SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 534 of 561 - Page 561 of 561
ML12355A791
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/26/2012
From: Miktus P
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-12-2266 SNCF164-RPT-01, Ver. 1.0
Download: ML12355A791 (28)


Text

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 eý' -P-1-:071- Sheet 1fIf Sau:Y9 NR] u[]

Seismic'Walkdown Checklist, (WC)

Eqtuipment ID No. Q1R43T504 Equip.,Class. 21 .

EquipmetDetscrii DIESEL GENERATOR 18 STARTING AIR RECIEVER 'ANK #2 Location: Bldg., DIESEL Floor'El. 155 Rooi, Area 0058, Maniufacturer,:Model, Etc.(optional ut riec6mmended) hns'tructiOns for Comipleting: Checklistý Th.is: checklist may be. used todocumnent hests ofthe: Senimic.Watkdon~ofan. i.emnit e*feuipment on the SWEL. The space below *each of the folowing questions may be-used toieCopd the results dojudgments and findings. Additional space is provided at the ,end'of this checklist for ddocue~nting', other commienits.

i, Is the anchorage configuration'verification requ:imd (i.e., is the item one, Y: 'NO*

,ofthe:50 ofSWEL itemstequiring suchv.erificatin)?

Reference SEWS package dated 4/8/g4q.

2. :Is the anchorage free of bent, broken, missingotr loose hardware? Y0 NO UOE N/AO 1.,

Is the.anch*oragefrele of 'corrosion:tatý-is more than mild suiface Y~O O /A oxidati6h?

4i Is the anchorage freeOof viib'le cracks ,in thbconirete:near**ie anchors? Ym N0 U-O[N/'AQ[

5. Isithe anchorage cofifiguration consistent-with plantdocumentation?i 01 uNOU NIAOJ (Note;,his:questi3on' 'ioily applies if .the itefi is one of the 50% fof which an anchorage configuration verification is required;)

,6. Based onihe above anchorage eval.ations, is te .anchorage free of YNo'UO potentially: adverse seisinic .conhditi6ns?

I'Enmerdiexquipment chiss naiiiefrom ApPýiidix B: C14i6sof.Fqupinn Page 534 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0

Sheet 2 off4 Statius: ,NO N[] U1]

Seismic Walkdown ,Checklist{(SWC)

Equipment IDNo. OIiR43TO .. Equip Classi ý1 E-uipment Description DIESEL GENERATOR 18 STARTING AIR RECIEVER TANK . .

7. Are softltargets freefrorimpact.by nearby.equipment or:structures? Y19: N Uo NiAO 8, Are overhead equipment, distribution systems, ceiling tiltes abd lighting, YO NO .0NAOý and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines hAveadequate flexib IIlity to avoid damnage? YN NO U.0 N/AO J0.

.0. Based on the above seismic intei actioneyaluations, is equipment free? Y0 NO-UO of potentiially adverse iseismic inter~action effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could, YIt NO UO adversely affect the safety functions of the equipment?

Comqmnts (Additiotial pages may be adde as necessary)

Egaluated'by,: LaUra Maclav-4,V CI- 1 Da~te.; 16~-V24 2 Page 535 of 561

A 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 536 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 537 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 s haeet.1 of' 4 i Statuis: Ye,' Nf L in Seismic Walkdown Checklist (SWC)

EB,.iiý'innt ID No. 6QiEI1MO V88:1. A Equip.,Class' v E4ihuiiienr Description CITMT'S;UMP TO IA,,RHIRpUmf Locanion: Blrdg. AUXILIARY flooti Elt 77 Roomind kea12 M ýnfactuter: Model, 8 tc. optiobna but recommnended)

Instructions for.Completing; Checklist

'this checklist may be tfsedto d6cumient the results, of the Seismic Walkdown of arijter ofequipiient onlihe SWEL The space below each of the following questionrs may be used to recoid the results ofjjudgments and ffihtfrngs, Additional space is provided at the end4 o*this diecklist for documenting other cowinents.

Anchorntie I. *headichrag, Is e configuiratnoni veiifi atio ii-nquired'(i.e.. is the item one: YO:NM of the 50% of SWEL items requiring such verifaibna . ...

