MONTHYEARNG-11-0320, Fourth 10-Year Inservice Inspection Plan2011-08-31031 August 2011 Fourth 10-Year Inservice Inspection Plan Project stage: Request ML11285A0022011-10-0707 October 2011 NRR E-mail Capture - ME7246 - Duane Arnold - Action to Approve Relief Requests NDE-R003, -R010, -R011, -R014, -R015- Acceptance Review Decision Project stage: Acceptance Review ML12107A0592012-04-11011 April 2012 NRR E-mail Capture - ME7246 - DAEC - Request for Additional Information (RAI) Relief Requests NDR-R003, R010, R011, R014, R015 Project stage: RAI ML12115A0722012-04-19019 April 2012 NRR E-mail Capture - ME7246 - DAEC - (Raii Cumb-001,-002) Re NDR-R003, R010, R011, R014, R015. - Request Clarification Call Project stage: Other ML12339A0422012-12-0303 December 2012 NRR E-mail Capture - FW: ME7246 - DAEC - Fourth 10-year Inservice Inspection Plan (Ltr NG-11-0320) - Request for Additional Information Project stage: RAI NG-12-0489, Response to NRC Requests for Additional Information Regarding the Fourth 10-Year Inservice Inspection Plan2012-12-21021 December 2012 Response to NRC Requests for Additional Information Regarding the Fourth 10-Year Inservice Inspection Plan Project stage: Response to RAI ML13051A0492013-02-19019 February 2013 NRR E-mail Capture - ME7246 - DA RR Ltr and SE - Nature of Desired Email Message Project stage: Other ML13051A2662013-03-0101 March 2013 Reliefs from the Requirements of the ASME Boiler and Pressure Vessel Code for the Fourth 10-Year Inservice Inspection Interval Project stage: Acceptance Review 2012-12-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 2024-09-04
[Table view] |
Text
NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Tuesday, February 19, 2013 3:12 PM To: Browning, Tony Cc: Feintuch, Karl
Subject:
RE: ME7246 - DA RR Ltr and SE - nature of desired email message In a related activity I faxed you a draft table to be included in our forthcoming correspondence that will contain references to the ADAMS Accession Numbers, associated TAC Numbers, and dates for issuance of each affected Relief Request as well as a description of each requested action. In addition, at the bottom of the table will be a footnote referring to NDE-R009 that explains the roles of TAC Numbers MD3177 and MD8192:
- TAC MD3177 for NDE-R009 was established for relief action requested by the licensees letter dated 9/29/06 (ADAMS Accession No. ML062780201). By letter dated 3/20/07 (ML070890363), the licensee withdrew its request, and TAC MD3177 was closed. Approximately one year later by letter dated 3/28/08 (ML062780201), the licensee requested the action again. TAC MD8192 was opened to process the application. By letter dated 10/3/08 (ML082480680), the NRC authorized the action.
You acknowledged the accuracy of the footnote with the following message:
From: Browning, Tony [1]
Sent: Tuesday, February 19, 2013 12:26 PM To: Feintuch, Karl Cc: Byrne, Thomas
Subject:
Fax'ed Footnote Tom[Byrne] and I looked it over and we're OK with it.
Thanks.
tb [Tony Browning]
This exchange of messages completes the effort to record a mutual understanding of the roles of TACs MD3177 and MD8192 in the approval of NDE-R009 as described in the footnote.
From: Feintuch, Karl Sent: Tuesday, February 19, 2013 1:45 PM To: 'Browning, Tony'
Subject:
ME7246 - DA RR Ltr and SE - nature of desired email message In our discussion on 2/15/2013, we compared information describing the background to your Relief Request NDE-R009.
The NRC had records corresponding to TAC MD3177, which ended with a withdrawal and thus no relief action occurred.
In addition approximately one year later you applied for relief action again, which became MD8192 and resulted in a relief action. It is this linking of both TACs MD3177 and specifically MD8192 to NDE-R009, which would justify a time extension for NDE-R009.
The specific citation that your email message would support would be (italicized here for emphasis):
By letter dated August 31, 2011 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML11245A240, as supplemented by letter dated December 21, 2012 (ADAMS Accession No. ML12356A185) and an email message dated February nn, 2013 (ADAMS Accession No. MLnnnnnnnnn), NextEra Energy Duane Arnold, LLC (hereinafter referred to as the licensee) submitted a Fourth (4th) 10-Year Inservice Inspection (ISI) Plan[1] for the Duane Arnold Energy Center (DAEC), which contained fifteen (15) previously approved relief requests (listed in Enclosure 1),
1
among which the licensee requested a time extension to a full 10 years of effectiveness from February 21, 2014 to October 31, 2016, as described in a table shown in Enclosure 1.
In its supplements dated December 21, 2012 and February nn, 2013, the licensee clarified the needed actions at this time since the status of some of the requested reliefs described in its application letter dated August 31, 2011 had evolved. The table in Enclosure 1 is in response to the licensees table in Section H, Page 1 of 100, of its letter dated August 31, 2011, as revised by the table in its letter dated December 21, 2012, and additional information provided for Relief Request NDE-R009 in its email message dated February nn, 2013.
I seek an appropriate email message as soon in February as practical to obtain the needed ADAMS Accession No. for the letter to you that is being prepared.
Please contact me as needed if there are any questions. You may respond as a reply to this message, which I will place in ADAMS to obtain the needed ML number.
Karl Feintuch 301-415-3079, forwards to my cell phone
[1]
The DAEC fourth 10-year ISI plan was scheduled to end with the expiration of the original operating license on February 21, 2014.
On December 16, 2010, the DAEC operating license was extended to February 21, 2034. Consequently, the licensee requested that the current fourth 10-year ISI interval for DAEC be extended for the full 10-year period, extending the end of the fourth 10-year ISI interval to October 31, 2016.
2
Hearing Identifier: NRR_PMDA Email Number: 614 Mail Envelope Properties (Karl.Feintuch@nrc.gov20130219151100)
Subject:
RE: ME7246 - DA RR Ltr and SE - nature of desired email message Sent Date: 2/19/2013 3:11:44 PM Received Date: 2/19/2013 3:11:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
"Feintuch, Karl" <Karl.Feintuch@nrc.gov>
Tracking Status: None "Browning, Tony" <Tony.Browning@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4482 2/19/2013 3:11:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: