ML13070A200

From kanterella
Jump to navigation Jump to search
Appendix D - Scenario Outline
ML13070A200
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/11/2013
From: Walton R
NRC/RGN-III/DRS/OLB
To:
References
Download: ML13070A200 (2)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Palisades Scenario No.: ONE Op-Test No.: 1 Examiners:

Operators:

Initial Conditions: 100% power with P-66B, HPSI Pump, tagged out.

Turnover:

P-66B is tagged out for a coupling alignment and will be restored to operable in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Shift orders are to alternate CCW Pumps to P-52A in service and P-52B/P-52C in standby.

Event No.

Malf.

No.

Event Type*

Event Description 1

N/A BOP (N)

Alternate operating CCW pumps 2

MS09B BOP (C)

SRO (C)

CV-0511, Turbine Bypass Valve Controller fails high; requires manual action to terminate steam demand (ONP-9) 3 ED45A SRO (T)

D/G 1-1 inoperable (local overspeed trip device broken) 4 CW01A SRO (C, T)

BOP (C)

RO (R)

P-39A, Cooling Tower Pump, trips (ONP-14) and rapid downpower (ONP-26) 5 RX23B SRO (I)

RO (I)

TYT-0200, TAVE/TREF Controller, Power Failure (ONP-13) 6 MS03A SRO (C)

RO (C)

A S/G Main Steam Line Leak inside Containment (small requiring a manual reactor trip) 7 MS03A ALL (M)

ESDE inside Containment (ramped in at time of trip) (EOP-6.0) 8 CH05A CH05B RO (I)

CHP Channels Auto Initiate Failure

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)ech Spec

Appendix D Scenario Outline Form ES-D-1 Facility: Palisades Scenario No.: TWO Op-Test No.: 1 Examiners:

Operators:

Initial Conditions: 3% power, Main Turbine is at 1800 rpm.

Turnover:

Shift orders are to synchronize Turbine to the grid and then raise power to 25% at 12% per hour.

Event No.

Malf.

No.

Event Type*

Event Description 1

N/A SRO (N)

BOP (N)

Synchronize Turbine to Grid 2

N/A SRO (N)

RO (R)

BOP (N)

Raise power to 25% at 12%/hr 3

RM08G SRO (T)

RO (C)

RIA-1811, West ESG Rm Ventilation Radiation Monitor failure 4

P-40A-1 SRO (C, T)

BOP (C)

P-40A, Dilution Water Pump, trip/breaker failed 5

ED38A SRO (C)

RO (C)

BOP (C)

D11-1, DC Bus, fuse failure (ONP-2.3) 6 RC04 ALL (M)

LOCA (requires reactor trip) 7 ED38A BOP (C)

Main Generator Bkr Auto Open Failure 8

RD16 RO (C)

Two stuck Control Rods (EOP-9.0)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)ech Spec