|
---|
Category:Report
MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-21021 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 NL-19-0795, Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1.2019-05-31031 May 2019 Cameron Non-Proprietary Engineering Reports; ER-1180NP, Rev. 1, ER-1181NP, Rev. 1; ER-1182NP, Rev. 1; and ER-1183NP, Rev. 1. NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-17-1401, Post Accident Monitoring Report for 8 Train RVLIS2017-08-10010 August 2017 Post Accident Monitoring Report for 8 Train RVLIS NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML16103A5732016-04-21021 April 2016 Final ASP Analysis (LER 364-14-002) ML16103A5722016-04-21021 April 2016 Transmittal of Final Farley Nuclear Plant Unit 2, Accident Sequence Precursor Analysis ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15226A2292015-07-31031 July 2015 PWR Vessel Internals Program Plan for Aging Management of Reactor Internals NL-15-1507, J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals2015-07-31031 July 2015 J.M. Farley Nuclear Plant, Unit 1, PWR Vessel Internals Program Plan for Aging Management of Reactor Internals ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14098A4752014-04-16016 April 2014 Unit 1 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0342, Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites2014-03-31031 March 2014 Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 392 of 562 Through 429 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 62014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 543 of 562 Through Attachment 6 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 351 of 562 Through 391 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 313 of 562 Through 350 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 430 of 562 Through 462 of 562 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 2172014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 57 of 217 Through 107 of 217 NL-14-0249, Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 5622014-02-20020 February 2014 Joseph M. Farley, Unit 1, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 463 of 562 Through 500 of 562 ML14051A7342014-02-20020 February 2014 Updated Seismic Recommendation 2.3 Walkdown Report NL-14-0249, Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 22014-02-20020 February 2014 Enclosure 1, Updated Seismic Recommendation 2.3 Walkdown Report, Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 2 ML14071A0622014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 1 of 562 Through 46 of 562 ML14071A0632014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 7 Page 107 of 217 Through Attachment 8 Through End ML14071A0642014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 47 of 562 Through 90 of 562 ML14071A0652014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 91 of 562 Through 125 of 562 ML14071A0662014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 126 of 562 Through 160 of 562 ML14071A0692014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 234 of 562 Through 272 of 562 ML14071A0702014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 273 of 562 Through 312 of 562 ML14071A0762014-02-20020 February 2014 Enclosure 2, Updated Farley Unit 1 Seismic Walkdown Report for Resolution of Fukushima Near-Term Force Recommendation 2.3: Seismic Through Attachment 3 Page 501 of 562 Through 542 of 562 2024-06-14
[Table view] Category:Miscellaneous
MONTHYEARNL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion ML21214A3182021-08-0202 August 2021 301 Comments NL-20-0034, Inservice Inspection Program Owner'S Activity Report for Outage 1R292020-01-17017 January 2020 Inservice Inspection Program Owner'S Activity Report for Outage 1R29 NL-17-1713, Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure2018-04-0606 April 2018 Proposed Alternative GEN-ISI-ALT-2017-03, and HNP-ISI-ALT-05-07, Version 1.0 Service Water Evaluation for Code Case N-513-4 for Moderate Pressure, and for Higher Pressure NL-17-2061, Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B2017-12-14014 December 2017 Special Report 2017-002-00, Nonfunctional Radiation Monitor R-60B NL-16-2541, Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results2016-11-29029 November 2016 Notification of 10 CFR 26.719(c) 30-Day Report for False Positive Drug Test Results NL-16-0810, Submittal of Post Accident Monitoring Report2016-06-0909 June 2016 Submittal of Post Accident Monitoring Report NL-16-0683, Special Report No. 2016-002-00, Alternate AC Source Out of Service2016-06-0202 June 2016 Special Report No. 2016-002-00, Alternate AC Source Out of Service NL-16-0751, Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C2016-05-23023 May 2016 Special Report 2016-001-00, Nonfunctional Radiation Monitor R-60B and R-60C ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 NL-15-1489, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-12082015-08-17017 August 2015 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-1208 ML15182A1752015-06-26026 June 2015 Completion of