PNP 2012-107, Withdrawal of Proposed Alternative - Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW136

From kanterella
(Redirected from ML12347A159)
Jump to navigation Jump to search

Withdrawal of Proposed Alternative - Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW136
ML12347A159
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/11/2012
From: Gustafson O
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
PNP 2012-107
Download: ML12347A159 (2)


Text

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

27780 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 Otto W. Gustafson Licensing Manager PNP 2012-1 07 December 11, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Withdrawal of Proposed Alternative Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW 136 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

1.

Entergy Nuclear Operations, Inc. letter, PNP 2012-087, Proposed Alternative Request for Relief from Immediate ASME Code Flaw Repair of Service Water System Manual Valve MV-SW 1 36, dated October 30, 2012 (ADAMS Accession Number MLI 2305A362)

Dear Sir or Madam:

Pursuant to 10 CFR 50.55a(a)(3)(ii), Entergy Nuclear Operations, Inc. (ENO) requested NRC approval of a Request for Relief for a Proposed Alternative for the Palisades Nuclear Plant (PNP)(Reference 1). The request for relief was submitted because a through-wall flaw was discovered on September 20, 2012, in a service water system, 4-inch cast carbon steel valve body within an American Society of Mechanical Engineers (ASME) Class 3 system. Upon discovery of the through-wall flaw, ENO performed an operability evaluation of the condition, and determined that the valve continued to be capable of performing its required safety functions and was not susceptible to sudden or catastrophic failure.

Subsequent to the submittal of the request for relief, on November 6, 2012, ENO replaced the valve with the through-wall flaw during an unplanned plant outage. Review and approval of the relief request is no longer needed. Therefore, the relief request is being withdrawn. The three commitments submitted with the relief request were completed upon replacement of the valve.

The aforementioned operability evaluation conducted for the through-wall flaw addressed valve operability from the time of flaw discovery until the valve was replaced.

PNP 201 2-1 07 Page 2 This letter contains no new commitments and no revisions to existing commitments.

Sincerely, owg/jse cc:

Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC