Inservice Inspection Summary Report, End of Cycle (EOC) 21
ML13052A270
Person / Time
Site: Mcguire
Issue date: 02/06/2013
From: Capps S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13052A270 (18)


Text

STEVEN D. CAPPS PDuke Vice President

£Energy McGuire Nuclear Station Duke Energy MG01 VP / 12700 Hagers Ferry Rd.

Huntersville, NC 28078 980-875-4805 980-875-4809 fax Steven. Capps@duke-energy:corn February 6, 2013 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Duke Energy Carolinas, LLC McGuire Nuclear Station Docket No. 50-370 Steam Generator In-Service Inspection Summary Report Unit 2, End of Cycle (EOC) 21 Pursuant to ASME Section XI and McGuire Technical Specification 5.6.8, Duke Energy hereby submits the attached Steam Generator In-Service Inspection Summary Report for the McGuire Unit 2 EOC 21 refueling outage.

Questions regarding the attached report should be directed to Kay Crane, McGuire Regulatory Affairs at (980) 875-4306.

Steven D. Capps Attachment wtDu www. duke-energy, corn

U. S. Nuclear Regulatory Commission February 6, 2013 Page 2 xc:

Mr. Victor McCree U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 Mr. Jon H. Thompson NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 8G9A 11555 Rockville Pike Rockville, MD 20852-27238 John Zeiler NRC Senior Resident Inspector McGuire Nuclear Station

Steam Generator In-service Inspection Summary Report McGuireNuclear Station Unit 2 EOC,21 Fall Outage 2012 Location: McGuire Nuclear Station, 12700 Hagers Ferry Road Huntersville, N.C. 28078-9340 NRC Docket No. 50-370 National Board No. 84 Commercial Service Date: March 1, 1984 Owner: Duke Energy Carolinas, LLC 526 South Church St.

Charlotte, N.C. 28202 Revision 0 Prepared By: e~ft ,i--,Žpýate: 14ad/, 3 Checked By: Date: 1!2 e31.2Q Approved By: (444; Date:

,¢ Document Completion Date: _ _/3 /_ CIa

ControlledDistribution Copy No. Assigned To Original McGuire Nuclear Station Document Control Master File MC 1201.35 1 NRC Document Control UncontrolledDistribution 2 Hartford Steam Boiler Inspection and Insurance Corporation (AlA) 3 State of North Carolina Department of Labor

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner: Duke Energy Corporation, 526 S. Church St.. Charlotte, NC 28201-1006 (Name and Address of Owner)
2. Plant: McGuire Nuclear Station, 12700 Hagers Ferry Rd, Huntersville, NC 28078-9340 (Name and Address of Plant)
3. Plant Unit: 2
4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date: March 1, 1984
6. National Board Number for Unit 84
7. Components Inspected:

Manufacturer State or National Component Manufacturer Serial No. Province No. Board No.

Steam Generator 2A BWI 7700-02 NC-302674 159 Steam Generator 2B BWI 7700-04 NC-302675 161 Steam Generator 2C BWI 7700-01 NC-302676 158 Steam Generator 2D BWI 7700-03 NC-302677 160 Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

FORM NIS-1 (Back)

8. Examination Dates April 4th. 2011 to November 29th, 2012
9. Inspection Period Identification: Third Period
10. Inspection Interval Identification: Third Interval
11. Applicable Edition of Section XI 1998 Addenda 2000
12. Date/Revision of Inspection Plan: March 26t", 2008 Revision 1
13. Abstract of Examinations and Test. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.
14. Abstract of Results of Examination and Tests. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.
15. Abstract of Corrective Measures. Reference attached response to technical specification 5.6.8 Steam Generator Tube Inspection Report.

We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) NA Expiration Date NA Date -. ,* 2.pr - 20 / 3 Signed Duke Energy Corp. By Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of NC employed by *The Hartford Steam Boiler Inspection & Insurance Company of Connecticut have ins ected Aie components described in this Owner's Report during the period '-/ -../ -,, 0 1 1 to _7//- a V - A- / Rý., and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in the Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, test, and corrective measures described in this Owner's Report.

JFurthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or roperty damage or a oss of any kind arising from or connected with this inspection

/-, Commissions/!JL /I'7Z. AX-- /5c't- j/A/I2JJ C

Insped&s Signature National Board, State, Province, andir Endorsements Datea! / 20 /3

  • The Hartford Steam Boiler Inspection & Insurance Company of Connecticut 200 Ashford Center North Suite 205 Atlanta, GA. 30338

Attachment to Form NIS-1 McGuire 2 EOC 21 Steam Generator Tube Inspection Report Pursuant to ASME Section XI and McGuire Technical Specification 5.6.8 the following information is provided:

a. The scope of inspections performed on each SG Baseline inspection scope includedfull length data acquisition and bobbin coil data analysis on allfour (4) steam generatorsas follows.
1) 50% random sample of all tubes in allfour Steam Generators.
2) All tubes with previous indications,e.g., wear, DNT, PLP, etc.
3) All tubes surroundingplugged tubes.
4) Periphery tubes two rows deep in the hot leg and cold leg (outer perimeter and open lane).

Special interest inspection scope included data acquisition and array data analysis as follows:

1) Periphery tubes (5 tubes infrom periphery)from top of tubesheet to the first support in both hot leg (TSH to O1H) and cold leg (TSC to 01 C).
2) Bounding inspection two tubes deep for tubes plugged last inspectionfor loose parts.
3) All new DNT and new TWD reported duringEOC21.
4) All DNT like anomalies at the top of tubesheet in SG A.
5) All bobbin I-codes and PLP.
6) All confirmed ECTPLP callsfrom the previous inspection.

Plug inspection scope asfollows.:

1) Visual inspection of allplugs Secondary Side visual inspection scope as follows:
1) Top of tubesheet, five tube pitches deep from the periphery and tubefree lane in allfour Steam Generatorsfor loose parts.
2) Steam Drum inspection and seventh lateralsupport in the 2A SG.
b. Active degradation mechanisms found Tube wear at support structures andfrom loose parts was the only degradation mechanism found.
c. Non-destructive examination techniques utilized for each degradation mechanism

Bobbin was used to detect wear at support structures.Bobbin, array, and +Pointwere used to detect and characterize wearfrom loose objects.

d. Location, orientation (if linear), and measured sizes (if available) of service induced indications The complete listingfor service induced indications is referenced in attachment#1.
e. Number of tubes plugged during the inspection outage for each active degradation mechanism In the 2B SGfive tubes were plugged as a preventive measure due to a foreign object that could not be removed. In the 2C SG eight tubes were plugged due to wear and as a preventive measure associatedwith a foreign object that could not be removed.
f. The total number and percentage of tubes plugged to date Tubes Plugged Steam Generator A B C D Total Prior to 2EOC21 20 3 5 5 33 2EOC21 0 5 8 0 13 Total 20 8 13 5 46

% Plugged 0.30% 0.12% 0.20% 0.08% 0.17%

g. The results of condition monitoring, including. the results of tube pulls and in-situ pressure testing An NDE maximum depth call of 49% TWor less is sufficient to demonstrate a minimum degraded tube burstpressure of 3AP at 0.95 probabilitywith 50%

confidencefor wear at support structures. This calculation considers a potential2% MUR power uprate at McGuire Unit 2 and associatedincrease in the operatingpressurefrom the previously used value of 3,900 psi to 4,125 psi.

This value is especially conservative as the uprate has not yet been performed.

The worst case support structure wear call observed duringthe McGuire 2EOC21 inspectionfor wear at structureswas 27% TW. Therefore, condition monitoringstructuralintegrity has been demonstratedfor support structure wear. Since the burstpressure equation treats though-wall tearingas coincidentwith burst, demonstrationof structuralintegrity also demonstrates leakage integrity at the lower differentialpressureof a postulatedsteam line break accident.

In addition to structuralsupport wear, there was one tube in SG 2C which exhibited two indicationsofforeign object wear. This tube (Row 109, Column

72) and those surroundingtheforeign object were plugged because the part could not be retrieved. Both indicationswere examined with a +Pointprobe to demonstrate condition monitoring acceptability. The EPRI Steam GeneratorIn Situ Pressure Test Guidelinesprovide screening criteriaforforeign object wear with a +Pointexam. The acceptance criterion is quoted below for foreign object wear:

"Forforeign object wear and cold leg thinning if VM < 2 volts and axial length

is <1 inch, condition monitoring is met for structuralintegrity and a prooftest is not necessary.

The +Pointsizing of theforeign object wear indicationsin SG 2C were 0.49 and 0.52 volts and were 0.23 and 0.38 inchesfor a combined length of 0.61 inches, thus easily meeting condition monitoring requirements.

All plugs were visually inspected. No anomalies ofplugs were found.

Secondary side inspections were performed on allfour SG's at the lower tubesheet. A number offoreign objects were identified in the tubesheet region.

Theseforeign objects were either removed, evaluated to be acceptable to leave in place, or surroundingtubes were preventively plugged.

A Steam Drum and 7th latticegrid visual inspection was performed in the 2A SG. Some expected erosion of the primary and secondaryseparatorswas noted.

No other issues were noted.

No in-situ testing was required orperformed. No tube pulls were performed.

h. The effective plugging percentage for all plugging in each SG The effective pluggingpercentagefor each of the McGuire Unit 2 Steam Generatorsis identicalto those shown in section 69 above.

Attachment #1 Location, orientation, and measured sizes of service induced indications SO - A Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:45:14

-+ - -+-..-..

- - -- --.. --. - .--.+- -. - .+ . . ---

I ROW COL VOLTS DEC INC PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L U2 U11 PCT 8 P2 06H .53 WAR TEH TEC .560 ZBAZC 71 C 59 1i .17 0 49 32 .15 0 PCT 6 P2 FB5 -. 86 WAR TEH TEC .560 ZBAZC 67 C 67 34 .17 0 PCT 7 P2 04H .59 WAR TEH TEC .660 ZBAZC 67 C 11 42 .19 0 PCT 9 P2 05H -1.79 WAR CBH TEH .560 ZBAZC 10 H 64 51 .10 0 PCT 6 P2 FA5 .76 WAR TEH TEC .560 ZBAZC 65 C 82 51 .20 0 PCT 10 P2 FB4 -1.31 WAR TEH TEC .560 ZBAZC 66 C 52 57 .12 0 PCT 6 P2 FB4 -. 79 WAR TEH TEC .660 ZBAZC 59 C 62 57 .20 0 PCT 10 P2 FB4 1.43 WAR TEH TEC .560 ZBAZC 59 C I14 59 .29 0 PCT 12 P2 FB4 1.13 WAR TEH TEC .5666 ZBAZC 61 C 6N 60 .34 0 PCT 14 P2 FB5 1.62 WAR TEH TEC .660 ZBAZC 61 C 73 62 .20 0 PCT 9 P2 FB7 -2.00 WAR TEH TEC .560 ZBAZC 61 C 101 62 .16 0 PCT 4 P2 FB4 1.57 WAR TEH TEC .560 ZBAZC 61 C 62 63 .17 0 PCT 9 P2 FB5 1.51 WAR TEH TEC .560 ZBAZC 69 C 66 63 .11 0 PCT 6 P2 F64 -1.64 WAR TEH TEC .560 ZBAZC 59 C 80 63 .18 0 PCT 9 P2 F64 .81 WAR TEH TEC .560 ZBAZC 59 C 68 63 .27 0 POT 13 P2 FB5 .94 WAR TEH TEC .560 ZBAZC 59 C 99 64 .11 0 PCT 6 P2 FB5 1.68 WAR TEH TEC .660 ZBAZC 59 C 105 64 .14 0 PCT 7 P2 FB4 .57 WAR TEH TEC .560 ZBAZC 59 C 64 6N .12 0 PCT 5 P2 FB5 1.51 WAR TEH TEC .560 ZBAZC 61 C 74 6E .23 0 PCT 10 P2 FB5 -1.03 WAR TEH TEC .560 ZBAZC 61 C 76 65 .23 6 PCT 10 P2 FB5 .64 WAR TEH TEC .560 ZBAZC 61 C 61 66 .20 0 PCT 8 P2 FB6 1.88 WAR TEH TEC .560 ZBAZC 57 C 97 66 .19 0 PCT 6 P2 FB4 1.30 WAR TEH TEC .660 ZBAZC 57 C 116 67 .19 6 PCT 10 P2 FB4 1.04 WAR TEH TEC .560 ZBAZC 59 C 91 68 .12 0 PCT 6 P2 FB3 .60 WAR TEH TEC .560 ZBAZC 6 C 97 68 .16 0 PCT 9 P2 FB3 .40 WAR TEH TEC .660 ZBAZC 55 C 97 66 .20 0 PCT 10 P2 FB5 -. 67 WAR TEH TEC .660 ZOAZC 55 C 101 68 .12 0 PCT 7 P2 FB6 1.63 WAR TEH TEC .560 ZBAZC 55 C 86 69 .44 0 PCT 16 P2 FB4 1.44 WAR TEH TEC .560 ZBAZC 57 C 86 69 .36 0 PCT 14 P2 FB5 -1.76 WAR TEH TEC .560 ZBAZC 57 C 92 69 .24 0 PCT 10 P2 FB5 -1.73 WAR TEH TEC .660 ZBAZC 67 C 61 70 .21 0 PCT 9 P2 FB6 1.61 WAR TEH TEC .560 ZBAZC 67 C 79 70 .26 0 PCT 8 P2 FAR .68 WAR TEH TEC .560 ZBAZC 67 C 105 70 .3E 0 PCT 14 P2 FOE .60 WAR TEH TEC .560 ZBAZC 57 C 111 70 .23 0 PCT 9 P2 F64 -1.45 WAR TEH TEC .560 ZBAZC 67 C I111 70 .79 0 PCT 2E P2 FPO .71 WAR TEH TEC .560 ZBAZC 57 C P2 FB6 1.92 WAR TEH TEC .560 ZBAZC 57 C I111 70 .38 0 PCT 15 71 .09 0 PCT 4 P2 F64 -1.01 WAR TEH TEC .560 ZBAZC 66 C 62 86 73 .80 0 PCT 25 P2 FO5 -1.06 WAR TEH TEC .560 ZBAZC 67 C 85 74 .36 0 PCT 14 P2 07H .50 WAR TEH TEC .560 ZBAZC 57 C I111 74 .18 0 PCT 7 P2 FB4 1.46 WAR TEH TEC .560 ZBAZC 67 C 60 75 .14 0 PCT 7 P2 FB4 1.52 WAR TEN TEC .566 ZBAZC 55 C 84 75 .20 0 PCT 10 P2 08H .62 WAR TEH TEC .560 ZBAZC 55 C 96 75 .14 0 PCT 7 P2 FB6 .65 WAR TEH TEC .560 ZBAZC 55 C 65 76 .07 0 PCT 3 P2 F65 -. 38 WAR TEH TEC .560 ZBAZC 55 C 71 76 .23 0 PCT 11 P2 FB4 -. 87 WAR TEH TEC .560 ZBAZC 55 C 71 76 .27 0 PCT 13 P2 FP5 1.00 WAR TEH TEC .560 ZBAZC 55 C 101 76 .17 0 PCT 8 P2 FB6 .63 WAR TEH TEC .660 ZBAZC 56 C

.09 0 PCT 4 P2 FP4 -. 76 WAR TEH TEC .660 ZBAZC 55 C 107 76 117 76 .65 0 PCT 22 P2 FB3 1.36 WAR TEH TEC .560 ZBAZC 57 C

.21 0 PCT 9 P2 FB4 .89 WAR TEH TEC .660 ZBAZC 57 C 117 76 117 76 .76 0 PCT 24 P2 FB5 -1.77 WAR TEH TEC .560 ZBAZC 57 C 77 .22 0 PCT 9 P2 FB4 -. 73 WAR TEH TEC .660 ZBAZC 57 C 70

.29 0 PCT 14 P2 FB4 -1.18 WAR TEH TEC .660 ZBAZC 55 C 86 77 100 77 .11 0 PCT 5 P2 FB5 -. 89 WAR TEH TEC .560 ZBAZC 55 C

.26 0 PCT 12 P2 FB4 1.41 WAR TEH TEC .560 ZBAZC 55 C 106 77 110 77 .42 0 PCT 18 P2 FB4 -1.07 WAR TEH TEC .560 ZBAZC 55 C VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L U2 U1I I ROW COL

+ . . . . . . . -- --- ---- --. . _ _ _÷ .. . -- - -- - - -- - - - - - - - . .+

...+ . . .. + .. . .+.

ST Max

SG - A Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:45:14 I ROW COL VOLTS DEC IND. PER CHN LOCN INCH1 INCH2 UTILO UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L U2 Ull WAR--------.-- ------. -4

. . 6. 6..

. 0_ _÷ . . . . . . . . . ... .

110 77 .31 0 PCT 14 P2 FB5 -1.17 55 C WAR TEH TEC .560 ZBAZC 110 77 .23 0 PCT 11 P2 FB7 .57 WAR TEH TEC .560 ZBAZC 55 C 114 77 .17 0 PCT 9 P2 FB6 .48 WAR TEH TEC .560 ZBAZC 55 C 95 78 .17 0 PCT 9 P2 FB5 -1.21 WAR TEH TEC .560 ZBAZC 55 C 101 78 .30 0 PCT 14 P2 FB3 1.61 WAR TEH TEC .560 ZBAZC 55 C 107 78 .32 0 PCT 15 P2 FB3 1.79 WAR TEH TEC .560 ZBAZC 55 C 107 78 .25 0 PCT 12 P2 FB4 .66 WAR TEH TEC .560 ZBAZC 55 C 115 78 .48 0 PCT 18 P2 FB4 - .53 WAR TEH TEC .560 ZBAZC 57 C 115 78 .70 0 PCT 23 P2 FB6 -1.34 WAR TEH TEC .560 ZBAZC 57 C 115 78 .26 0 PCT 13 P2 FB7 1.46 WAR TEH TEC .560 ZBAZC 57 C 72 79 .12 0 PCT 6 P2 FB4 1. 34 WAR TEH TEC .560 ZBAZC 55 C 69 80 .16 0 PCT 8 P2 FB5 1.13 WAR TEH TEC .560 ZBAZC 55 C 80 81 .15 0 PCT 7 P2 FB4 -1.58 WAR TEH TEC .560 ZBAZC 53 C 75 82 .27 0 PCT 11 P2 FB4 -1.29 WAR TEH TEC .560 ZBAZC 57 C 83 82 .18 0 PCT 7 P2 F85 - .68 WAR TEH TEC .560 ZBAZC 57 C 115 82 .24 0 PCT 11 P2 FB2 -1.33 WAR TEH TEC .560 ZBAZC 53 C

.37 0 PCT 15 P2 FB3 - .65 WAR TEH TEC .560 ZBAZC 53 C 116 82

.31 0 PCT 13 P2 F84 1.11 WAR TEH TEC .560 ZBAZC 53 C 116 82 115 82 .15 0 PCT 9 P2 FB5 -1.96 WAR TEH TEC .560 ZBAZC 53 C 48 83 .15 0 PCT 8 P2 FB4 1.26 WAR TEH TEC .560 ZBAZC 51 C 86 83 .20 0 PCT 10 P2 FB5 1.06 WAR TEH TEC .560 ZBAZC 51 C 96 83 .23 0 PCT 11 P2 FB5 .63 WAR TEH TEC .560 ZBAZC 51 C 83 .42 0 PCT 17 P2 FB5 .66 WAR TEH TEC .560 ZBAZC 51 C 108

.40 PCT 18 P2 FB4 -1.10 WAR TEH TEC .560 ZBAZC 55 C 99 84 0 115 84 .12 0 PCT 5 P2 FB4 -1.06 WAR TEH TEC .560 ZBAZC 53 C 84 .27 0 PCT 14 P2 FB4 .65 WAR TEH TEC .560 ZBAZC 53 C 115 102 85 .23 0 PCT 13 P2 FB4 1 . 30 WAR TEH TEC .560 ZBAZC 51 C 110 85 .22 0 PCT 12 P2 FB3 1.27 51 C WAR TEH TEC .560 ZBAZC 110 85 .31 0 PCT 14 P2 FB5 1.01 WAR TEH TEC .600 ZBAZC 51 C 83 86 .46 0 PCT 18 P2 FB4 .97 WAR TEH TEC .560 ZBAZC 51 C 9R 86 .09 0 PCT 5 P2 FB4 1.22 WAR TEH TEC .560 ZBAZC 51 C 47 98 .16 0 PCT 7 P2 FB5 .76 WAR TEH TEC .560 ZBAZC 53 C 85 90 .06 0 PCT 4 P2 FB4 -. 77 WAR TEH TEC .560 ZBAZC 53 C 56 97 .12 0 PCT 7 P2 FB5 1.72 WAR TEH TEC .560 ZBAZC 45 C 17 116 .13 0 PCT 7 P2 07C -1.54 WAR TEH TEC .560 ZBAZC 35 C 0 PCT 5 P2 FB4 1.64 WAR TEH TEC .560 ZBAZC 37 C 17 140 .08

.. . . + . . . . . . . ÷ . . . .. . + . . . . + . . . + . . . . . .+ . . . . . . . . . .- ---- . . . . .

ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L U2 Ull Tubes: 77 Records: 93 ST Max

SG - B Service Induced Indications McGuire 2 2EOC21 MN NS 20121001 01/22/2013 11:47:31 VOLTS D. +---+ PER. C.... LOCH..

I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH2 INCHL UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

-- ----- -- --.--- --.-----.-- ---. + . . . .-

+ ........ + .... WAR --------- -------- -- ....--

E------- ..

EC.--- ..560 BA

.. .C 39....

.+

2012/10/01 89 56 .18 0 PCT 10 P2 FB4 1.50 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 107 56 .13 PCT FB4 -. 80 WAR 1EV TEC .560 ZBAZC 39 CI 2012/10/01 104 59 .12 PCT FB4 -1.46 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 106 59 .11 PCT FB4 1.33 WAR 1EV TEC .560 ZBAZC 39 Cj 2012/10/01 91 60 .20 PCT FB3 -. 61 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 91 60 .25 PCT FB4 -. 92 2012110/01 91 60 .27 PCT FB5 -.92 WAR WAR 1EV TEH TEC TEC

.560

.560 ZBAZC ZBAZC 39 39 Cl Cj I

2012/10/01 78 61 .16 PCT FB5 -1.62 WAR TEH TEC .560 ZBAZC 37 CI I

2012/10/01 102 61 .46 PCT FB4 -1.44 WAR TEH TEC .560 ZBAZC 39 CI WAR TEV TEC .560 ZBAZC 39 CI 2012/10/01 108 61 .41 PCT FB4 .59 WAR TEH TEC .560 ZBAZC 37 Cl 2012/10/01 108 61 .21 PCT FB7 1.79 WAR TEH TEC .560 ZBAZC 37 CI 2012/10/01 54 63 .11 PCT FB5 1.17 WAR 1EV TEC .560 ZBAZC 39 CI 2012/10/01 85 64 .22 PCT FB7 .72 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 82 65 .15 PCT FB4 -. 49 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 108 65 .15 PCT FB4 .63 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 73 66 .11 PCT FB4 .78 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 77 66 .14 PCT FB4 .29 WAR TEH TEC .560 ZBAZC 39 CI 2012/10101 79 66 .16 PCT FB4 .67 WAR TEH TEC .560 ZBAZC 39 CI 2012/10101 87 66 .17 PCT FB3 .69 WAR TEH TEC .560 ZBAZC 39 Cj 2012/10/01 91 66 .16 PCT FB3 .91 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 95 66 .13 PCT FB3 .65 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 101 66 .20 PCT FB3 .63 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 103 66 .15 PCT FB4 1.29 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 105 66 .33 PCT F83 .58 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 107 66 .11 PCT F83 .63 WAR TEH TEC .560 ZBAZC 41 CI 2012/10/01 70 67 .19 PCT F85 .58 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 80 67 .20 PCT F83 -1.84 WAR TEH TEC .560 ZBAZC 41 CI 2012110101 84 67 .24 PCT FB4 1.49 WAR TEV TEC .560 ZBAZC 43 Cj 2012/10/01 90 67 .41 PCT FB4 -1.05 WAR TEV TEC .560 ZBAZC 39 CI 2012/10/01 90 67 .33 PCT FB5 -1. 11 WAR TEH TEC .560 ZBAZC 39 Cl 2012/10/01 98 67 .19 PCT FB3 1.83 WAR TEH TEC .560 ZBAZC 39 Cl 2012/10/01 91 68 .13 PCT FB3 .68 WAR TEH TEC .560 ZBAZC 39 CI 2012/10/01 89 70 .13 PCT FB3 ,00 WAR TEH TEC .560 ZBAZC 43 Cj 2012110/01 11 70 .21 PCT FB2 .00 2012/10/01 111 70 .29 PCT FB3 .00 2012110/01 111 70 .27 PCT FB4 .00 WAR 1EV TEC .560 ZBAZC 43 CI 2012110101 111 70 .23 PCT FB5 .00 WAR TEH TEC .560 ZBAZC 43 CI 2012/10101 111 70 .23 PCT WAR 1EV TEC .560 ZBAZC 43 C1 FB6 .00 2012110/01 111 70 .17 PCT FB7 .00 WAR 1EV TEC .560 ZBAZC 43 Cl 2012/10/01 68 71 .12 PCT FBI .73 2012/10/61 99 74 .20 PCT FB4 1. 11 WAR 1EV TEC .560 ZBAZC 43 CI 2012/10/01 88 75 .09 PCT FB6 1.73 WAR 1EV TEC .560 ZBAZC 43 CI 2012/10/01 96 75 .09 PCT F86 1.73 WAR 1EV TEC .560 ZBAZC 43 CI WAR TEH TEC .560 2012/10101 98 75 .25 PCT FB6 1.63 WAR 1EV TEC .560 ZBAZC ZBAZC 47 43 Cl CI WAR TEH TEC .560 ZBAZC 47 Cl 2012/10/01 106 75 .08 PCT FB6 1.58 WAR 1EV TEC .560 ZBAZC 43 CI WAR TEH TEC . 560 ZBAZC 47 C1 2012/10/01 69 76 .14 PCT F84 -1.18 WAR WAR 1EV TEH TEC .560

.560 ZBAZC 43 43 Cj CI 2012/10/01 95 76 .15 PCT F86 .70 WAR WAR 1EV TEH TEC .560

.560 ZBAZC ZBAZC 47 41 CI Cj 2012/10/01 97 76 .06 PCT FB3 1.79 WAR WAR 1EV TEH TEC TEC .560

.560 Z8AZC ZBAZC 47 43 CI Cj WAR TEH TEC .560 ZBAZC 49 C!