2. Is the an* h6rfe fee of benit broken, missig 6r Ig oosehardware'? YO N0.:UF N/AW.,-,

/1/v -

3. Is the:anchorage-,free of'corTosion~ttiai;mifltaridld surface YD! Nn UDl N/A&'

oxidation'?'

4; Is the atchorage free of, visible cracksin the condrete neaifthe aIncho rs.? Yo, ND ULJ ,

5-I(Note:-Thiis the aichorageconifiguration consistent questdon onily.ap~plies withplanddcitmedtatibn? YE] NDl UDI NIA:E-i~fthe item i:S one of the 50%.Thr ..

which an atiiorag .onfiguration velificationi iSvrequire.)

6. Based on-the Aboie 'anchorage evaluations, is iýe anchoraige, free of Y~r14Di 00

.potentiially adversezse~ismic conditions?

Enter the equipment~class naiemefrom Appendix B: .Classcs of Bqtiipmellt.

Page 538 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0

<V Sheet 2 Of,ý 4,A' Stabus:. 4 ,Nr ur-Seismic Walkdown Checklist (SWC)

Equipmentt1)No. Q1I dMOV881!A* Equip.

Equipment]Descripfion CTMT_ SUMP- TO IAaRHR..PUMP Interaction Effects

7. Are soft targeis..freefiom impact:by nearby equipment'or structures? Y -NO UEJ N/AC An Y*NE]X UI N/AD and masonry block wal1f not liktly to'oliapse onto the .uifpment?

9, Do attached lines have adequate.flexibility to avoid d.namage? Y0'NO UD N/AO

10. Basedon the aboveseismic interactionezvaluations, is equipment free of poteintially adverserseeismiic ineraction effects?
Other Adverse Conditions 11, Have you looked for:and found no othler seismic.conditions:thatcouid :YE"Ž O] U-adaverselyaffect thlc sbf.ety fancti ons

-fti elq ipment.

C~omments (Additionalpages;may be added asinc r3ry)

________ f//~f('Y~! ~ (f/i (77)Wr f I ~(

t)

)b 4~ ~'4 ~/. lii Eva.umed <t7 V. ' 'r27't.r Date:

f~

Page 539 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 19P V

Page 540 of 561

A 0 ATTFACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 541 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 t- i.;ýl-Q 7J -/

Sheetio sftatu:ý ýYtDN I;El Seismic Walkdown Checklist (SWC)

-EquipmentD No. QIG3IHOOOIA Equip. C!ass!; 21 Equip*met Descriptiots SPENT FUEL HEA T EXCHANGERk.A Location: ,3Jdg. AUXILIARY FfrEl. 155 ýRoom, Area MNufacturer, Model, Etc. (optiotialbut recomiimended)

hstructions for Completing Checklist This Checklist maybe Used to doclment the rIi ults of the seiseiiei Wa)kdown of an item 6f1equiphInt on the SWEL TLhe space belowpeach of the following questions may beusJtdo r:cord the results ofjudginents and findings. Additional spaceicsprovide at ihend ofthis ýhecklist foi doculnentili,:other::omim;es.

Anchorage

1. cotifiguration verificationr equired (i.e., isthe iteirn one osfheanchorage of lhe 50% of SWEL items requiring sucih verifi(ation)?

2; tktheahuhorage free f,benit, broken, miisiing or ooseiardware?

NDI UD /A

'3. Is the ahchcifagk fireeof corrosion-that is m6ore:thaniild surfface oxidation?

Y DUD N/'A E

?

,:e!i!

4 ijlse-anchorage free of visible;cracks in th: concretle ear the anchors?

Yd ýND UDF N/A

5. [iShet nui6e p c'rifiguration coii~istent witt: niJj! d!ocumeniettioiu??

(Note: 'Tisquesion onlyv appies if the: itei:"; i *""of the form which an acoaeconfigurlation veIrification is rified.W Y NOUD1

6. Based on. theJabv anh0g elutosishe anchorage fre of.

ýpotPenifialv tyAdversesesecoiin?

nr 1hteq eipment Class uai}ne fmrmn Appendix t::Chistes of Equilpmenl Page 542 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0

~::j~

Sheetý2P 7:u XlN Status:U Us Sei sinic Walkd0.wn ~eCklist (SWC)

EquipmentAD No. QlG31HOOO1A Eti.Cas 21 Equipment. Description SPENT FUEL HEA-4T7 EXCHANGER IA .........

