12Q0108.10-R-002, Revision 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Braidwood Station, Unit 2. Part 2 of 5
ML12339A225
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/16/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-159 12Q0108.10-R-002, Rev 0
Download: ML12339A225 (110)


Text

Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01JB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL ROOM HVAC SYST LOCAL CONT PANEL ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-26 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC01JB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL ROOM HVAC SYST LOCAL CONT PANEL ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Fire protection piping is well-supported.

9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-27 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVCOIJB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

CONTROL ROOM HVAC SYST LOCAL CONT PANEL ASMBLY Photos UL;Vuljt$

f-31-IZ uUz UV(UU1jb (-u1-12 Uuu C-28 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC02FA Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL RM REC CHARCOAL FILTER A TRAIN ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Welded to beam at top and along bottom.Yes C-29 I Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC02FA Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL RM REC CHARCOAL FILTER A TRAIN ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Very robust piece of equipment Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-30 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC02FA Equipment Class: (10) Air Handlers Equipment

==

Description:==

CONTROL RM REC CHARCOAL FILTER A TRAIN ASMBLY Photos OVC02FA (NP-6695) 7-31-12 061 OVC02FA 7-31-12 057 C-31 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Enhlinm~nt flqr~rintionn OVC02FA (10) Air Handlers CONTROL RM REC CHARCOAL FILTER A TRAIN ASMBLY OVC02FA 7-31-12 058 OVC02FA 7-31-12 060 C-32 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC02FA Equipment Class: (10) Air H=Eauipment

==

Description:==

CONTROl andlers L RM REC CHARCOAL FILTER A TRAIN ASMBLY OVC02FA7-31-12 059 C-33 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC16J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

MCR U-2 HVAC START PNL Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 463.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments..

Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-34 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC16J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

MCR U-2 HVAC START PNL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Ladders are chained in ladder storage area.9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-35 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: OVC16J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

MCR U-2 HVAC START PNL Photos UVL;1(5J (NF-5595) 1-31-12 U29 OV(;16J 7-31-12 028 C-36 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005C Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

SIG 2C FLOW CONT VLV ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage.free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Instrument is mounted on rack 2PL84JB which is well-anchored Not Applicable Not Applicable Not Applicable Not Applicable Yes C-37 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005C Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

S/G 2C FLOW CONT VLV ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Adequate clearance with adjacent valves 8: Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-38 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005C Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

S/G 2C FLOW CONT VLV ASMBLY Photos ZAt-UUOU 6-1 -1 Z AM UJU C-39 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005G Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

S/G 2C FLOW CONT VLV ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable 6.. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-40 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005G Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

S/G 2C FLOW CONT VLV ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Handwheel for valve 2AFOO5H is less than 1/8" from the actuator of valve 2AFOO5G. Piping is observed to be well-supported (lateral movement is limited and impact would be to rugged part of valve).IR 1396037 written documenting engineering review of the seismic movements.

Due to the relatively small displacements and the nature of the contact (hand wheel to air actuator) such contact will not result in valve assembly distortion that will challenge the function of the valve to open.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am C-41 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005G Equipment Class: (7) Fluid-Operated Valves Equipment

==

Description:==

S/G 2C FLOW CONT VLV ASMBLY Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-42 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF005G Equipment Class: (7) Fluid-C Fniiinmnnt I)PAwrintinn:

S/G 2C FI)perated Valves LOW CONT VLV ASMBLY ZAt-WUU 0-1-1Z AM UJ(C-43 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF006A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoracie

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-44 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF006A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and. lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

On same piping as 2AFOI7A Pipe and valve are well-supported Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-45 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF006A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY 2AF006A (AWB -BOLT CORROSION OK) 8-1-12 AM 034 C-46 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF006A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion:

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY 2AF006A 8-1-12 AM 032 C-47 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF017A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-48 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AFO17A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block Walls not likely to collapse onto the equipment?

Cable trays are well-supported

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is on same pipe as 2AFOO6A Valve has nearby vertical and lateral supports Valve operator is near WS piping but is well-supported so not a seismic concern Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-49 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF017A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

AUXILIARY FEEDWATER PMP 2A SX SUCT VLV ASMBLY Photos 2AF017A 8-1-12 AM 025 C-50 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01EA-A Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY 1 AUXILIARY FEEDWATER PUMP Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-O-3322D09 Revision V 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-51 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01EA-A Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY 1 AUXILIARY FEEDWATER PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-52 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01EA-A Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY 1 AUXILIARY FEEDWATER PUMP ZA1-U11bA-A US-1-12 AM U2Z$ZAI-UILA-A 6-1-12 AM UZ4 C-53 Braidwood Station Unit 2 12QO108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AUX FEEDWATER PUMP 2B STARTUP PANEL ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-O-3391P Revision M Weld exceeds drawing requirements

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-54 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AUX FEEDWATER PUMP 2B STARTUP PANEL ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction, effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am See AWC 24 for discussion on DO site glass Evaluated by: Marlene Delaney. Date: 10/1/2012 Philip Gazda 10/1/2012 C-55 Braidwood Station Unit 2 12QO108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AUX FEEDWATER PUMP 2B STARTUP PANEL ASMBLY Photos 2AF01J (AWB -DO SITE GLASS OK) 8-1-12 AM 021 2AF01J (AWB -DO SITE GLASS OK)8-1-12 AM 022 C-56 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:

AUX FEEDWATER PUMP 2B STARTUP PANEL ASMBLY 2AF01J 8-1-12 AM 018 2AF01J 8-1-12 AM 020 C-57 Braidwood Station Unit 2 12Q0108.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01J Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

AUX FEEDWATER PUMP 2B STARTUP PANEL ASMBLY 2AF01J8-1-12 AM 019 C-58 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP AUX FEEDWATER, MOTOR DRIVEN ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1221 Sheet 2 Revision AD Detail 56A Not that bolt diameter at wall was not measured due to location but quantity verified.

Bolts same size as side that was measured.6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-59 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: FIN U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP AUX FEEDWATER, MOTOR DRIVEN ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

No structural/seismic issues Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am C-60 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: MZ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP AUX FEEDWATER, MOTOR DRIVEN ASMBLY Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 Photos 2AF01PA 8-1-12 AM 026 2AF01PA 8-1-12 AM 027 C-61 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP AUX FEEDWATER, MOTOR DRIVEN ASMBLY 2AF01PA 8-1-12 AM 028 2AF01PA 8-1-12 AM 029 C-62 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA-A Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

AUX FEEDWATER PUMP 2A AUX LUBE OIL PUMP Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora-ae

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note:.This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Pump is mounted on skid of horizontal pump 2AFOIPA See SWC for 2AFOIPA for anchorage verification of skid 2AFOIPA-A is well-anchored to skid Yes C-63 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA-A Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

AUX FEEDWATER PUMP 2A AUX LUBE OIL PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-64 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AF01PA-A Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

AUX FEEDWATER PUMP 2A AUX LUBE OIL PUMP Photos zA-UI-A-M 0-l-il AM UJU 2AF01 PA-A 8-1-12 AM 031 C-65 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP13E Equipment Class: (4) Transformers Equipment

==

Description:==

EQ UNIT SUBSTATION 232X TRAN 480V ESF Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 426.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-339 IF Revision AN Weld exceeds drawing requirements

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-66 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP13E Equipment Class: (4) Transformers Equipment

==

Description:==

EQ UNIT SUBSTATION 232X TRAN 480V ESF Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead'equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls Well-supported HVAC and cable trays 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/31/12 pm, Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-67 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP13E Equipment Class: (4) Transformers Equipment

==

Description:==

EQ UNIT SUBSTATION 232X TRAN 480V ESF Photos 2AP13E 7-31-12 068 2AP13E 7-31-12 069 C-68 Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2AP13E (4) Transformers EQ UNIT SUBSTATION 232X TRAN 480V ESF 2AP13E 7-31-12 070 C-69 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP22E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

480V AUX BLDG ESF MCC 231X3 ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 383.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoracqe

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-70 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP22E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

480V AUX BLDG ESF MCC 231X3 ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead cable trays are well-supported.