WAR 1EV TEC .560 Z8AZC 49 CI 2012/10/01 103 76 .08 PCT FB3 1.79 WAR TEH TEC .560 ZBAZC 43 CI WAR TEH TEC .560 ZBAZC 43 Cl 2012/10/01 78 77 .17 PCT FB2 .77 WAR TEH TEC .560 ZBAZC 51 CI 2012/10/01 65 78 .06 PCT FB4 -. 95 2012/10/01 81 78 .21 PCT FB5 .95 WARH UTL TL RE RI E ET EH TC .560 ZBAZC CAL C 2012/10/01 73 86 .19 PCT FB5 .76 WAR TEH TEC .560 ZBAZC 51 CI

--- - -- -AR - - - - -- - - - - - - I - --- --E- - -- -- -- --- -- - - --- -- - - --

2012/10/01 64 87 .05 PCT FB2 -2.14 WAR TEH TEC .560 ZBAZC 4 CLI 2012/10/01 81 88 .17 PCT 09H .71 2012/10/01 72 89 .08 PCT FB8 .89 2012110/01 62 93 .20 PCT FB5 1.54 I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1

. . . . . . + . . . . + -- --- --- -. . - ---.

1 ST Max

SG - B Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:47:31 I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

...... + .... WAR. .+.. . . . .. .+. . TEN...... +- ... 6.. + ZBAZC..

TEC.+ 49......

+ I÷ I 2012/10101 42 95 .17 0 PCT 9 P2 05H -1.91 WAR TEH TEC .560 ZBAZC 49 CI I 2012110/01 40 97 .17 0 PCT 10 P2 04H .61 WAR TEH TEC .560 ZBAZC 43 Cl I 2012/10/01 49 102 .16 0 PCT 11 P2 06H -1.56 WAR TEH TEC .560 ZBAZC 55 CI I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

+ . . . .. . ... . + . .. + . . . + . . .. . .. . + . . . + . . . + . .. + . . . . . . . . +

Tubes: 51 Records: 60 2 RT Ma

SG - C Service Induced Indications McGulre 2 2EOC21 MNS 20121001 01/22/2013 11:49:29 I INSPDATE ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 UTILI IJTIL2 CRLEN CRWIO CEG BEGT ENDT PDIA PTYPE CAL LI

.. . . . .+ . . . . . . . . + . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .+ . . . + . . . . . . . . . . ÷ . . . . . .+ . . . . . +--

2012/10/01 41 14 .09 0 PCT 6 P2 FB5 -1.61 WAR TEC .560 ZBAZC 67 Cl TEC .560 ZBAZC 69 CI 2012/10/01 67 44 .12 0 PCT 6 P2 FB4 1.59 WAR TEN TEC .560 ZBAZC 55 Cf 2012/10/01 52 45 .09 0 PCT 5 P2 FB4 .73 WAR TEN TEC .560 ZBAZC 55 Cl 2012/10101 68 49 .13 0 PCT 9 P2 FB5 -. 60 WAR TEN TEC .560 ZBAZC 57 Cf 2012/10/01 47 50 .17 0 PCT 14 P2 FB4 .55 WAR TEN TEC .560 ZBAZC 57 CI 2012/10/01 58 51 .09 0 PCT 7 P2 FB4 -1.04 WAR TEN TEC .560 ZBAZC 55 Cf 2012/10/01 63 52 .11 0 PCT 7 P2 FB5 -. 78 WAR TEN TEC .560 ZBAZC 55 Cf 2012/10/01 68 53 .08 0 PCT 5 P2 FB4 1.21 WAR TEN TEC .560 ZBAZC 55 CI 2012/10/01 65 54 .09 0 PCT 5 P2 FP5 .77 WAR TEN TEC .560 ZBAZC 57 Cf 2012/10/01 50 55 .09 0 PCT 7 P2 F84 .84 WAR TEN TEC .560 Z8AZC 51 CI 2012/10/01 93 58 .13 0 PCT 6 P2 F84 1.29 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 63 60 .06 0 PCT 3 P2 FB5 .73 WAR TEN TEC .560 2BAZC 51 Cf 2012/10/01 56 61 .16 0 PCT 7 P2 FB5 1.43 WAR TEH TEC .560 ZBAZC 5 Cl 2012/10/01 82 61 .13 0 PCT 6 P2 FB4 -1.51 WAR TEN TEC .560 ZBAZC 51 Cf 2012/10/01 82 61 .15 0 PCT 7 P2 FB5 -1.54 WAR TEN TEC .560 Z8AZC 51 CI 2012/10/01 90 61 .33 0 PCT 14 P2 FB4 -. 99 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 68 63 .13 0 PCT 9 P2 FB5 -1.62 WAR TEH TEC .560 Z8AZC 53 Cf 2012/10/01 61 64 .08 0 PCT 5 P2 FB4 -1.75 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 71 64 .14 0 PCT 10 P2 FB5 1.31 WAR TEN TEC .660 ZBAZC 53 CI 2012/10/01 81 64 .29 0 PCT 17 P2 FB4 1.31 WAR TEN TEC .560 ZBAZC 51 Cl 2012/10/S1 86 65 .11 0 PCT 5 P2 FB5 -. 60 WAR TEN TEC .560 ZBAZC 51 CI 2012/10/01 57 66 .11 0 PCT 5 P2 FB4 1.36 WAR TEN TEC .560 ZBAZC 51 Cf 2012/10/01 75 66 .12 0 PCT 5 P2 FB4 -1.13 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 54 67 .10 0 PCT 7 P2 FB4 -1.65 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 78 67 .09 0 PCT 7 P2 FB5 -. 81 WAR TEN TEC .560 Z8AZC 53 CI 2012/10/01 80 67 .61 0 PCT 27 P2 FB5 1.33 WAR TEN TEC .560 ZBAZC 53 Cf 2012/10/01 75 68 .09 0 PCT 6 P2 FB5 -. 84 WAR TEN TEC .560 ZBAZC 51 CI 2012/10/01 58 69 .13 0 PCT 6 P2 FB3 1.28 WAR TEN TEC .560 ZBAZC 45 Cf 2012/10/01 104 69 .11 0 PCT 8 P2 FB4 1.46 WAR TEN I TEC .560 ZBAZC 45 CI 2012/10/01 106 69 .13 0 PCT 9 P2 FB4 -1.43 WAR TEN TEC .560 Z8AZC 451 Cf TEC .560 ZBAZC 53 Cf 2012/10/01 62 71 .11 0 PCT 8 P2 FB4 -. 97 WAR TEN 2012/10/01 109 72 .81 68 PCT 27 P43 TSH .27 LPI .23 .31 51 01H TEN .560 ZYAOP 20 Hf 2012/10/01 109 72 .91 54 PCT 28 P46 TSI .39 LPI .38 .34 56 01H TEN .560 ZYAIP 20 Hf 2012/10/01 109 72 .49 109 SVI 3 TSH .19 TSH TON .560 ZRO3C 36 Nf 2012/10/01 109 72 .62 107 SVI 3 TSH .25 TSH TON .560 ZRO3C 36 Hf I

TEC .560 Z8AZC 51 Cf 2012/10/01 113 72 .22 80 PCT 14 P42 TSH 13.88 SSV .32 .40 66 0I1 I TEC .560 ZBAZC 51 CI 2012/10/01 58 73 .11 0 PCT 5 P2 FB4 -. 65 WAR TEN TEC .560 ZBAZC 51 Cf 2012/10/01 72 73 .21 0 PCT 14 P2 FB4 -. 80 WAR TEN TEN .560 ZYAIP 20 Hf TEC .560 ZBAZC 51 CfI 2012/10/01 92 73 .23 0 PCT 14 P2 FB5 -1.17 WAR TEN TEC .560 ZBAZC 20 HI TEC .560 Z8AZC 43 Cf TEC .560 ZBAZC 51 Cf 2012/10/01 102 73 .15 0 PCT 10 P2 FB4 -1.26 WAR TEH TSC .560 ZBAZC 36 HI 2012/10/01 102 73 .20 0 PCT 12 P2 FB5 -1.16 WAR TEN TEC .560 Z8AZC 45 CfI TEC TEC .560

.560 ZBAZC ZYAXC 45 18 Cf 2012/10/01 112 73 .24 46 PCT 5 P43 TSH 13.88 .24 .37 61 018 HI I

I TEC TEC .560

.560 ZBAZC ZBAZC 45 451 Cf CI 2012/10/01 54 75 .16 0 PCT 7 P2 FB4 1.02 WAR TEN I TEC TEC .560 ZBAZC 453 Cl Cf 2012/10/01 108 75 .07 0 PCT 5 P2 FB4 -1.69 WAR TEN TEC .560 ZBAZC 43 CfI TEC .560 ZBAZC 45 Cl 2012/10/01 87 76 .13 0 PCT 8 P2 FB4 1.30 WAR TEN I TEC .560 ZBAZC 45 Cl 2012/10/01 89 76 .13 0 PCT 8 P2 FB4 1.70 WAR TEN TEC .560 ZBAZC 45 Cl 2012/10/01 95 76 .14 0 PCT 9 P2 FB3 1.54 WAR TEN I 2012/10/01 95 76 .15 0 PCT 9 P2 FB4 -. 75 WAR TEN TEC .560 ZYAZC 20 HI I

2012/10/01 115 76 .21 0 PCT 12 P2 FB3 1.74 WAR TEN TEC .560 ZBAZC 451 Cl 2012/10/01 115 76 .23 0 PCT 13 P2 FB4 .53 WAR TEN I TEC .560 ZBAZC 43 Cl 2012/10/01 48 77 .13 0 PCT 9 P2 FB5 1.42 WAR TEN I 2012/10/01 102 77 .30 0 PCT 16 P2 FB3 .73 WAR TEH 2012/10/01 110 77 .14 0 PCT 9 P2 FB3 .75 WAR TEN 2012/10/01 79 78 .13 0 PCT 9 P2 FB5 1.30 WAR TEN 2012/10101 101 78 .14 0 PCT 9 P2 FB6 .71 WAR TEN 2012/10/01 105 78 .24 0 PCT 14 P2 FB4 1.60 WAR TEN

+..--------- --------------... ---- -------------- +-...

I INSPDATE ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL Lf

+ . . . . . . . .. . + . .. + .. . + . . .. . . . . + . . . + .. . + . .. . . . . . + ... + -- -- --. .- - - - - --. - - -- -- --- --- --- ---- -- --- --- --- -- ----- .- ---- . . .---

+ .- .---

.+ -

ST Max

SG - C Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:49: 29

- ---+

I INSPDATE ROW COL ViOLTS DEG IND PER CNN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI


-+ .- -. - . -.. ---.. . -+-... -+..

+ .--- . . .-----.

.+

2012110101 107 78 .15 0 PCT 10 P2 FB3 1.76 WAR TEN TEC .560 ZBAZC 45 Cl 2012110/01 115 78 .21 0 PCT 13 P2 FB5 1.44 WAR TEH TEC .560 ZBAZC 45 CI

. 560 Z8AZC 47 C1 2012/10101 58 79 .18 0 PCT 10 P2 FB5 1.65 WAR TEN TEC

.560 ZBAZC 47 Cl 2012/10/01 80 79 .25 0 PCT 12 P2 FB4 -1.65 WAR TEN TEC

.560 ZBAZC 47 C1 2012/10/01 82 79 .18 0 PCT 10 P2 FP4 -1.55 WAR TE8 TEC

.560 ZBAZC 47 Cl 2012/10/01 86 79 .26 0 PCT 13 P2 FB4 -1.68 WAR TEH TEC

. 560 ZBAZC 43 C1 2012/10/01 92 79 .48 0 PCT 20 P2 FB4 -1.43 WAR TEN TEC

.560 ZBAZC 43 CI 2012/10/01 110 79 .14 0 PCT 9 P2 FB7 .39 WAR TEN TEC

.560 ZBAZC 47 Cl 2012/10/01 61 80 .20 0 PCT 10 P2 FB5 -1.06 WAR TEN TEC

.560 ZBAZC 47 Cl 2012110/01 89 80 .18 0 PCT 10 P2 FB4 1.42 WAR TEN TEC 560 Z8AZC 43 C1 2012/10/01 93 80 .18 0 PCT 10 P2 FB7 1.95 WAR TEN TEC

.560 ZBAZC 43 Cl 2012/10/01 101 80 .27 0 PCT 15 P2 FB4 1.04 WAR TEN TEC 560 ZBAZC 43 CI 2012/10/01 107 80 .16 0 PCT 10 P2 FB7 1.83 WAR TEN TEC

.560 ZBAZC 43 Cl 2012/10/01 111 80 .06 0 PCT 5 P2 FB4 -1.50 WAR TEN TEC .560 ZBAZC 43 C1 2012110101 111 80 .10 0 PCT 7 P2 FB4 1.22 WAR TEN TEC

.560 ZBAZC 49 Cl 2012/10/01 76 81 .29 0 PCT 17 P2 FB4 -1.45 WAR TEN TEC

.560 ZBAZC 49 C1 2012/10/01 57 82 .09 0 PCT 7 P2 FB3 -1.46 WAR TEN TEC

.560 ZBAZC 46 CI 2012/10/01 107 82 .17 0 PCT 11 P2 FB4 -. 78 WAR TEN TEC

.560 ZBAZC 47 C1 2012/10101 84 83 .26 0 PCT 12 P2 F85 .61 WAR TEN TEC

.560 ZBAZC 43 Cl 2012/10/01 96 83 .17 0 PCT 10 P2 FB5 -1.56 WAR TEN TEC

.560 ZBAZC 43 C1 2012/10/01 114 83 .13 0 PCT 8 P2 FB4 -1.59 WAR TEN TEC

.560 ZBAZC 49 Cl 2012/10/01 73 84 .24 0 PCT 15 P2 FB5 1.09 WAR TEN TEC

. 560 ZBAZC 43 C1 2012/10/01 91 84 .12 0 PCT 7 P2 F86 .57 WAR TEN TEC

.560 ZBAZC 43 Cl 2012/10/01 105 84 .19 0 PCT 12 P2 FB4 1.16 WAR TEN TEC

.560 ZBAZC 49 Cl 2012/10/01 68 85 .24 0 PCT 14 P2 FB5 .98 WAR TEN TEC

.560 ZBAZC 49 Cl 2012/10/01 78 85 .24 0 PCT 14 P2 FB5 1.41 WAR TEN TEC

.560 ZBAZC 49 CI 2012/10/01 82 85 .11 0 PCT 8 P2 FB5 -. 83 WAR TEN TEC

.560 ZBAZC 45 CI 2012/10/01 88 85 .27 0 PCT 15 P2 FB4 -1.13 WAR TEN TEC

. 560 ZBAZC 45 C1 2012/10/01 98 85 .33 0 PCT 17 P2 FB5 -1.31 WAR TEN TEC

.560 ZBAZC 49 Cl 2012/10/01 51 86 .15 0 PCT 10 P2 FB4 -1.69 WAR TEN TEC

.560 ZBAZC 73 Cl 2012/10/01 99 86 .31 0 PCT 19 P2 FB4 .50 WAR TEN TEC

. 560 ZBAZC 43 C1 2012/10/01 94 87 .27 0 PCT 14 P2 FP5 1.64 WAR TEN TEC

.560 ZBAZC 47 Cl 2012/10/01 71 88 .34 0 PCT 17 P2 FB5 1.73 WAR TEN TEC . .. . .. . +. .+ . . . . . .-

.560 ZBAZC 47 Cl 2012/10/01 86 89 .11 0 PCT 6 P2 FB4 1.52 WAR TEN TEC

.560 ZBAZC 47 Cl 2012/10/01 67 90 .16 0 PCT 9 P2 FB4 1.25 WAR TEN TEC

. 560 ZBAZC 29 Cl 2012/10/01 110 91 .38 0 PCT 19 P2 FB4 1.31 WAR TEN TEC

.560 ZBAZC 45 CI 2012/10/01 53 94 .17 0 PCT 11 P2 FB5 1.68 WAR TEN TEC

.560 ZBAZC 29 CI 2012/10/01 99 100 .25 0 PCT 15 P2 FB4 .94 WAR TEN TEC

. - - - .- .- .- - - - I..- - - -- . . o+ . . . . + . . . . . . . . + . . .

- - - - - - - - -- - - - -- - - - --÷ .- - .- .---.

+ ...... ÷--

P.IA PTYPE CAL LI I INSPDATE ROW COL VOLTS DEG IND PER CNN LOCN INCHI INCH2 UTILl LITIL2 CRLEN CRWID CEGBEGT ENDT

÷ . . . . . . . . . . + . . . + .. . . . . . . . . . . + . . . .+ . . . . + . . . + . . . + . . . .+ .. . . . . . . + . . . . . . . . + . . . . . . . . I . . .. . .-- - - -. - - - I..

+.-- +

Tubes: 86 Records: 94 ST Mc

SG - D Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:51:10

. . . . .- . . . . +-.

.- . . . .- - -+-

I INSPDATE ROW COL VOLTS DEG IND PER CNN LOCN INCH1 INCH2 UTILl LiTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI

-2012/10/01. + --- W R-2012/10/01 50 50 23 .12 PCT P2 CBC .84 WAR TEN TEC .560 ZBAZC 23 C0 2012/10/01 85 30 .06 PCT P2 FB1 .79 WAR TEN TEC .560 ZBAZC 25 C0 2012/10/01 32 35 .25 PCT P2 07C -1.75 WAR TEN TEC .560 ZBAZC 19 C0 2012/10/01 88 37 .12 PCT P2 F85 .68 WAR TEN TEC .560 ZBAZC 25 C0 2012/10/01 103 48 .12 PCT P2 FB4 .74 WAR TEN TEC .560 ZBAZC 31 C0 2012/10/01 106 53 .22 PCT P2 FB4 1.23 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 97 54 .20 PCT P2 FB3 -1.23 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 94 55 .16 PCT P2 FB4 1.26 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 70 57 ,17 PCT P2 FB5 .60 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 61 58 .09 PCT P2 FB4 -1.18 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 73 60 .15 PCT P2 FB4 -1.93 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 75 60 .13 PCT P2 FB4 -. 85 WAR TEN TEC .560 ZBAZC 35 Cl 2012/10/01 109 60 .14 PCT P2 FB7 .75 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 90 61 .20 PCT P2 FB4 1.22 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 92 61 .18 PCT P2 FB4 1.22 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 92 61 ,11 PCT P2 FB7 -1.87 WAR TEN TEC .560 ZBAZC 33 Cl 1

2012/10/01 98 61 .16 PCT P2 FB7 1.85 WAR TEN TEC .560 ZBAZC 33 C0 1

2012/10/01 100 61 .22 PCT P2 FB5 1.64 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 100 61 .22 PCT P2 FB7 1.77 WAR TEN TEC .560 ZBAZC 33 C0 1

2012/10/01 106 61 .21 PCT P2 FB6 -1.89 WAR TEN TEC .560 ZBAZC 33 C0 1

2012/10/01 75 62 .16 PCT P2 FB4 -1.83 WAR TEN TEC .560 ZBAZC 33 C0 1

2012/10/01 99 62 .16 PCT P2 FB4 -. 73 WAR TEN TEC .560 ZBAZC 33 CQ 2012/10/01 99 62 .50 PCT P2 FB5 -1.20 WAR TEN TEC .560 ZBAZC 33 C0 2012/10/01 105 62 .36 PCT P2 FB5 -1.14 WAR TEN TEC .560 ZBAZC 33 C0 1