Int~eraction Effects.

es7.;* from impact by nearby equipment or structures?

Are soft targets:frce YDULJI4 8.; Are overleade~iipinent, ,dist ribution:systems;ceiling tilee'anid lighting, anid mas*ony b1ckwalils odt likely to colIapsc; onto the equipmeul .t?

Y/ IiUD N/AD

'9. Do I attachedlines Ia*ed ate flex~bih\iy to avoid damage?

I0. Based on he: above:sei§mic interac*tion cva;uati0ns, is equipmenl free of potentially adverse seismic interaction effects.

Oither AdversefConditions

'Have you looked for anfd found no 6tlier~scismic(onditionS that.could Yun D' UD ad~~ei'afect, thý afety-fwitindims of [tic equipment?7 comm uents (Additionalpages<my be added as necessary)*

Evaluated by:

i:<:-¸ ......

$/~1r IA A4~ ~- "'A l)ate: 1/. :1 Of Z r

Iz-Page 543 of 561

A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION fl Page 544 of 561

A 0 ATTACHMENT 3: SEISMIC WALKIDOVVN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 545 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SCF16-RPT01, ERSIN 1.

'1 Sheet fof3 Status:. Y* R' U0 Seismic Walkdown Checklist (SWG)

Equipment ID No.. QIG31P002B Equip. Clamss Equipment(Desciption.. 1B SFP PUMP Locadtion. Bldg. AUXILIARY Flobo'El.. 139 Room, Area _

Manufacturer, Model, Etc. (optibnalbut*iedommichded) __._._

Instructions for Completing Cheddist This checklismay be used to document the results of the Seismic Walkdowni ofan item of equipment on the SWEL The space below eachiof the foiowinng questions maybe used to reco he results ofjudgmebts and finidins Additional space is prwoiided at Uhe end of this cfi*ecklist for documentinm othierco6mments.

Anchorage

1. Is the anchorage configuration verification required (i e, is theitem one of the 50% of SWEL items: equiring such verification)?

~7i I 7(6' ~5~'4 k~. ~6 2; Is theanchorage free0f bept, broken, missingor loose hardware? YN2UMJ N-/AEJ 31.Is the anchorage free of corrosion ihat is more than mil dsurface wrq/kiVET F N/IAJý Oxidation?

4.ý Is the anchorage free of0visible cracks a teOconcrete near the anchoirs ,d< UD] N/AE1

5. Is the anchorage configuration consistent with plant documentation? YVD3 110,N/AED (Note: Thisquestiononlyappies ifth6 item is' on(d ofthe150% .for

-VIich an anchoragecon figuration verification is required.

6. Based on thelabove anchorage altuatiorns, .is the. acboragd free of Yk'ýND UcJ potentially ýUdvets6 seismic conditions?

'Enter the equipiMent cidssp~re~frb~m Aopendix B&Classespf Ettui ient.

Page 546 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTSNO CF4-T01VESN1.

Sheet +2of :3.:

:/ ; . .

Seismic'Walkdown Checklist.(SWC)

Equipment ID No. 01G31P0028 Equip. Class~ 5 Ecjuipment D&Jiiption IBSFP PUMP -~

,Iit~eraction Effects.

7. Are so6ft arig~ts:free from inipat :by nearby equipmenti or structures?-

Y/~ iDNA 8.+:Are o~verhead: equiipmien*t, d istri bution systeros, ceiling t{iles and: li ghting,.:

Sand :masonry: bl:ck w*alls =not liey......eotite qipef Y+N,iD N/AD

  • 9.Doabittached lines thave adequate flexibility to avoid :damage?

10fO. B]ased on the above seismic interction evaluations, is~eqUipmaent free

... o~fp6{dtenialiyad'e~rse s~ibfiiie ii teraction ieffect s?7]....:.........+

other. AdvergeCoiilitions:

I1[- Have :you lookedd for anid foundnho. oher* seismic conditions that: could, YEp4 DUD
Comam~enits (Adaition~al pages may: b~eadded~as necessary):

Date: _________

Page 547 of 561

A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 548 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Status; N U Seismic Wal.kdown Checklist (SWC)

Equipment.ID No. Q.1G3-1VOOiA -:Equip. Class'_o.