Required Action by NRC Order EA-12-051 Reliable Spent Fuel Pool Level Instrumentation ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis NL-15-0418, Revision 6, Pressure Temperature Limits Reports2015-03-0505 March 2015 Revision 6, Pressure Temperature Limits Reports NL-15-0080, Special Report 2015-001-002015-01-26026 January 2015 Special Report 2015-001-00 NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 NL-14-1109, Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051)2014-08-26026 August 2014 Third Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) ML14128A0832014-06-0303 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 ML14101A1192014-04-16016 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident NL-14-0145, Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0)2014-02-18018 February 2014 Proposed Alternative for the Fourth Lnterval Lnservice Inspection (FNP-ISI-ALT-14, Version 1.0) NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B2013-09-30030 September 2013 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B NL-13-0954, Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance.2013-05-16016 May 2013 Proposed Path to Closure of Generic Safety Issue-191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. NL-13-0171, Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation. ML12355A7862012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 331 of 561 - Page 373 of 561 ML12355A7872012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 374 of 561 - Page 415 of 561 ML12355A7852012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 284 of 561 - Page 330 of 561 ML12355A7842012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 234 of 561 - Page 283 of 561 ML12355A7832012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 184 of 561 - Page 233 of 561 ML12355A7822012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 141 of 561 - Page 183 of 561 ML12355A7812012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 104 of 561 - Page 140 of 561 ML12355A7802012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 of 561 NL-12-2266, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 ML13004A2632012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 130 of 143 Through End NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Pag2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 71 of 161 - Page NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page2012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 1 of 161 - Page 7 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 12012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3: Seismic Walkdown Checklists, Page 59 of 561 - Page 103 NL-12-2266, Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 5612012-11-26026 November 2012 Joseph M. Farley, Unit 1, SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover - Attachment 3: Seismic Walkdown Checklists, Page 58 of 561 NL-12-2267, SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 462012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 46 of 46 ML13004A2612012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 431 of 467 Through Attachment 4, Page 63 of 143 ML13004A2602012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 373 of 467 Through Attachment 3, Page 431 of 467 ML13004A2582012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 307 of 467 Through Attachment 3, Page 372 of 467 ML13004A2572012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 232 of 467 Through Attachment 3, Page 306 of 467 ML13004A2562012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 177 of 467 Through Attachment 3, Page 231 of 467 ML13004A2552012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 123 of 467 Through Attachment 3, Page 176 of 467 ML13004A2542012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 ML13004A2532012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 1, Page 1 of 26 Through Attachment 3, Page 57 of 467 ML13004A2622012-11-26026 November 2012 SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4, Page 64 of 143 Through Page 129 of 143 ML12355A7952012-11-26026 November 2012 SNCF164-RPT-01, Version 1.0, Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 4: Unit 1-Area Walk-by Checklists, Page 118 of 161 - End 2024-06-14
[Table view] |
Text
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sthee i of, Stialtus: YxIi NN ulf]I Seismic Walkdown CheckIist (SWC)
EquipmentID Nob QIR43Eoo1A ._ Equip. Ciss' 20 . .. .
zquipment Description SEQUENCER BI Location: Bldg, AUXILIARY Floor EL Mg Room, Area : _ _ _ _ _..
Matiufacture, Model, Etc. (bptiona1 but i'ecommepded)
Instructions for Completing Checklistf ThIis checldist may be4u6u.d to document the resuilts of the Seismic WalkdoVii of an item- of eIjquipment onrthe, SX:EL. The space below each ofihe following questions imay be used to record the restihs of u'dgments and fidings. Additional spaceis proi ded atth*eend of ise.. .
.i~orage
- 1. Is the anciorage econfiguration verification required (ie., is the item one YN of the 50% of SWEL items requiring such verificaton)?