2012/10/01 116 63 .22 PCT P2 FB7 -. 42 WAR TEN TEC .560 ZBAZC 35 Cj 1

2012/10/01 97 64 .22 PCT P2 FB5 1.02 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 97 64 .14 PCT P2 FB7 .67 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 61 66 .17 PCT P2 FB5 1.62 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 93 66' .33 PCT P2 FB5 -. 68 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 70 67 .15 PCT P2 FB5 .57 WAR TEN TEC .560 ZBAZC 35 C0 2012/10/01 76 67 .25 PCT P2 FB5 -1. 11 WAR TEN TEC .560 ZBAZC 35 C1 2012/10/01 33 68 .11 PCT P2 FB5 -. 86 WAR TEN TEC .560 ZBAZC 35 C1 2012/10/01 95 68 .16 PCT P2 FB5 1.56 WAR TEN TEC .560 ZBAZC 39 Cj 2012/10/01 101 68 .15 PCT P2 FB6 1.87 WAR TEN TEC .560 ZBAZC 39 C0 2012/10/01 111 68 .15 PCT P2 FB3 -. 88 WAR TEN TEC .560 ZBAZC 39 Cj 2012/10/01 111 68 .17 PCT P2 FB4 - .78 WAR TEN TEC .560 ZBAZC 39 C0 2012/10/01 111 68 .16 PCT P2 FB5 1.78 WAR TEN TEC .560 ZBAZC 39 C0 1

2012/10/01 100 69 .38 PCT P2 FB6 .72 WAR TEN TEC .560 ZBAZC 37 C1 1

2012/10/01 106 69 .18 PCT P2 FB3 1.80 WAR TEN TEC .560 Z8AZC 37 C0 1

2012/10/01 108 69 .21 PCT P2 FB3 1.83 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 108 69 .66 PCT P2 FB4 1.34 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 108 69 .16 PCT P2 FB5 - .82 WAR TEN TEC .560 ZBAZC 37 C1 1

2012/10/01 53 70 .09 PCT P2 FB4 -. 94 WAR TEN TEC .560 ZBAZC 37 C0 1

2012/10/01 83 72 .25 PCT P2 FB5 - .50 WAR TEN TEC .560 ZBAZC 39 C0 1

2012/10/01 85 72 .38 PCT P2 F85 - .06 WAR TEN TEC .560 ZBAZC 39 C1 2012/10/01 85 72 .15 PCT P2 FB6 .10 WAR TEN TEC .560 ZBAZC 39 C0 2012/10/01 84 73 .24 PCT P2 FB5 1.04 WAR TEN TEC .560 ZBAZC 37 C1 2012/10/01 96 73 .05 PCT P2 F85 -1,90 WAR TEN TEC .560 ZBAZC 37 Cl 2012/10/01 112 73 .21 PCT P2 F84 - .93 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 97 74 .12 PCT P2 FB5 .94 WAR TEN TEC .560 ZBAZC 37 Ci 2012/10/01 107 74 .33 PCT P2 FB4 - . 94 WAR TEN TEC .560 ZBAZC 37 C0 2012/10/01 62 75 .10 PCT P2 FB3 -1.95 WAR TEN TEC .560 ZBAZC 39 Cl 2012/10/01 90 75 .20 PCT P2 FB4 .00 WAR TEN TEC .560 ZBAZC 39 C0 2012/10/01 90 75 .23 PCT P2 FB5 .21 WAR TEN TEC .560 ZBAZC 39 Cl 2012/10/01 90 75 .21 PCT P2 FB6 ,62 WAR TEN TEC .560 ZBAZC 39 Cl 1

2012/10/01 73 76 .10 PCT P2 F84 .00 WAR TEN TEC .560 ZBAZC 39 Cl

.560 ZBAZC 39 Cl I

2012/10/01 101 76 ,17 PCT P2 FB2 -. 75 WAR TEN TEC 1

2012110101 ,90 77 .18 PCT P2 FB4 -1.27 WAR TEN TEC .560 ZBAZC 59 Cl I

I INSPDATE ROW COL VOLTS DEG IND PER C0N LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI ST Max

SG - D Service Induced Indications McGuire 2 2EOC21 MNS 20121001 01/22/2013 11:51:10 I INSPOATE ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL LI 0_+ PCT.

2012/10101 73 78 .28 0 PCT 12 P2 FB5 .69 WAR TEH TEC .560 ZBAZC 59 CI 2012/10/01 97 80 .09 0 PCT 5 P2 FB4 1.57 WAR TEH TEC .560 ZBAZC 59 CI 2012110101 66 81 . 13 0 PCT 7 P2 FB4 -1.05 WAR TEH TEC .560 ZBAZC 61 CI 2012/10/01 69 82 . 12 0 PCT 7 P2 FB5 .73 WAR TEH TEC .560 ZBAZC 61 CI 2012/10/01 83 - 82 .30 0 PCT 12 P2 FB3 1.72 WAR TEH TEC .560 ZBAZC 61 Cl 2012/18/01 80 83 . 14 0 PCT 7 P2 FB4 -1.64 WAR TEH TEC .560 ZBAZC 59 CI 2012/10/01 82 83 .21 0 PCT 10 P2 FB4 -1.88 WAR TEH TEC .560 ZBAZC 59 CI 2012/10/01 61 84 .29 0 PCT 13 P2 FB4 - .63 WAR TEH TEC .560 ZBAZC 59 CI 2012/18/01 75 84 .18 0 PCT 9 P2 FB5 .00 WAR TEH TEC .560 ZBAZC 59 Cl 2012/10/01 72 87 .17 0 PCT 8 P2 FB5 1.70 WAR TEH TEC .560 ZBAZC 59 CI 2012/10/01 90 87 .22 0 PCT 11 P2 F84 1.89 WAR TEH TEC .560 ZBAZC 59 CI 2012110101 55 88 .19 8 PCT 9 P2 FB4 1.22 WAR TEH TEC .560 ZBAZC 61 CI 2012/10/01 67 88 .13 0 PCT 7 P2 FB5 .67 WAR TEH TEC .560 ZBAZC 59 CI 2012/18/01 71 88 .17 0 PCT 8 P2 FB5 .73 WAR TEH TEC .560 ZBAZC 59 CI 2012/10/01 45 90 .11 0 PCT 5 P2 FB5 -1,60 WAR TEH TEC .560 ZBAZC 65 CI 2012/10801 71 90 .19 0 PCT 10 P2 FB5 .76 WAR TEH TEC .560 ZBAZC 61 CI 2012/10801 73 90 .13 0 PCT 6 P2 FB5 1.05 WAR TEH TEC .560 ZBAZC 61 CI 2012/10101 57 92 .10 0 PCT 5 P2 FB5 -1.09 WAR TEH TEC .560 ZBAZC 63 CI 2012/10/01 50 99 .12 0 PCT 6 P2 FB4 1.59 WAR TEH TEC .560 ZBAZC 63 CI I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTILI UTIL2 CRLEN CRWID CEO BEGT ENDT PDIA PTYPE CAL LI

÷ .... ÷- -+ .... +-

- --..- ..- I. -

Tubes: 66 Records: 77 ST Max