Fquipment[e .SFPPUiP scription !A SU . ISO.

Locaion: Bld'g. UXILIARY Floor El. 139 ...Room, Area 3AL_ .. ......... .

Manufacturer, Model, Etc. (optional but recommended) .

.:strtrctions for CompletingldCh cklst This checklist maybe used to document the resultsof the.Seismic.Walkdown of an item ofeequipment on the SEL The space below eachof the folldoing questions may be used to record theresults ofjudgents and findings. Additional:space is provided at.the end of this ýclecklist for documenting other comments

.Anchorage

1. Is the anchoragecon.figuration verification required,(i.e., is the it.m one of the,;5.0%of SWEL items equflring.,6ucb verificatibn)?
2. Is the anchorage free of bent, broken, nis'sing or 1ooge;hardwarV? YO NEI U01./

"A~1 ~ (0 Al POAJt~*~

3. Is theanchofage-free of cworsion*that is mrordthan, mild surface YEO :NE UE1 N/A[1-oxidafibn?
4. Is the anehorage free of visiblI 'rdcks in theconcrete near the anchors? NY NE: UE NIAL 5.- Istie anchorage contfidrumin consistent wdih plant documientation?z (Nd6e: This quesiion only applies if theitem i obne ofthe 50% for which an:,anchorage configuration yevrification is.required.)

YNEUE /rjO

6. Based on thd *abovez anTchorage evaluations, i th.eanchorage free of pdtentially adverse seismic conditions?

!Tntcr the e~ipipent class namc~fitin Aopcndix B,`Clhý,-,sof Equlipf~tw.

Page 549 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Ft SO,' ýý:

Sheet 2 of3 Status:

Seismicl Wailkdown, Checklist (SWC).

Equiiprtu6niD No'. 01,31 VOQIA _Equipl cla.sl 0 Equimpnilcnt Description IA SFP PUMP SUCTION JSO0 Interamico Effec ts

7. Are soft targets fee.:frin
  • impictnb~ne'rby eqtiipentiior;i. t.it*di§?

YN4IC U0 NIAC-3 8..Are overhead euipmdnt, distdtign sygteis, ceilin *tioes anhd ighting anfd masonyblock wallls nlotliketly to collapse ontolhe equipmeni.

9.D6 attached lines have aidequatefllexibilityto aivoidda ge 'fNEI [IC NýACI 10, Based on0the above seism'iiiteraction evaliations, is equipentffree tICU,1 of potentially adverse seisnmic interaction effe ts?. ..

Other. Adverse Conditions l1. Have you- looked for and founid no other seismic conditionst:h.atcould Y NC tI adversely affect the safety functionsýof the equipei...

~~onxnets Additional na~ge,;may b6,addeA~nd.

a s4mces 4:

Evahiiatd by: ' *w Date. //. .5f

(-4~,s It'i I Page 550 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 551 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sheet/ Of 3 Status: YL-LN Seismic Walkdown Checklist (SWC)

.Equipment I) No Q. G31,VOO3 . Equip. Class'. 0 Equipment D&scfiption- 1B'.SFPIHX OUTLET jSO Location: Bldg2. AUXILIARY Floor l. 155 . Room. Area Manufacturer, Model, Etc. (optional but recommended) . *. _____

Instructions for Compleiing. Cihecklist This checlistmay b, used to document the results of the Seismic Walkdown of an item f of equipmenion the SWEL The space betl(I'w ehc.icof£tIie 'ollowing questions may be used to re ord the re.sults ofjudgnlents ýand f'ndnms: Additional Spýtac..i*,provided at the end of this checklist for dociuntieng other. omments.

Anchonaee 2.Is tliehanh6orage ceon figuria.tiron vrmificatiorequired (i isthe itemrd oene YE3 NAý oflthe 50% ofS'WEL it~flns requli;lng such verfiflcation)?