- 2. "Isthe anchorage free of beni, brokeni missing or loose hardware? Y'NOl UQI N/ACI
- 3. !:.the anchorage free of'corrosion that isinore than mildsurface Yfo NO UlD N/AD:
oxidation.?
4'. Is the anchorage free of visible cracks in the concrete near the: aichors? NID ND N`/AICE
- 5. Is the anchorage configuration consistent with plant documentation? Y59 NQ, UD -N/Ar (Note:'This question only applies if the *item is one qf the 50% for which an anchorage congfigYation1 verification i~srequired.)
- 6. j3ased' on the above anchorage evaluations, is:the, anchorage, free of UED rNE potentially adverse s.eismiccti.cdi.i~ons?
1Ent~er~the:equipmentn cass nanie:!romn A:ppendixB::.Ctasses of: Euipment:
Page 416 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 1$ Sheet 2 ofto.
Status: YEI NR1 Ut]
Seismic Walkdown Checklist (SWC)
Equipmeit ID No.. QR104EOo6A Equip. Clas.20ý EquilmYnnt-Descriptionr SEQU0ENCER BIF.-
Interaction Effectsi 7.. Aresoft, targets ýfree f'ron impac by nearby equipment or structures? YE NO UE N/AE.
8 distributon sys!tems, ceiling tiles and lighting, " nE UE] N/AE:
inid masomiy block wailslnot likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to rvoid dam ge? '4. NE VE] NIAE
- 10. Basedon the above seismic interactiona.evaluations, is equipment free YT N"E" UE of poteAtially adverses*eismic interaction effects?
Other*Adverse Conditions 1.1. Flave you looked for and found nouoiher seismic conditions that could. Y15 NEI UE_
ad~erselY affect thesa fety. uafieti.on f the equipmenit?:
Comments (Additional pages.maybe added as~necessary)
Evaluated by:. Aoxuv ak Date.. . .
6k iz Page 417 of 561
9 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION .010 Page 418 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 I
Page 419 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 420 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 "I'll,.I-_-q Page 421 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Shetof 4 86tatus: YNIZ NTF CID
-S~eismic Walkdown- Checklist (.SWC)
Equ~ipmnt ID No. Q1R43EOO2A,:. PKGý Eq ip. Class' 20ý FI-99
- Equipment DesecripiOqR.. SEQUENCER. BIF Aux RELrAY PANEL Locatos Blg-AXLIR FIobrEL. 1-39, .Roohii,..Area .-
13....
Ma1nuIfac tureCr, -Moýdel, Ftc. (optional but recommt ended) ......
Iastructions for Completing Checkist This checklistmay be used to document *hre res*ilts of the Seismic .Walkdown-ofan item ofequipment on the SWEI The space beylo each of Ihe followinhg qestions may be usedk. fsultsiofJudgment's ftorecordthe and
ýfinidings. Additional space is pro-vided at the end of this checklist fordomnigotecmets Anclioratge
- 1. Is the anchorage con figurat ion verification requircd ýLcisheimne Y NE the50% of SWEL ite ns reqoiiiril S6g ofdi suchvnficaLion)?
- 2. Is,the ainchiorage firee of beatit broken,; missingf or loose hiardware? YN. NE] CE]N/AP 3.ý'Islthe anchorage fr-ee of con'osikn hat is more than mild suiface YoIr-NE].0E N/Atl
. Il the aranchrage fr--,of visibi 0dcracks iilnte.coheyretdenear the anchors?, N] iEMNAE]
YI~
- 5. Is tlhe aelorageecihiguration consistent with plant docunentation? YaE NE] uE] N/AE]
(Note: T his questiori only applies ifthe itemh is one of the 50% for which ani anchorage con figuiration verificatiin is required.),
Reference SEWS IPackage dated 5124/94.
6, 1Ba sld on the above antchr*a&ee*eviwatit io;sis thieanehorage free df YN NE] tIE]
po-0tentiallynadverse seismic cond itnions?
Enterfu eui1nclaissnatlne.ftorn cqheme Appenidix B: Ctasscs of I-qipmx~t,,
Page 422 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sheet-2 of 4 Stntus: YO ND UD]
Seismic Waikdow n Checklist (SWC)
Equipment4D No. Q.R43EOO2A, PKG Equip. Class' 20 Ft-99 Equipment Desciiption: SEQUENCER BiFAUXRELAY PANEL Interaction Effects
- 7. Are soft target ree ftom i pact by nearhy equipment or structures? YZ NEI LT] NIA -j Three wo inch c'onduit.aresupported ontthe East Side:,f the cabinet The gap between the conduits and panel is about 1" but due to the rigid,conduit support (Welded to ao emnbedded wall plate), the cabinet.is judged to be free fror ipact during a seismic event.
- 8. Are overhead equipnnt, distribution systems,.ceiling files and lightiing, Y0 NEI UO',N/AE]
and masonry block walls not ike'ly to collapse onto thee quipment?
,9. Do attached, lines have adequate flexibility to avoiddamage? YZ: NIE] UQ N/A01
- 10. <Based on the above seismic interaetion evaluwa ons :equipment frec YN NEI V0 oft potenfially adverse seisnic interactionieffects?
Other Adverse Conditions 1 . Have you look-d for and found no hther sdisnic, Chnditi.on that could AY10, Nn] uV adversely affeci the :safety feo ns.of tl e equtipment?
- Comments (Additional pag es my be.dded as n ssary)
This package vw s originall signed on 8-28-12 but retyped for clarity on 10- 5-12.
Evaluated by: "°LauraMacla vb Telecon /0 Date: 8/28/12
'oirr A` Mullnix
, =". 4 q , i ... ... ...... ,,,;;
t 1ohL m 8/28/12 Page 423 of 561
- ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION .00 7~i~
Page 424 of 561
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-01, VERSION 1.0
-o Page 425 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 f'
Sheetj of Status: Y N] yEU[
Seismic Walkdown Checklist (SWC)
Equipment.ID No. QIR43T502 .. Equip. Class' 21
'E~i~sm~ip t Desc* iin FUEL OIL DAY TANK . .
Location: Bldg', DEEL . Floor E. 1_55 Room. Area i-Manufacturer, Model, Etc. (optional but recommended)
- pstrueltns for Completing Checklist This checklist may be used to docurnt the results of the Seismhic Walkdown of anitem of equipmeni on the SWELdThespace bdlW each1of the following questions niay be used to record thetfesults OfjudgxnIIts and findings. Additional space is provided at the end olthis echecklist for docum unt ng Other comments, Anchorage Sis the an chorage configurafion verification required (i.e.,s lthe:!itemr one YnNND of the 50% of SVEL items requiring such d,*erifisatio'i)?
- 1. Isthe anchorage free of bentj, broken mirssing or'loose hardware?' xr4i NV C-WAD
- 3. s: theanrchrage free of corrosion that is more than mnild s*4rface Y91 NEI UD N/AD didationi?
- 4. Is'the anchorage free of visibie: racks in the concrete nfear the anchorý? Yc ND UD N/ADl 5.; Istthe'anchoragebcufiguration econsistent with plant documen tation? YC .NO UD N/AD (Nbte:,This*question dnly applies if the itemh isbone of the60%1fo:
wh.hich.an acehorageconifiguration verification is requiredf)
- 6. Based on the :above anchorage evaluations; iS the anchorage free of YB "ND:lD po6tentiall*yadverse seismuic condiions"
':Eiitr heeipretctnam&froin Appenrdis13: Classes of EquipfiienLt Page 426 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 p4- iW~
Sheet 2Of,!,
tas:YINGU Sismi Walkdown ChecklIst (SW.C)ý Iiquipncnr4ID No, Q, R43,T502, Equip. Class!
iEquipmenit DescriptLiqn. FUEL: OILý D AY, TANK..,-
Interadion:Effects
- 1. Arc soft targets fl-ce fromi ipacdl~yn.earby qiret stuues?
t
- 8. Are overhead eqiuipmrne(h, distribitii(n svstems,'ceilinhgotisleai lightiiie aiid masonry b14ck walls not likely to collap-e ohtiotheoequi*iment, .
ýY9 NO, ULT ,N/Afl-
- 9. Do attached iiiies hage, aqd~ ateflekibhilityt avoid. dafiiagýe?
- 10. Based 'on tnhe above seisici nteraýtibh evaluations, equipmnft us free o~f poQtentially adverse seis~m.io teacioefcs Other Adverse Condiiowns
.11..1.ave.you looked foand ,couldfound no other seismic conditions hat NEIUEJ
/ N.
dvrlyaffect the~ Safetv functions Of the equipmenit?
Commhents (Additional pages may be added as ne essa4YI Evaha"JAIy I Z&2>
Page 427 of 561
9 ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-01, VERSION 1.0 Page 428 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
- \-I o O ..................
Page 429 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 SheetI o0.
status-:YvN
.Seismic Walkdown Checklist (SWC)
Fquxiprent fTDNo,. Q~RT50j' E~quip. Clas pf-.
Equipiment Description DIESEL GENERA TOR 1B STARTING AIR PECIEVER TANK Loc)Ftion: Bldg. DIESEL Floor El .155 Rom. Area '0058 M~inuiifacatur, Model, Etc. (optional buftrecomnmended), ._.......... ...
Iiitructions for Completing Checklist:
T!his .checkls .may be used. to document the results of the Sei smic WNlkdoW 1o f an-tem of qt ipment on the SWE., ThIe space below each of thefoilowidg*uestjohis may.bet sed~tj ei'cord theresults of]judgin IntS and findings. Additional~s pace. is provided!at the hd *of td inentig other comentS.
- 1. Is hle anchrage:cOnfiguration verification reqpired(i e.;isthciteiomne` YM No,
'of the 50*. oif SWELkiteins reqtilirkn9gucf1,rveeifictti51n . .
Reference SEWS package dated 2/94) ......
- 2hI thie anchorage: free of bcn{, .broken :,missing.&oriioseliardwarie?; Y0N UD: N/AD
- 3. ISt5a0i1 r-ge free ofcotrosion thatis more t'han mild ;surfqait Y0 NO UC N/AD 4.: Isthe iifih6rid free~of yisihleriacksslin tihe concreten 7earhenc hors? Y9 'NO LDO N/AD:
. Is the anichorage configu with plan cdfuntiod? Wadiononsistent (Note This qu*etitih 6niypon On l s it the itcIi:s de( of the 50"5o% for.
.*hidi ,inihanhrage configurationi vwrifican.itst reiquired.)
- 6. Bunseduon tIe above anchorage eva uatins, is the arnchorad :freeof. yo ND UD:
potc)tially idersc seismic Couditiolsns?
tuir~r Lh~eq men t~nsme horn Appeed~x Hi C ~sees of Eqo~trneo Page 430 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 I~-F- ~v' Sheet 20 f,1 8tat is: YN Nn iE)
Seismic Walkdown Checkiist'(SWC)
EquipmentiD ,No. Q1R43T503 Equip. Class,' I Equ!4ipment-Description, DIESEL GENERATOR 1B STARTING AIR RECIEV'ER TANK ..... ...
1interactionEIfects
- 7. Are soft targets free from impact by nearby, equipment or structures? YED N1 'UC3 N/ACl Small gap was noted4betWeen tank and cantilevered unistrut. This was previously noted in A-46 walkdowns and determihe'dJto be acceptable.
