MONTHYEARNG-11-0320, Fourth 10-Year Inservice Inspection Plan2011-08-31031 August 2011 Fourth 10-Year Inservice Inspection Plan Project stage: Request ML11285A0022011-10-0707 October 2011 NRR E-mail Capture - ME7246 - Duane Arnold - Action to Approve Relief Requests NDE-R003, -R010, -R011, -R014, -R015- Acceptance Review Decision Project stage: Acceptance Review ML12107A0592012-04-11011 April 2012 NRR E-mail Capture - ME7246 - DAEC - Request for Additional Information (RAI) Relief Requests NDR-R003, R010, R011, R014, R015 Project stage: RAI ML12115A0722012-04-19019 April 2012 NRR E-mail Capture - ME7246 - DAEC - (Raii Cumb-001,-002) Re NDR-R003, R010, R011, R014, R015. - Request Clarification Call Project stage: Other ML12339A0422012-12-0303 December 2012 NRR E-mail Capture - FW: ME7246 - DAEC - Fourth 10-year Inservice Inspection Plan (Ltr NG-11-0320) - Request for Additional Information Project stage: RAI NG-12-0489, Response to NRC Requests for Additional Information Regarding the Fourth 10-Year Inservice Inspection Plan2012-12-21021 December 2012 Response to NRC Requests for Additional Information Regarding the Fourth 10-Year Inservice Inspection Plan Project stage: Response to RAI ML13051A0492013-02-19019 February 2013 NRR E-mail Capture - ME7246 - DA RR Ltr and SE - Nature of Desired Email Message Project stage: Other ML13051A2662013-03-0101 March 2013 Reliefs from the Requirements of the ASME Boiler and Pressure Vessel Code for the Fourth 10-Year Inservice Inspection Interval Project stage: Acceptance Review 2012-12-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML22067A0922022-03-0303 March 2022 State Consultation - Duane Arnold ISFSI-Only EP License Amendment ML22040A1162022-02-0808 February 2022 Email to G. Van Noordennen Zion and La Crosse Review Schedule Changes ML22027A3582022-01-26026 January 2022 DAEC: CY2022 Inspection Plan, Docket No: 05000331, License No: DPR-49 ML22007A3102022-01-0505 January 2022 State Consultation - Draft No Significant Hazards Determination Regarding a LAR for NextEra Energy Duane Arnold, LLC, Duane Arnold Energy Center ISFSI in Palo, Iowa ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML22005A0992022-01-0404 January 2022 Email from a Snyder to a Leek Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo, Iowa ML22005A1012022-01-0404 January 2022 Email from a Leek to a Snyder Re State Consultation - Draft No Significant Hazards Determination - License Amend. Req. for NextEra Energy, LLC, DAEC ISFSI in Palo Iowa ML22004A0122022-01-0303 January 2022 E-mail from M. Davis, NextEra, to A. Snyder, NRC, - Duane Arnold Energy Center - Supplement Information to Technical Specification Amendment Application ML21354A6722021-12-17017 December 2021 Email to State of Iowa - Draft EA on Duane Arnold Exemption ML21214A0482021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Emergency Plan ML21214A0502021-08-0101 August 2021 Acceptance of License Amendment Request to Adopt an ISFSI-Only Physical Security Plan ML21165A1212021-06-10010 June 2021 E-mail from M. Davis, Duane Arnold, to M. Doell and R. Edwards, NRC - Duane Arnold Defueled Emergency Plan Implementation Confirmation ML21117A2752021-04-26026 April 2021 Acceptance of Updated Spent Fuel Management Plan ML21089A2092021-03-19019 March 2021 Spent Fuel Pattern Procedure ML21068A3352021-03-0707 March 2021 Acceptance of License Amendment Request to Adopt ISFSI-Only Technical Specifications ML21056A2172021-02-17017 February 2021 Acceptance of License Amendment Request to Revise the Physical Security Plan Requirements ML21032A1852021-02-0101 February 2021 Daec_ CY2021 Inspection Plan ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20338A0032020-12-0101 December 2020 Letter from EPRI to Mr. Scott Wall, BWRVIP 2020-100, 288 Surveillance Capsule Test Results Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20289A3522020-10-14014 October 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Requested Licensing Action, One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic (EPID No. L-2020-LLE-01 ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20154K6202020-05-27027 