IR 05000287-12-013, on 10/09/2012, 11/21/2012, 12/3182012, Errata Oconee Nucleaer Station, Unit 3 - Reactor Protective System/Engineered Safeguards Protective System (Rps/Esps) Digital Modification - U.S. Nuclear Regulatory Commission (ML12
ML13022A362
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/16/2013
From: Nease R
NRC/RGN-II/DRS/EB1
To: Gillespie T
Duke Energy Corp
References
IR-12-013
Download: ML13022A362 (8)


Text

UNITED STATES ary 16, 2013

SUBJECT:

ERRATA OCONEE NUCLEAR STATION UNIT 3 - REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (RPS/ESPS)

DIGITAL MODIFICATION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000287/2012013 (ML12366A264)

Dear Mr. Gillespie:

The purpose of this errata is to correct the completion date of the inspection associated with Inspection Report 05000287/2012013.

The cover letter and Section 4OA6 (report page 12) of the above inspection report incorrectly identify the inspection completion date as October 9, 2012. Due to follow-up in-office inspection review, the correct completion date should be reflected as November 21, 2012. In addition, the team leader conducted follow-up discussion with Oconee licensing staff on December 20, 2012, to inform them that there would be no changes to previous conclusions. Please replace cover letter (dated December 31, 2012) and Section 4OA6 (page 12) of ML12366A264 with the pages enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readingrm/

adams.html (The Public Electronic Reading Room).

T. P. Gillespie, Jr. 2 I apologize for any inconvenience this error may have caused. If you have any questions, please contact me at (404) 997- 4530.

Sincerely,

/RA/

Rebecca L. Nease, Chief Engineering Branch 1 Division of Reactor Safety Docket No.: 50-287 License No.: DPR-55 Enclosure: As stated cc: (See page 3)

_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME WALKER NEASE DATE 1/11/2013 1/16/2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 1/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

T. P. Gillespie, Jr. 3 cc: General Office Thomas D. Ray Duke Energy Corporation Plant Manager Electronic Mail Distribution Oconee Nuclear Station Duke Energy Corporation Alicia Richardson Electronic Mail Distribution Licensing Administrative Assistant General Office James A. Kammer Duke Energy Corporation Design Engineering Manager Electronic Mail Distribution Oconee Nuclear Station Duke Energy Corporation Lara S. Nichols Electronic Mail Distribution Deputy General Counsel Duke Energy Corporation Robert H. Guy Electronic Mail Distribution Organizational Effectiveness Manager Oconee Nuclear Station David A. Cummings Duke Energy Corporation Associate General Counsel Electronic Mail Distribution General Office Duke Energy Corporation Terry L. Patterson Electronic Mail Distribution Safety Assurance Manager Duke Energy Corporation Division of Radiological Health Electronic Mail Distribution TN Dept. of Environment & Conservation 401 Church Street Kent Alter Nashville, TN 37243-1532 Regulatory Compliance Manager Oconee Nuclear Station Sandra Threatt, Manager Duke Energy Corporation Nuclear Response and Emergency Electronic Mail Distribution Environmental Surveillance Bureau of Land and Waste Management Judy E. Smith Department of Health and Environmental Licensing Administrator Control Oconee Nuclear Station Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Joseph Michael Frisco, Jr. Oconee Nuclear Station Vice President, Nuclear Design Engineering 7812B Rochester Hwy General Office Seneca, SC 29672 Duke Energy Corporation Electronic Mail Distribution Charles Brinkman Director M. Christopher Nolan Washington Operations Director - Regulatory Affairs Westinghouse Electric Company General Office Electronic Mail Distribution Duke Energy Corporation Electronic Mail Distribution David A. Cummings (acting)

Fleet Regulatory Compliance & Licensing (cc contd - See page 4)

Manager

T. P. Gillespie, Jr. 4 (cc contd)

County Supervisor of Oconee County 415 S. Pine Street Walhalla, SC 29691-2145 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

Letter to T. Preston Gillespie, Jr. from Rebecca L. Nease dated January 16, 2013.

SUBJECT: ERRATA OCONEE NUCLEAR STATION UNIT 3 - REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (RPS/ESPS)

DIGITAL MODIFICATION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000287/2012013 (ML12366A264)

Distribution:

J. Bartley, RII, DRP C. Rapp, RII, DRP G. Ottenberg, RII, SRI E. Eli, RII, SI M. Endress, RII, RI C. Evans, RII, EICS L. Douglas, RII, EICS RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource

UNITED STATES ber 31, 2012

SUBJECT:

OCONEE NUCLEAR STATION UNIT 3 - REACTOR PROTECTIVE SYSTEM/ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (RPS/ESPS)

DIGITAL MODIFICATION - U.S. NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000287/2012013

Dear Mr. Gillespie,

Jr.:

On November 21, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed an inspection at your Oconee Nuclear Station, Unit 3 reactor facility. The enclosed inspection report documents the inspection results, which were discussed with you and/or other members of your staff on October 9, 2012, and December 20, 2012.

The inspection was performed in accordance with Inspection Procedure 52003, Digital Instrumentation and Control Modification Inspection, and also focused on the list of recommended Site Inspection Follow-Up Items outlined in the RPS/ESPS Safety Evaluation dated January 28, 2010, (ADAMS Accession Number ML100220016). The inspection examined activities conducted under your license as they relate to safety, compliance with the Commissions rules and regulations, and with the conditions of your license. The team reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its Enclosures, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of the

3.8 Indication and Annunciation a. Inspection Scope The team reviewed procedures, performed walkdowns, and observed control room operations and testing; to verify proper indication and annunciation for system failures, and system bypass were functional, and met the licensing basis as stated in the SER.

b. Observations and Findings No findings were identified.

4OA6 Meetings, Including Exit Meeting Exit Meeting Summary The inspection team presented the inspection results to the staff during an exit with members of licensee management and staff on October 9, 2012. Additional follow-up in-office review was conducted by the inspectors through November 21, 2012. The team leader contacted Oconee licensing staff on December 20, 2012, to inform them that there would be no changes to previous conclusions. The inspectors asked the licensee if any of the material examined during the inspection should be considered proprietary and no proprietary information was identified.

ATTACHMENT: SUPPLEMENTAL INFORMATION Attachment