- 8. Are0overhead cýqupmemt; distribution systems, ceilinghles and lighting, and masonry block walls not likely to bollapse onto the equippment?
YZ NQ (uE N/Ar
- 9, Dowattached* lines have adequateflexibility to avoid dmnage? Y1 NtI UEC N/AC-
- 10. Based on, the above seismic interiction evaluations, is equipment.'firee YZ NC] IJC]
of potentially adverse seismuicinteraction effects?
Oither Adverse, Co~nditions
- 11. FHayie you, boked:t.*ir ai'dfouhd'.ho other seismic cbnditioms that dbild: Y, NClUC adversely alfe¢i the safetyv functions of'the: equipmentip?
Comnments (Additionfialpages nmaybe-added asieCe.sary)
Evaluated by: Laura Maclav 'It"p-t-0 a,*.2.... . Datei "7:-Z,.' = ...
'TerrEAlan MuItenI&
Page 431 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
&.i ,. t, Page 432 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0
ýl - Ini Page 433 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 lU,*
Sheetsi off, Statbs : N tLI seismic Walkdowri Chedklist (SWC):
Equipment.ID-No, QIV47COtI2B Equip: Classl' 9.
EqIiIie.it IDsc*ipti6oi-.AUX*LARY-BLDG3 *TRAIN BATTERY ROO EXHAUST FAN,
,Locat.Iion: B'ldg AUXILIARY FPloorEl, 175 Room,i;Area -050A.
Miufactuitdr&, M"dl, Etc. (6ptf6i*n*lbUte&bireo iidmed).
instructions fore-6mpletingCheckiist This dliecklist:may be usedr'to documentltlie results obfhe Seismic Walkdown of an item ofeqiipmenteon ihe SW,EL. Th!e spacebelow each of the folowing :questions may be used to record the resuits ofsjugment* and findings.Additinal space ispfovidedattheienid oftlhis c!ecklistyfor dbcumentinggother-comments.
Anchorate
- 1. Is the :anchorage configuration verification required (iLe., is the item one, YE N]
of the 50%ý of SWELTýitemns requiring suchl verification) 2, Is-the anchorage free of bent, broken, missing or loose hardware? NgýE: UE1 N/AD,
- 3. -Is the anchoragef ee of corrosion that is more than mild surface 'YI'NO UD1 N/AD oxidation?
- 4. Is the anchorage free.of.Visib]e cracksinthe concrete near.the anchors? YdN, v. -1 N/A-
- 5. Is the-anchorago configuration consistent withiplant documentation?
(Noteis: s.que ti;io bnlyoapicsifliiftlhe itemiis one of t....for 0%
-whiich maanchorage configuratibn..verification is required,):
6'. 'Based%onrthe above anchorage evaluations, is the anchorage free of YAD!-1 Un:
poleiiitilly adv&rse seismic conditions?
Enter the e class I~iipmebt name~froni Appendix B:.Classes of Equipment.
Page 434 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Sheet 2 of a; Stiatusý: Nl l Seismic Watkdown Checklist (SWC)i Eqipme: t ID kx Q1V470012B Equip. -CaSs
--9---... .. .....
Equipnent Des 'riptio:AUXILIARY BLDG7 a TRAiN BTTERYROOM 0 EXHAUST FAN:..
Interaction Effects 7 re softargets fee from impact by near y~equipmentior structures? NUD N/AD
- 8. A-re overhead Cquiipment,' distribuoion sysicirý ceibl")ngtles and lig~htingi, ND l:N D /1*,l
- and mas&onry block walls noct likely to col~lapse onto the equipmentr
- 9. Do a...i.d
.. line. have adeqluat floxi:..liitv n\.oiddarne.
ao Y4'.,ND] UE/A
- 10. ,Based on the above seismic' intcractioncvaluations,',iseqUiptmen free" YI'd LiD'v
.of~potnicz~iyi adverse scisrnic interatibhii efflects'?
