Appendix D Scenario Outline Form ES-D-1 Facility: Palisades Scenario No.: ONE Op-Test No.: 1 Examiners:
Operators:
Initial Conditions: 100% power with P-66B, HPSI Pump, tagged out.
Turnover:
P-66B is tagged out for a coupling alignment and will be restored to operable in 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
Shift orders are to alternate CCW Pumps to P-52A in service and P-52B/P-52C in standby.
Event No.
Malf.
No.
Event Type*
Event Description 1
N/A BOP (N)
Alternate operating CCW pumps 2
MS09B BOP (C)
SRO (C)
CV-0511, Turbine Bypass Valve Controller fails high; requires manual action to terminate steam demand (ONP-9) 3 ED45A SRO (T)
D/G 1-1 inoperable (local overspeed trip device broken) 4 CW01A SRO (C, T)
BOP (C)
RO (R)
P-39A, Cooling Tower Pump, trips (ONP-14) and rapid downpower (ONP-26) 5 RX23B SRO (I)
RO (I)
TYT-0200, TAVE/TREF Controller, Power Failure (ONP-13) 6 MS03A SRO (C)
RO (C)
A S/G Main Steam Line Leak inside Containment (small requiring a manual reactor trip) 7 MS03A ALL (M)
ESDE inside Containment (ramped in at time of trip) (EOP-6.0) 8 CH05A CH05B RO (I)
CHP Channels Auto Initiate Failure
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)ech Spec
Appendix D Scenario Outline Form ES-D-1 Facility: Palisades Scenario No.: TWO Op-Test No.: 1 Examiners:
Operators:
Initial Conditions: 3% power, Main Turbine is at 1800 rpm.
Turnover:
Shift orders are to synchronize Turbine to the grid and then raise power to 25% at 12% per hour.
Event No.
Malf.
No.
Event Type*
Event Description 1
N/A SRO (N)
BOP (N)
Synchronize Turbine to Grid 2
N/A SRO (N)
RO (R)
BOP (N)
Raise power to 25% at 12%/hr 3
RM08G SRO (T)
RO (C)
RIA-1811, West ESG Rm Ventilation Radiation Monitor failure 4
P-40A-1 SRO (C, T)
BOP (C)
P-40A, Dilution Water Pump, trip/breaker failed 5
ED38A SRO (C)
RO (C)
BOP (C)
D11-1, DC Bus, fuse failure (ONP-2.3) 6 RC04 ALL (M)
LOCA (requires reactor trip) 7 ED38A BOP (C)
Main Generator Bkr Auto Open Failure 8
RD16 RO (C)
Two stuck Control Rods (EOP-9.0)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor (T)ech Spec