1A AP & Amperage 120 100 80 4~

~ 60 K-

-- *-Delta P I-

-U-Amps I....32 Amp Maximum 40 0

NN N ~ ~ -----------

0

~ ~t m'.--..........N

--- - -- ~

mtt rg, .vz , m c ml h C 0-NI mCCN..m IN N Nz-,I-N- m.. 0 ~ *Jm 0I I~I m n ( t OO

OP 4181.01(Q) P-7-1B AP & Amperage 140.00 120.00 - - ~ - -- - ----

10000-0 ,0

~-U--Amps -*-Delta P 60,00

_32 ......-...... Amp Maximum 40.00~ - --

20,00 --------

0.00 Mmm, NN .N M'C'C O'WoCO~,O Oo*~.. oo...........----------------.

30 0

OP 4181.01(Q) P-7-1C AP & Amperage 120.00 100.00 80.00 6000

'--Deita P Amps


32 Amp Maximum 40.00 20.00 0.00 . .. ______ _____ _____ -- ______ ______ _

NNN NN N NNNNNN*%NNNNNNNNNN NNNNNNNNNNNNN NNNNNNNN gx**%mN NNNNNNN NmN*NN NNNNNNNNNNNNN %NN NNN%%NNNN

OP 4181.01(Q) P-7-1D AP & Amperage 120,00 .--

100.00 80.0 00

-*-Delta P

-U-*Amps 32 Amp Maximum 40.00

,. QO000000000o0 0o0000 . 00000

.Z. . .

0000o00

. . . . oo0. .

000000000 oo~ . . . .

0000 . 000000C 8ooo . ..ooo

. . .. . . . 4a ;a-N oooo -a ooo oooo ooo ooo 0

OP 4181.01(Q) P-7-1A Vibrations 0.375 0.350 0.325 0.300 0.275 0.2S0 0.225 0.200

-u- I- n A i- 0.175

-A-1

  • Maximum Allowable Vibration 0.150 0.125 0.100 0.075 0.050 0.025 O.000 OW0 RwN~

wON mv-

~ OOO mmo

~ a.~SN~N

ýM, 0000 00 -- 00 -

0~ _Wm 0- 00--- 0o 0

0 0-- 00 0 00------0 r 000000OO 000-00--.

ONO NO )N ,0ý0 0 0

.~Y 00

--- 0 0 0 0m 00 0 00 0 0 000 000 00W00-----0 000 0mc

OP 4181.01(Q) P-7-1B Vibrations 0.4500 0.42S 0.400-- ----

0.2075- - - - - _ - -

A-1 0,5 i axmmAllowabie Vibration 0.175 . ---

0.025 [

MCI*~N 0 O~ 0 ~~~ 0 c00o 0,88 Q 00 00000000 00 000 00 00 0

a .

00 00., .

00 0 0 00 rl

-- -- ------ 0

.4~r ttl 1ON W~~l1N te00. ~

0N 01J¶N 00 (0r .1~( 0( N 0 CN 00 01 NN tt 01N NNN V01 04 o1 4N N (r

N

.(

N N NN 0'C N

1C N

Lt NN N

OP 4181.01(Q) P-7-1C Vibrations 0.400 0.375 0.350 0.325 0.300 0.275 0,250 0,225 S0.200

-Al-e-i r

.1-6-0-1 0.175 mMaximum Allowable Vibration 0,150 0.125 --- -

0,100 0.075

'_ , " m-U %P.W O.OSO 0.025 . . .. . . . . .

0.000

-a0 o 0 o00 0 0 0 0 0 0 0 0 0 0 0 an0wwowwwwwa~oN 0 0 0 0 00o 000I0ooo-o ooaooo~o000000000

. ocn4 ---------

4 4 4 4 4 4 N.4 4 Nn.

4 00 0 0 0 0 00 0 0 0 0 00 0 -----------

0 0 0 00 0 0 0 0 00 0 0 0 0 0 0 000

OP 4181.01(Q) P-7-1D Vibrations 0,350 0.325 0.300 0.275 0.250 0.225 0.200 I-0.175

.A-1 0.150 ammMaximum Allowable Vibration 0.125 0.100 0.075 0.050 0.025 t+

Z50~

~~~~OtO

~ 00 0

~ 0

~ Zý Z m;;,rrr 0 0ýO 0 . ~ N NN ~ I N NI