2s Lst hePan'chorage,-- fr-eeof. bent, b roken, missing. or l6oos hardware? YO: Nn Un-

/4/~ I//J~

3 ls the anchorage free ofcorrosion that is*omre than mi]stsurfiae YDNED UD -N/Pc'-

A.Is tdhe hoigffrc16f\sible br en craksn the oticee near tliý An~hors

.YC NO UD-1 N/A 15th*adiic'oragoif'c is Liiratioh:c6nsistent with pian::d6cumdfttationz (NXote:This question unIV applies if the item k one of the 50%,ý foro which a!n anchoraue configrto Zeiicaini reqie.

gur<tiu %eikto i-} qui /ý 6.4Based6on the abovc anchoiage evaluations, is t he ancra.-gelfree of yt. 1iUOn potentially dvercesinic condiMtion. ?"

nerheij4Ipni Istuc finn ApotnndixB' Clwass afLquipmetui Page 552 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sheet1/2 f 3 Statu~s: Yu"Nn UFJI Seismic. WValkdown Checklist(SWC)

.IniteractiAn. Effects'

7. Arersoft targets free.from impact-'bynearby equipment-or stuctures? Y r- MJENAD 8,.. Are overhead equipment, -distribution.systems, ceiling tilesandlighting; Y jJýE UQ N/AEJ andi masonry blckw sinolik-ely tolcollapse onto, theequipment

'9) .Do attached lines have adequate flexibility to9ayoid damage?' NO UFJ N/AEI

10. Based'on the above seismic'int eraction evaluations, is equipment tqqfree ,Ur " .

o potentially adVdrse:seismic interattion .effects, Other Adverse C6nditioif 11, Have'you~looked for and found no other seismic conditions thatcould Y 1n *U[

adversely affMect tihlesaIfetyfu*nctinsof. the eqtipmet1i Comniments (Additioral'.pages :irn.,be added as nedessiry):

Evalu a t ed by: Date: -2' Page 553 of 561

0 ci, 0

c;,

0 (0

0 It a)

LI-0 z

0l

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 f/.~ 2-~ Sheet 1 Status:- Y U[I]

Seismic Walkdown Checklist (SWC):

EquipmentDNo. OIG31VOO4A tEquipj. 7assl, 0 Equitipmenit Descriptioin 1A4SP ýC6OOLINGOOPTOd SFýP PURIF WbNEST .S.

Loctarion: 11**g. AUXILIARY Floori EI. 139. Room Area ___.___.__.__ ........

.Manulfacturer Mdl-,ct IC. (optionlal but recomnmendisd lThsfutiond4S for ComIpICethig Checklist Thiseheclist may be used to docu*rniit the resultsobf ite Senismic Walkdovn ofan itLnem of equipme*nton the SWEflnThe spacedbelowN each ofpthe following questions mnayibe usfredtorcecord thersutofumeut an fnig.Additional space is provided at the enld of lhis checklist for ocmnigother oonuflents.

ghAna* e I.-Is the anchorage configuration :vriei-ttion req(ired (i.*e, is the item oneý YE-".N,-

,of the 50%,of S'WEL items, requiring.such verification)?

2. Is the anchordg free~of beilt brioken, missing; or 1odsc h~rdximi?7 YE NE VE Z~~V1/J~V~J 6A~ff 3.Is t he anchxorageý fre'e of corrosiofi that i s jnorci than miild surface YED NEIJE -U.N/AL 4-~

oxidation?

.4. is ie a-inchorage.,free of vis ible- ýdi&icks in :t.h6,cdncitefied'r the anchors? YET] NE .UEl N/,A~b<1 S. s the anchiorage configuration consistehit vithbplant docuimeutation') YAE NE1 UFE (Nopte: Thlis questihi nty' applies if the item is oneodf t~he 5%~

W~hichi an arcoaecnzuaii iiainis requfred.)

6. Basedl onteaoean.hrg val uations, is the anchorage free OF: ,YX ZNE-,UE potenatially, advlerse sei~smic condij.tio()ns?

, Enter, thecoquipmem:L~ class-nuiei frmpperdixiB13: eOf Fquipmmtn Page 555 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 status: YEqF-_< , ,.

Seismic Walkdown Checklis* (SWC)

Equipnae ~t ID No. 00G31 VOO4A Equip. Class* 0:

Equipment D scription lA 0SEPOOLIANG LOOP .~~~~.