.,Oiher Adverse Conditions 1I H*ive you looked for and found no 6otherseissmic conditioins that cold dY ND Uo adiverselyyaffect thCe sabfetyv functio6n1s- of, the equipment?
Ciomments (Additional:pugesiay'be'added as;fiecessar .
Eya... .a..ed by ) i::i :: ..J ... ... . . ..:' ...... .. .... .... . . . .......
D . ... .
Page 435 of 561
t7ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO, SNCF164-RPT-01, VERSION .10 Page 436 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Cz Page 437 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 438 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Status: N' NE Seismric Walkdown Checklist (SWC)
Equipment-D o. QY_2P5028 Equip'1C1)ss 5 Eqipment Descripton DIESEL GEN 'S FUEL OIL STORAGE TRANSFER0PUMP Location: Bldg. YARD FloorEl 155.. Room, Area ILt L*
Manufacturer, Mddel, Etc. (0ptionil but-recommended)
Instructions for Completing Checklist This checkli~st lay be used to document the -resultsof thc Seismic Walkdown ofanitem of equipment onw the SWEL. Th-file s ce ow each no following questionIs maybe used to record the results ofjudgments and findings. Ad ditiotui spa e is provided at the end of this checklist for-documenting other, comments, Anchorage 1, Is the~anchoragze co0figuration verification require4(i.e, is theilem one Y N of thli 0% ()f WEL item5 r0quig such verificationo)?
2I is the anchorage free of bent, broken, missing or lose hardware?
'YýJ',X UOo N/AO 3.Is .the anhIorage free:of corrosion thatis jmore than midk surface oxida~tion?
NO UO N/AO
- 4. Is the anchorage free of visible cracks iin the,concrete near th¢ anchors?.
YNtO UO N/ALI
- 5. Is the anchorage configuration consistent with pldat documentation?
(Note: Thi&.qtioxv u" onl aple fthe. item is one oie501 To'J Which amamehorage conralgultionVenificatio-.is required.)
o6 Based on te above anchorage evaluations, is the anchorage free of NOUZCN
....potex hi~di* ad elag*s~isinc conditlibns?... ..... .... .
'Entcr the equiipmentclaýss iname from Appendix B:, Classes of Equipment.
Page 439 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 2~- ~o3 Shiet:2ofG Statuýs: Yo ND: UO Seismic Walkdown Checklist' (SWC) 8Equipment ID No. _Q! Y52P5028 Eq Class' 5 Eqffiprnent Desdrption bIESLL GEN 1BFYFEL :OIL STORAGE TRANSFER PUMP-.1 InteractionEffects Tý.Ae soft, targets free fromaimpact by nearby equipment or structures? NE]E]NAE
.8. Are overhead eq pmedisribution-systems, ceilingties ,iandligting, Y* NE] UE- AN/A and iias*nry block wall's not likely to collapse onto'the equipment?
9 Do attached lines have adequate exibilityto avoid damage? Y61. NE] UM MAE],
- 10. Based on:the ab -e seismieraction evaldations,, i.seqIipment, ree Y.0 "No] U0E of potentially'aidverse seismic-in ei*teioneffects?'
Other Adverse Conditions
.. , H.ave you looked for andlf6und no other seismic conditions that could Yt NO] UO adversely affect the safety frnctionsosf the equipment?
Conimen6itS (dditionai paýgeszmay bez aaded as necessary)'
E~valuated hv: Nrk(UU0iYY\týQTL %li (1,' wci. 'M L (16LI0
'J.
A ate. .. _
i~ .M KA Page 440 of 561
O ACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 Page 441 of 561
OIACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-01, VERSION 1.0 Page 442 of 561
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-01, VERSION 1.0 I
FHO3 Page 443 of 561
0 w
9 Co z
(,
d z
Lo 0
a-LU 0
w)
IU 0) 0
-J