ML13024A138

From kanterella
Jump to navigation Jump to search
LTR-13-0059 - Don Leichtling and Ace Hoffman E-mail Press Release 13-01-22 Regarding San Onofre Unit 2
ML13024A138
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/20/2013
From: Hoffman A, Leichtling D
The DAB Safety Team
To:
NRC/Chairman
References
LTR-13-0059 Press Release 13-01-22
Download: ML13024A138 (3)


Text

OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Jan 23, 2013 15:28 PAPER NUMBER: LTR- 13-0059 LOGGING DATE: 01/22/2013 ACTION OFFICE:

EDo C4Le AUTHOR: Don LeichtlingI 9jVj6.N AFFILIATION:

ADDRESSEE: Chairman Resource

SUBJECT:

Press Release 13-01-22 regarding San Onofre Unit 2 ACTION: Appropriate DISTRIBUTION: RF, SECY has Ack LETTER DATE: 01/22/2013 ACKNOWLEDGED Yes SPECIAL HANDLING: Lead office to publicly release 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after SECY's assignment, via SECY/EDO/DPC.

NOTES:

FILE LOCATION: ADAMS DATE DUE: DATE SIGNED:

JOosten, Sandy From: Capt.D [captddd@gmail.com]

Sent: Tuesday, January 22, 2013 11:31 AM To: Capt D

Subject:

Press Release 13-01-22 ATHOS Validity Questioned, Qualifying Investigation Required Press Release 13-01-22 Media

Contact:

Don Leichtling (619) 296-9928 or Ace Hoffman (760) 720-7261 The validity of the ATHOS TIH computer model* for San Onofre Unit 2 at Main Steam Line Break (MSLB) conditions requires that the Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulations (NRR) complete a Qualifying Investigation to assure steam generator tube integrity before any restart decision is made by the NRC.

The DAB Safety Team has transmitted the following Problem Statement and Investigation Request to the Chairman of the NRC, Offices Of Nuclear Regulator Regulations and Atomic Safety Licensing Board. NOTE: All the information provided below has been obtained from publicly available documents on the web.

PROBLEM STATEMENT: The EPRI, NRC, Westinghouse, AREVA and MHI ATHOS thermal-hydraulic models cannot account for all the mechanical factors and extremely narrow tube-to-tube clearance differences, which would very likely contribute to catastrophic tube-to-tube wear (fluid elastic instability) in San Onofre Unit 2. In light of the 8 tube failures of Unit 3 at MSLB testing conditions, fluid elastic instability can cause cascading tube leakages/ruptures in Unit 2 even at 70% power due to SG pressure and temperature changes caused by, for example, a main steam line break, earthquake, loss of offsite power, stuck main steam safety valve and/or other operational transients. The cascading tube failures would "pop like popcorn" (as described by SG expert Arnie Gundersen) and cause excessive offsite radiation exposures. Operator Action as claimed by Edison to re-pressurize the steam generators is not feasible to stop a major nuclear accident in Unit 2 in progress in the first 15 minutes of a MSLB, stuck open SG safety valve, earthquake, steam generator tube ruptures and other operational transients during the 5-month trial period.

INVESTIGATION REQUEST: The DAB Safety Team seeks to assist the NRR in making the right decision regarding Public Safety and the validity of the ATHOS T/H Computer Model for SONGS Unit 2 due to extremely low tube-to-tube clearance at 70% power due to SG pressure and temperature changes, steam line break, earthquake, loss of offsite power, stuck main steam safety valve and/or other anticipated or unanticipated operational transients, by requesting a Qualifying Investigation,as noted above and by providing additionalinformation, as noted below.

  • For much more, read DAB Safety Team Documents, "Media Alert 13-01-22 Faulty Modeling And Unreasonable Operator Actions Make San Onofre Restart Unsafe", "Emergency Preparedness at San Onofre", "Managing Control Room Safety" and Press Release:

"TEST: Viability of Operator Actions to Prevent Offsite Radiation Releases Unanticipated operational transient An unanticipated operational transient means a deviation from normal operational conditions, which is not proceduralized and Plant Operator does not recognize that condition. A good example are the so called SONGS Unit 3 false alarm from loose parts vibration monitoring system for which there is no explanation from SCE, NRC or Westinghouse. Another example would be a leakage from a pump pumping radioactive fluid without any area radiation monitors towarn the operators of the leakage.

Normal operational conditions Normal operational conditions mean that the nuclear power plant is operated according to the Technical Specifications and operational procedures. These also include tests, plant start-up and shutdown, maintenance and refuelling.

Anticipated operational transient An anticipated operational transient means a deviation from normal operational conditions, which is milder than an accident and which can be expected to occur once or several times over a period of a hundred operating years.

Accident An accident means such a deviation from normal operational conditions as is not an anticipated operational transient. There are two classes of accident: postulated accidents and severe accidents. Based on the initiating event, postulated accidents are further divided into two sub-classes whose acceptance criteria are described in Guide YVL 6.2.

Postulated accident A postulated accident means such a nuclear power plant safety system design-basis event as the nuclear power plant is required to withstand without any serious damage to the fuel and without discharges of radioactive substances so large that, in the plant's vicinity, 1

exterlsive measures should be taken to limit the radiation exposure of the population.

Glossary of Terminology:

ATHOS: A computer modeling program for predicting thermal hydraulic conditions DAB: DAB Safety Team EPRI: Electric Power Research Institute FEI: Fluid Elastic Instability MHI: Mitsubishi Heavy Industries, manufacturer of the RSGs MSLB: Main Steam Line Break NRC: Nuclear Regulatory Commission NRR: [Office of] Nuclear Reactor Regulations SCE: Southern California Edison SG: Steam Generator SONGS: San Onofre Nuclear [Waste] Generating Station TTW: Tube-to-Tube Wear This press release will be posted on the web at this link: DAB Safety Team Documents.

The DAB Safety Team: Don, Ace and a BATTERY of safety-conscious San Onofre insiders plus industry experts from around the world who wish to remain anonymous. These volunteers assist the DAB Safety Team by sharing knowledge, opinions and insight but are not responsible for the contents of the DAB Safety Team's reports. We continue to work together as a Safety Team to prepare additional DAB Safety Team Documents, which explain in detail why a SONGS restart is unsafe at any power level without a Full/Thorough/Transparent NRC 50.90 License Amendment and Evidentiary Public Hearings. For more information from The DAB Safety Team, please visit the link above.

Our Mission: To prevent a Trillion Dollar Eco-Disaster, like Fukushima, from happening in the USA.

Copyright 22, 2012 by The DAB Safety Team. All rights reserved. This material may not be published, broadcast or redistributed without crediting the DAB Safety Team. The contents cannot be altered without the Written Permission of the DAB Safety Team Leader and/or the DAB Safety Team's Attorneys.

2