TO SFP PURIF INLET ISO Interaction Effects 1, Are soft argets friee from ipaobyotnel equipmne obr structu/V co*ld[

P& res. UC-z NNEAu7

.. e. .4

<&"Aie ovrheaeq pment;'distribution sys .ils, ceiling tiles an d lighting, X*U*NJ UtC N/AC*[

and masonry block walls i.ot uikey~o collapse onto the equipnent?

..... ....  :/"f :7 rr"

9. Do; atta~l~d linies Ihave adequatd flinib li!.t to avoid damage? *0* 10] N/ACG
10. Based on the above seismic interaction .e.'a.u tions is eq.uipment free UD tJ of potentfially aiivers'e Seismic interaCtiOn: effects?

Other Adver se Condi'tions

11. I-ave you'I~ioked for: and found no othier seismnic: conditions that could NfE] U)0 adversely affeattLhe safety functions ofthe e*quipment?

Comments i (Ad ditinal pages may be added a. niecssary)

Evaluated by --SC <K .4t- *

! /K.4&"' :Dc*e:

/.6 Page 556 of 561

0 U) w 0

IL C/

z U) to (0

0 0-U')

LO cc a-U) w C,)

zwU

A 0 A'TTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 558 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 F I 5vqz-,7-111 Stlatuis: IjrrbU

SeiSmic WalkdOwn Checklist (SWC)

Equipfmentle D Noý .Q1G31VO06 EqbiiP.,Cfass' 0 ..........

'FI& mn Desrplo SFP COOLiNG LOOP RETURN (kEY Z-225)'

i Locatiob.- Bldg;..AUXIL1A.RY Floor E..39 i .. Roomi,.Area ......

Manufacturer, Mode1, Etc. (optional but recommnendbd)-

Instructions for Completing CheWklist

'himý chiecklist mayv be-tiscdto docuinent diveresults ofthe Seismic Walkdown of an iteniqf equipment on the SWEL. The spalcebel6w each of the following questions may be used to record the results ofjudgments and fiphifgs, Additi~oia!.space is provided atihe end of this checklist for documenting other cpoiunents.

iiiora I., Is' theaýncho~ragce- cdifigurationi verifibation,'required (i.e., is.~e ehi one YE]N~

of the 50% of SVEL items rcquiting~such verification)?

2. lsdtheeanchorage free of bent, br6ken, miissing or'loose hardware? YE]4 NOEI UE1, N/Am-
3. Is the anchoragefree of corrosi0n thatis mi.oie than mild surface YE]D NEI UED N/At oxidation?.:
4. sthelanchorage free of visible cracks ij the cgncrete n6er th*Onehors? YE] NQ] UE] N/A[UA-
5. Isthe anchorage configurati6n consigtct With plant documeiitation? YE] NE]. lIE]I&-

(Note: This qucstion:only applies if the item is one~of the 50% for which an anc.horage.onfiguration verificatio.n isrequired.)

6. Based oni the above anehorag e.evaluatibns,.is the anchorgefree of Y NE]UEl potentially adverse;seismic conditions?

Enter the equipment classnamne from Appendix B1:Classes of Equipment.

Page 559 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0

Shetl o1f 3 Status:ý Y1*LD UO, Seismic Wiakdown Checklist (swc)

Eqfilpmcn [D-No.i 1FP31 VOONG ,Equip. ClRas.'0.Y Fquipnmeiii Descriptionl SEPCOLINGmftLoOPkRETURN'KEY2?25)

Interaction Effects

7. Are s 'targets 1, :free by nelarbyequipment.

nrom a.pact or structiifre?i 1A-1 N/AC

$, Are overhead equipment, distrib .tion systems, ciling {iles-aild Ii*htiiýi, anid masonry blockýwalls notlikely to collapse ojt6ojtheequipment?

9. Do attacied lines have adequate flex"ibility to avoid damage? YEI 'NO, UCN/A 1'0. *Bsed'on the above seisminteraction*valuations, is equip.di*ht free of potentially advtcrs 's~iiid interddti6* effects?

Other Adverse Conditions 11 Havef,. .yo loo,.

ked for andt found no other seismic conditionsi at could 5 -C 'UC adverseyiatfiectl the Safety fetns of the eqaipdem?.

Commenits (!addiiional pagos mayv be added;as' neeegsiry)!

EvalU4ted, by: /Vl ,A I$ipf D 11Z Page 560 of 561

ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 t3 Page 561 of 561