May 2020 COVID-19 Preparedness Assessments for FEMA Region VII Duane Arnold Energy Center (DAEC) and Quad Cities Generating Station (Qcgs) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20129J8282020-05-0606 May 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from Portions of 10 CFR 50.47 and Appendix E - EPID L-2020-LLE-0023 ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20122A1152020-04-30030 April 2020 NRR E-mail Capture - Duane Arnold Energy Center -Acceptance of Post-Shutdown Decommissioning Activities Report ML20087F2872020-03-26026 March 2020 NRR E-mail Capture - LIC-109 Acceptance Review of Duane Arnold Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML20129J8322020-03-19019 March 2020 NRR E-mail Capture - (External_Sender) Teleconference with Nextra Energy - Duane Arnold Physical Security Plan LIC-109 Review Status ML20022A3602020-01-22022 January 2020 NRR E-mail Capture - Duane Arnold Energy Center - Acceptance of Requested Licensing Action, Proposed Partial Exemption from Record Retention Requirements ML19352G6872019-12-11011 December 2019 12-11-19 Email to FEMA: Response to FEMA Questions on Proposed DAEC Emergency Plan ML19302G3212019-10-29029 October 2019 LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186) - Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19302G9732019-10-29029 October 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR- 186): Removal of License Condition 2.C.(3), Fire Protection Program - EPID L-2019-LLA-0211 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML19206A2182019-07-25025 July 2019 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-183) - Application to Revise Operating License and TS for Permanently Defueled Condition - EPID L-2019-LLA-0130 ML19183A0172019-06-26026 June 2019 NRR E-mail Capture - LIC-109 Acceptance of Request for Change in the BWRVIP Integrated Surveillance Program Test Schedule to Accommodate Early Closure of the Duane Arnold Energy Center - EPID L-2019-LRO-0042 ML19122A4882019-04-29029 April 2019 NRR E-mail Capture - LIC-109 Acceptance of License Amendment Request (TSCR-182) for Duane Arnold Energy Center (DAEC) - Proposed Changes to the Emergency Plan for Permanently Defueled Condition - EPID L-2019-LLA-0075 ML19086A3502019-03-27027 March 2019 NRR E-mail Capture - LIC-109 Acceptance of the Request for Exemption from 10 CFR 73.55(p)(1)(I) and 10 CFR 73.55(p)(1)(ii) for Duane Arnold Energy Center - EPID L-2019-LLE-0003 ML19064A2032019-03-0404 March 2019 NRR E-mail Capture - Results of LIC-109 Acceptance Review - Duane Arnold Energy Center - Request for Approval of Certified Fuel Handler Training Program, EPID L-2019-LLL-0003 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18108A3102018-04-12012 April 2018 NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML18025A2362018-01-24024 January 2018 NRR E-mail Capture - Resent - LIC-109 Acceptance - Duane Arnold LAR (TSCR-166) - Adoption of Emergency Action Level (EAL) Scheme Pursuant to NEI 99-01, Revision 6, Development of EALs for Non-Passive Reactors ML18023A0752018-01-22022 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amendment Request (LAR) (TSCR-179) - Application to Add Technical Specification 3.2.3, Linear Heat Generation Rate - EPID: L-2017-LLA-0436 ML18019A0732018-01-18018 January 2018 NRR E-mail Capture - LIC-109 Acceptance - Duane Arnold License Amend Request (LAR)(TSCR-178) - Application to Reduce the Required Number of Operable Suppression Chamber-to-Drywell Vacuum Breakers ML17355A0132017-12-20020 December 2017 NRR E-mail Capture - LIC-109 Acceptance of Duane Arnold LAR TSCR-177, Application to Revise Tech Spec to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements - EPID: L-2017-LLA-0385 2023-04-19
[Table view] |
Text
NRR-PMDAPEm Resource From: Feintuch, Karl Sent: Monday, December 03, 2012 1:42 PM To: Browning, Tony
Subject:
FW: ME7246 - DAEC - Fourth 10-year Inservice Inspection Plan (Ltr NG-11-0320) - Request for Additional Information Attachments: ME7246 RAI 2012-11-12-1810.docx I should have an ADAMS accession number for you in about 1-2 days.
From: Feintuch, Karl Sent: Monday, November 12, 2012 6:26 PM To: 'Browning, Tony' Cc: Roman, Cinthya; Bedi, Gurjendra; Tsao, John; Fairbanks, Carolyn; Lupold, Timothy; Feintuch, Karl
Subject:
ME7246 - DAEC - Fourth 10-year Inservice Inspection Plan (Ltr NG-11-0320 - Request for Additional Information DRAFT REQUEST FOR ADDITIONAL INFORMATION NEXTERA ENERGY DUANE ARNOLD ENERGY CENTER FOURTH 10-YEAR INSERVICE INSPECTION PLAN (ME7246)
DOCKET NUMBER 50-331 By letter dated August 31, 2011, (Agencywide Document Access and Management System (ADAMS) accession number ML11245A240) NextEra Energy Duane Arnold LLC (NextEra, the licensee) submitted a set of 15 Relief Requests (RRs) NDE-R001 through NDE-R015, less NDE-R004, among which several actions were requested individually or in combination including: (1) extension of the expiration date of the RR from that of the expiration of the original facility operating license (February 21, 2014) to the planned end of the fourth inservice inspection (ISI) interval (October 31, 2016); (2) request for approval of newly submitted RRs; (3) requests to confirm the approval status of RR submitted earlier; or (4) some combination of (1), (2) and (3)
NRC staff has reviewed and evaluated the information provided by the licensee and has determined that the following information is needed in order to complete its review of the RR.
Please contact Karl Feintuch (301-415-3079) by 11/14/2012 to confirm: (1) that the items are clear to you and to the responsive NextEra staff without further discussion or (2) that a clarifying conference call is needed.
Upon determination that the RAI items are clear and confirmation of when responses to these items are due, these draft RAI items will be considered to be in final form.
The RAI items are assigned the following tracking numbers.
A. ME7246-RAII-DORL-Feintuch-001-2012-11-12 B. ME7246-RAII-DORL-Feintuch-002-2012-11-12 C. ME7246-RAII-DORL-Feintuch-003-2012-11-12 A. ME7246-RAII-DORL-Feintuch-001-2012-11-12 (1) Individually affirm all RRs, among NDE-R001 to NDE-R015, that are to be extended in effect until October 31, 2016. You may do this in the form of a Table similar to that on Section H, page 1 of 100, with the addition of column(s) in which you address each relief request.
(2) Affirm that a time extension was not requested for NDE-R004 and for NDE-R015.
B. ME7246-RAII-DORL-Feintuch-002-2012-11-12 1
NRC staff noted within* your letter dated August 31, 2011, where it appears that the Inservice Inspection Plan ceases to be in effect after February 21, 2014, whereas the relief authorized by NRC staff (approved on 1/31/2007 for NRE-R001, for example) contains no limitation other than being in effect for the entire ten-year interval ending on October 31, 2016.
Please affirm that:
(1) the Inservice Inspection Plan is technically valid for the entire ten-year interval ending on October 31, 2016; (2) all references to the effective dates of the Inservice Inspection Plan have been or will be amended to show that the plan remains in effect until October 31, 2016; and (3) any reference to ending the effectiveness of the Inservice Inspection Plan on February 21, 2014, is attributable to the expiration of the original facility operating license on February 21, 2014, and not a technical limit on the validity of the plan.
- See for example, on Section A, page 1 of 14, Subsection 1.0 (2) first sentence where you state that:
This Inservice Inspection Plan will be effective from November 1, 2006 through and including February 21, 2014, which represents the fourth ten-year interval of the Inservice Inspection Program for DAEC. The interval ends on February 21, 2014 to coincide with the end of the current [original facility operating] license, thus making the interval duration of approximately 99 months as opposed to the standard 120 months.
C. ME7246-RAII-DORL-Feintuch-003-2012-11-12 NDE-R011 requested relief from the ASME Section XI repair requirements for weld overlay repairs for components RRC-F002 and RRF-F002 using Code Cases N-504-2 and N-638-1 as alternatives. This relief was granted for refueling outage RFO-20 in a SE by NRC staff dated June 12, 2007 (ADAMS Accession No. ML071110007) under TAC number MD4466.
Clarify if a time extension is needed for relief request NDE-R011. If a time extension is needed, explain why the time extension is needed given that the weld overlay repairs for components RRC-F002 and RRF-F002 have been completed and the original SE was granted for RFO-20 only.
