NOC-AE-12002859, Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident

From kanterella
(Redirected from ML12163A331)
Jump to navigation Jump to search

Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12163A331
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/04/2012
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-12002859
Download: ML12163A331 (6)


Text

Nuclear Operating Company South Tebas ProjectE1ecttc GeneratingStation PO. Box 289 Wadsworth. Texas 77483 _

June 4, 2012 NOC-AE-12002859 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 90-Day Response to Request for Information Pursuant to 10 CFR 50.54(f)

Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insiqhts from the Fukushima Dai-ichi Accident

References:

1. Letter, Eric Leeds to E. D. Halpin, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12053A340)
2. Letter, D.W. Rencurrel to NRC, "60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident", dated May 9, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1. of Reference 1 contained specific Requested Actions and Requested Information associated with Recommendation 9.3 for Emergency Preparedness (EP) programs. In accordance with 10 CFR 50.54, "Conditions of licenses," paragraph (f),

addressees were requested to submit a written response to the information requests.

The letter also provided requested due dates for written responses.

In accordance with the Reference 1, STP Nuclear Operating Company submitted an alternative course of action for providing the requested information in Reference 2. The alternative course of action included revised information due dates and the basis for those dates. As described in our alternative course of action, Attachment 1 to this letter transmits the responses to the following information requests: Enclosure 5, communications request #2, staffing requests #3, #4, and #5.

The only commitments in this letter are summarized in Attachment 2.

STI33553629

NOC-AE-12002859 Page 2 of 3 If there are any questions regarding this letter, please contact Robyn Savage at (361) 972-7438 or me at (361) 972-7867.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: 41/2 .1..

D. ncurrel Chief Nuclear Officer Attachments: 1. Response to Request for Information Regarding Recommendation 9.3 Related to Communications and Staffing

2. List of Commitments rds

NOC-AE-12002859 Page 3 of 3 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Kevin Polio Senior Resident Inspector Richard Pena U. S. Nuclear Regulatory Commission City Public Service P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Eric Leeds Richard A. Ratliff Director, Office of Nuclear Reactor Regulation Texas Department of State Health U.S. Nuclear Regulatory Commission Services One White Flint North (MS 13 H 16M) 11555 Rockville Pike Alice Rogers Rockville, MD 20852 Texas Department of State Health Services

Attachment 1 NOC-AE-12002859 Page 1 of 2 Response to Request for Information Regarding Recommendation 9.3 Related to Communications and Staffing Communications NRC Request #2 - Describe any interim actions that have been taken or are planned to be taken to enhance existing communications systems power supplies until the communications assessmentand the resulting actions are complete.

STPNOC Actions TakenlActions Planned

1. STPNOC has purchased 2 additional satellite phones and 4 spare batteries with chargers for each Unit. These satellite phones will enhance the ability to communicate with offsite organizations. Procedures will be revised to inventory and check the functionality of the additional satellite phones, batteries, and chargers.
2. STPNOC has purchased 6 two-way radio batteries with chargers for each Unit. These batteries enhance onsite communications by increasing the length of time the two-way radios can be used by plant operations. Procedures will be revised to inventory and check the functionality of the dedicated radio batteries and chargers.
3. STPNOC has purchased 8 sound powered headsets for each Unit. The headsets enhance communications within the plant during a prolonged station blackout. The headsets will supplement existing headsets. They will be pre-staged in areas important to operations during this event. Operators will be able to easily locate the headsets and communicate with the control room while performing critical tasks. Procedures will be revised to inventory and check the functionality of the sound powered headsets.
4. STPNOC has purchased 6 diesel powered generators that could be used to provide power to battery chargers for satellite phones and two-way radio batteries. The generators will be included in the Flexible Coping strategies (FLEX) being developed for NRC Order EA-12-049 (ML12054A735).

Actions Planned Estimated Condition Completion Date Report

1. Procedures will be revised to inventory and check 12/31/12 12-11657-13 the functionality of the additional satellite phones, batteries, and chargers.
2. Procedures will be revised to inventory and check 12/31/12 12-11657-13 the functionality of the dedicated radio batteries and chargers.
3. Procedures will be revised to inventory and check 12/31/12 12-11657-13 the functionality of the sound powered headsets Staffing

Attachment 1 NOC-AE-1 2002859 Page 2 of 2 Response to Request for Information Regarding Recommendation 9.3 Related to Communications and Staffing NRC Request #3 - Identify how the augmented staff would be notified given degraded communicationscapabilities.

STPNOC Actions Taken/Actions Planned

1. Expectations will be communicated to ERO members to automatically respond to a designated staging area when made aware of a large scale external event (e.g. by direct observation, media reports, word-of-mouth, etc). These expectations will be communicated to the ERO by July 12, 2012. Procedures will be revised by December 31, 2012.

NRC Request #4 - Identify the methods of access (e.g., roadways, navigablebodies of water and dockage, airlift,etc.) to the site that are expected to be availableafter a widespreadlarge scale naturalevent.

STPNOC Actions Taken/Actions Planned

1. STP has multiple roadways to access the site:
a. From the West - Highway 521
b. From the North - Farm to Market (FM) 1468
c. From the East - Highway 521
2. STP's owner controlled area is located on the west bank of the Colorado River. The river can be used to transport personnel and small equipment by boat from surrounding areas to the site.
3. Helicopters can be used to transport personnel to the site.
4. STP has road clearing equipment and a boat onsite which may be available after a large scale event.
5. STPNOC has an agreement with Matagorda County to provide local resources upon request or state and federal resources if there is a disaster declaration. These resources include road clearing equipment, off-road and high water vehicles, boats and helicopters.

NRC Request #5 - Identify any interim actions that have been taken or are plannedprior to the completion of the staffing assessment.

STPNOC Actions Taken/Actions Planned

1. STPNOC is not planning on supplementing staff at this time.

Attachment 2 NOC-AE-12002859 Page 1 of 1 List of Commitments The following table identifies those actions committed to by the STP Nuclear Operating Company (STPNOC) in this document. Any statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments. Please direct questions regarding these commitments to Robyn Savage at (361) 972-7438.

Commitment Scheduled Condition Due Date Report

1. ERO members will be advised of the expectation to 7/12/12 12-11657-14 automatically respond to a designated staging area when made aware of a large scale external event (e.g. by direct observation, media reports, word-of-mouth, etc).
2. Procedures will be revised to include the expectation 12/31/12 12-11657-15 that ERO members automatically respond to a designated staging area when made aware of a large scale external event (e.g. by direct observation, media reports, word-of-mouth, etc).