CP-201201408, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident

From kanterella
(Redirected from ML13009A269)
Jump to navigation Jump to search
Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML13009A269
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/27/2012
From: Madden F, Flores R
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201201408, TXX-12178
Download: ML13009A269 (7)


Text

I Enclosure 1 and 2 to TXX-12178 contains Security-Related Information Withheld Under 10 CFR 2.390 Rafael Flores Lumninant Power Luminant Senior Vice President

& Chief Nuclear Officer rafael.flores@luminant.com P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201201408 10 CFR 50.54(o Log # TXX-12178 November 27, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, DOCKET NOS. 50-445 AND 50-446, 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54 (f)

Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident

REFERENCES:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident; dated March 12, 2012
2. Letter dated May 31, 2012 from D. L. Skeen, USNRC, to A. P. Heymer, NEI, "Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286,

'Seismic Walkdown Guidance'"

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) staff issued a 10 CFR 50.54(f) letter to all power reactor licensees and holders of construction permits in active or deferred status (Reference 1). Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides Luminant Generation Company, LLC's (Luminant) 180-day response to Reference 1 for seismic walkdowns for Comanche Peak Nuclear Power Plant (CPNPP) Units 1 & 2.

For seismic Recommendation 2.3, (walkdowns), Enclosure 3, item 2 of Reference 1 requires that within 180 days of NRC's endorsement of the walkdown procedure (Reference 2), CPNPP submit its final response for the requested information including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the walkdown will be completed.

The enclosure to this letter contains CPNPP's final response to Reference 1, Enclosure 3, Recommendation 2.3, Seismic, consistent with the NRC-endorsed guidance (Reference 2).

Enclosure 1 includes a list of any areas that have not yet been inspected in Unit 1 due to inaccessibility. Luminant will complete the seismic walkdowns for CPNPP Unit 1 during 1RF16 in the spring of 2013 and submit a supplemental report by June 30, 2013.

A member of the STARS Alliance Callaway - Comanche Peak

  • Diablo Canyon . Palo Verde
  • San Onofre
  • Wolf Creek U-171-(

0 NL

U. S. Nuclear Regulatory Commission TXX-12178 Page 3 of 3 11/27/12 Portions of Enclosures 1 and 2, Seismic Walkdown Reports, contain Security Sensitive Material and are marked accordingly. contains new regulatory commitments made by CPNPP in this response.

If you have any questions concerning this matter, please contact Dennis Buschbaum at 254-897-5851 or dennis.buschbaum@luminant.com.

I state under penalty of perjury that the foregoing is true and correct.

Executed on November 27, 2012.

Sincerely, Luminant Generation Company LLC Rafael Flores By: f 2< T ,n .-*

/F~red W. Madden Director, Oversight & Regulatory Affairs

Attachment:

List of Regulatory Commitments

Enclosure:

1. WCAP-17685-NP, Comanche Peak Nuclear Power Plant Unit I Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Revision 0, November 2012.
2. WCAP-17686-NP, Comanche Peak Nuclear Power Plant Unit 2 Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report, Revision 0, November 2012.

c- E. J. Leeds, Director, Office of Nuclear Reactor Regulation E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak

Attachment to TXX-12178 Attachment to TXX-12178 List of Regulatory Commitments This communication contains the following new or revised commitment, which will be completed or incorporated into the CPNPP licensing basis as noted:

Number Commitment Due Date/Event 4527482 Luminant will complete the seismic walkdowns for 06/30/2013 CPNPP Unit 1 during 1FR16 in the Spring of 2013 and submit a supplemental report by June 30, 2013.

The Commitment number is used by Luminant Power for the internal tracking of CPNPP commitments.

Date: 11/26/2012 TXU - CPSES Page 1 of 4 Time: 16:11:29 COMMITMENT DATA FORM Report: PLCT0004 Commitment Type: REG Number: 4527482 Status: PEND Last Update Date: 11/26/2012 11:05:18AM 1.Commitment Detail Information Authority: NRC I Units: 2 Primary Org: LCPS Delete code:

Lic

Contact:

M4254

Subject:

1B One-Time Commitment lx Status: PND PND Milestone:

Sch'd Completion Date:

Req'd Completion Date: 6/30/2013 6/30/2013

Title:

180-DAY RESPONSE TO NRC RFI PURSUANT TO 10 CFR 50.54 (F) REGARDING THE

Description:

180-Day Response to NRC RFI Pursuant to 10 CFR 50.54 (f) Regarding the Long

Description:

180-Day Response to NRC RFI Pursuant to 10 CFR 50.54 (f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident.

Luminant will complete the seismic walkdowns for CPNPP Unit 1 during 1RF 16 in the Spring of 2013 and submit a supplemental report by June 30, 2013.

Comments:

II. Commitment Reference Information Source

Reference:

Date: 11/26/2012 TXU - CPSES Page 2 of 4 Time: 16:11:29 COMMITMENT DATA FORM Report: PLCT0004 Type: CR Num: CR-2012-005095 SRC LVL: ASSOC Sec:

Page: Issue Date:

Type: LTR Num: TXX-12-000178 SRC LVL: PRIMARY Sec:

Page: Issue Date:

ODen/Incorooratlna/Closlna

Reference:

Other

Reference:

Date: 11/26/2012 TXU - CPSES Page 3 of 4 Time: 16:11:29 COMMITMENT DATA FORM Report: PLCTO004 Commitment Type: REG Number: 4527482 Status: PEND Last Update Date: 11/26/2012 11:05:18 AM All commitment Information has been reviewed to be complete and accurate at this time except as marked.

Name(Please Print) Ext Department Signature Date Name(Please Print) Ext Department Signature Date RA review Signature Date CT Data Entry Initials Date

  • END OF REPORT *
  • Date: 11/26/2012 TXU - CPSES Page 4 of 4 Time: 16:11:29 COMMITMENT DATA FORM Report: PLCT0004 COMMITMENT NUMBER COMMITMENT TITLE 4527482 180-DAY RESPONSE TO NRC RFI PURSUANT TO 10 CFR 50.54 (F) REGARDING THE
  • END OF REPORT* *