2
Hearing Identifier: NRR_PMDA Email Number: 550 Mail Envelope Properties (Karl.Feintuch@nrc.gov20121203134200)
Subject:
FW: ME7246 - DAEC - Fourth 10-year Inservice Inspection Plan (Ltr NG-11-0320) - Request for Additional Information Sent Date: 12/3/2012 1:42:15 PM Received Date: 12/3/2012 1:42:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients:
"Browning, Tony" <Tony.Browning@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 4788 12/3/2012 1:42:00 PM ME7246 RAI 2012-11-12-1810.docx 20551 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
DRAFT REQUEST FOR ADDITIONAL INFORMATION NEXTERA ENERGY DUANE ARNOLD ENERGY CENTER FOURTH 10-YEAR INSERVICE INSPECTION PLAN (ME7246)
DOCKET NUMBER 50-331 By letter dated August 31, 2011, (Agencywide Document Access and Management System (ADAMS) accession number ML11245A240) NextEra Energy Duane Arnold LLC (NextEra, the licensee) submitted a set of 15 Relief Requests (RRs) NDE-R001 through NDE-R015, less NDE-R004, among which several actions were requested individually or in combination including: (1) extension of the expiration date of the RR from that of the expiration of the original facility operating license (February 21, 2014) to the planned end of the fourth inservice inspection (ISI) interval (October 31, 2016); (2) request for approval of newly submitted RRs; (3) requests to confirm the approval status of RR submitted earlier; or (4) some combination of (1),
(2) and (3)
NRC staff has reviewed and evaluated the information provided by the licensee and has determined that the following information is needed in order to complete its review of the RR.
Please contact Karl Feintuch (301-415-3079) by 11/14/2012 to confirm: (1) that the items are clear to you and to the responsive NextEra staff without further discussion or (2) that a clarifying conference call is needed. Upon determination that the RAI items are clear and confirmation of when responses to these items are due, these draft RAI items will be considered to be in final form.
The RAI items are assigned the following tracking numbers.
A. ME7246-RAII-DORL-Feintuch-001-2012-11-12 B. ME7246-RAII-DORL-Feintuch-002-2012-11-12 C. ME7246-RAII-DORL-Feintuch-003-2012-11-12 A. ME7246-RAII-DORL-Feintuch-001-2012-11-12 (1) Individually affirm all RRs, among NDE-R001 to NDE-R015, that are to be extended in effect until October 31, 2016. You may do this in the form of a Table similar to that on Section H, page 1 of 100, with the addition of column(s) in which you address each relief request.
(2) Affirm that a time extension was not requested for NDE-R004 and for NDE-R015.
B. ME7246-RAII-DORL-Feintuch-002-2012-11-12 NRC staff noted within* your letter dated August 31, 2011, where it appears that the Inservice Inspection Plan ceases to be in effect after February 21, 2014, whereas the relief authorized by NRC staff (approved on 1/31/2007 for NRE-R001, for example) contains no limitation other than being in effect for the entire ten-year interval ending on October 31, 2016.
Please affirm that:
(1) the Inservice Inspection Plan is technically valid for the entire ten-year interval ending on October 31, 2016; (2) all references to the effective dates of the Inservice Inspection Plan have been or will be amended to show that the plan remains in effect until October 31, 2016; and
(3) any reference to ending the effectiveness of the Inservice Inspection Plan on February 21, 2014, is attributable to the expiration of the original facility operating license on February 21, 2014, and not a technical limit on the validity of the plan.
- See for example, on Section A, page 1 of 14, Subsection 1.0 (2) first sentence where you state that:
This Inservice Inspection Plan will be effective from November 1, 2006 through and including February 21, 2014, which represents the fourth ten-year interval of the Inservice Inspection Program for DAEC. The interval ends on February 21, 2014 to coincide with the end of the current [original facility operating] license, thus making the interval duration of approximately 99 months as opposed to the standard 120 months.
C. ME7246-RAII-DORL-Feintuch-003-2012-11-12 NDE-R011 requested relief from the ASME Section XI repair requirements for weld overlay repairs for components RRC-F002 and RRF-F002 using Code Cases N-504-2 and N-638-1 as alternatives. This relief was granted for refueling outage RFO-20 in a SE by NRC staff dated June 12, 2007 (ADAMS Accession No. ML071110007) under TAC number MD4466.
Clarify if a time extension is needed for relief request NDE-R011. If a time extension is needed, explain why the time extension is needed given that the weld overlay repairs for components RRC-F002 and RRF-F002 have been completed and the original SE was granted for RFO-20 only.