Text
IE%--
v--Enterg Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6685 Fax 504-739-6698 cfugate@entergy.com Chester Fugate Licensing Manager Waterford 3 W3F1-2013-0024 April 25, 2013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
REFERENCE:
Seismic Walkdown Report Revision 1 - Planned Update to Entergy's Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)
Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
- 1. Seismic Walkdown Report - Entergy's Response to NRC Request for Information Pursuant to 10 CFR 50.54(o Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (Waterford 3),
dated November 26, 2012. (W3F1-2012-0100)
(ADAMS Accession No. ML12333A276)
Dear Sir or Madam:
On November 26, 2012, Entergy submitted a Seismic Walkdown Report (Reference 1) for Waterford Steam Electric Station, Unit 3 (Waterford 3) which provided the current status and results of plant seismic walkdowns. In Reference 1, Entergy committed to perform walkdowns for equipment that could not be inspected as identified in the Seismic Walkdown Report and to submit updated reports as specified in the Seismic Walkdown Report.
The purpose of this letter is to submit, as an enclosure, the Waterford 3 Seismic Walkdown Report Revision 1. This is a planned update to the Seismic Walkdown Report. All changes and updates to the Seismic Walkdown Report are denoted using either revision bars or Revision 1 annotations. All potentially adverse seismic conditions identified in the report have been evaluated in the Corrective Action Program for operability concerns and no immediate operability concerns have been identified.
W3F1-2013-0024 Page 2 This letter contains no new regulatory commitments. Should you have any questions regarding this submittal, please contact Chester Fugate, Licensing Manager, at (504) 739-6685.
Sincerely, CF/WH
Enclosure:
Waterford 3 Seismic Walkdown Report Revision 1 cc: w/o enclosure Director, Office of Nuclear Reactor Regulation U. S. NRC Regional Administrator U. S. NRC, Region IV NRC Project Manager for Waterford 3 NRC Senior Resident Inspector for Waterford 3 RidsNrrMailCenter@nrc.gov RidsRgn4MailCenter@nrc.gov Kaly.Kalyanam@nrc.gov Marlone.Davis@nrc.gov Mica.Baquera@nrc.gov