Seismic block walls.9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/1/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-71 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2AP22E (1) Motor Control Centers 480V AUX BLDG ESF MCC 231X3 ASMBLY Photos ZAVZZL Ui-1 -1 Z AM U43 2AP22E 5-1-12 AM 044 C-72 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP27E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X2 ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 426.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to.record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM and 20E-O-3391AT Revision V Drawing specified weld of 1 1/2" at 8 while actual weld is 2" at 9. The percentage of weld required per the drawing equals 1.5/8*100%=

18.75%The percentage of actual weld equals 2/9*100%=22.22%

which is larger than the amount required per the drawing therefore it is acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-73 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: FT N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP27E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X2 ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Cable trays are well-supported

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm C-74 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP27E Equipment Class: (1) Motoi Equipment

==

Description:==

EQ 480\r Control Centers AUX BLDG MCC 232X2 ASMBLY Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 Photos"ZAI-Z I tO t-Z-1Z U.513 C-75 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP27E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X2 ASMBLY 2AP27E 8-2-12 038 C-76 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP30E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG ESF MCC 231X5 ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 426.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM Drawing specified weld of 1 1/2" at 8 while actual weld is 2" at 9. The percentage of weld required per the drawing equals 1.5/8*100%=18.

75%The percentage of actual weld equals 2/9*100%=22.22%

which is larger than the amount required per the drawing therefore it is acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-77 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP30E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG ESF MCC 231X5 ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls Well-supported cable tray above Adjacent fire protection line is well-supported

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am C-78 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP30E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG ESF MCC 231X5 ASMBLY Evaluated by: Marlene Delaney Date: 10/1/2012 62' " Philip Gazda 10/1/2012 Photos 2AP30E (AWB- HYDROGEN LINE) 8-2-12 035 2AP30E 8-2-12 032 C-79 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP30E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG ESF MCC 231X5 ASMBLY 2AP30E 8-2-12 033 2AP30E 8-2-12 034 C-80 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP32E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X5 ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 426.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Y of SWEL items requiring such verification)?

es 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4ý Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM Drawing specified weld of 1 1/2" at 8 while actual weld is 2" at 9. The percentage of weld required per the drawing equals 1.5/8*100%=18.

75%The percentage of actual weld equals 2/9*100%=22.22%

which is larger than the amount required per the drawing therefore it is acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes C-81 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP32E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X5 ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Cable tray above is well-supported Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am C-82 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP32E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X5 ASMBLY Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 Photos 2AP32E 8-2-12 028 2AP32E 8-2-12 029 C-83 Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP32E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

EQ 480V AUX BLDG MCC 232X5 ASMBLY 2AP32E 8-2-12 030 2AP32E 8-2-12 031 C-84 Braidwood Station.Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP38E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

ASSY -480V AUX BLDG MCC 233X1 Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 346.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-0-3391C Revision BM Weld exceeds drawing requirements

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-85 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP38E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

ASSY -480V AUX BLDG MCC 233Xl Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?SX Drain down equipment box is approximately 9" from back of panel. IR 1396872 generated to have equipment moved.Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: .Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-86 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP38E Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

ASSY -480V AUX BLDG MCC 233X1 Photos 2AP38E 8-2-12 060 2APF38L 8-2-12 061 C-87 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2AP38E Equipment Class: (1) Motor Control Centers Eauipment DescriDtion:

ASSY -480V AUX BLDG MCC 233X1 2AP38E 8-2-12 062 C-88 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

2A COMPONENT COOLING WTR PUMP ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1229 Sheet 4 Revision U 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-89 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

2A COMPONENT COOLING WTR PUMP ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls Overhead components are well-supported

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-90 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2CC01 PA (5) Horizontal Pumps 2A COMPONENT COOLING WTR PUMP ASMBLY Photos 2LUU1 i- A U-2-12 U4U AAtU1 VA t3-2-12 041 C-91 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PA Equipment Class: (5) Horizontal Pumps EauiDment

==

Description:==

2A COMPONENT COOLING WTR PUMP ASMBLY 2CC01 PA 8-2-12 042 C-92 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 4 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PB Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

EQ MOTOR COMPONENT COOLING PMP 2B Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Y of SWEL items requiring such verification)?

es 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1220 Sheet 4 Revision U 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes C-93 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 4 Status: Mi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PB Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

EQ MOTOR COMPONENT COOLING PMP 2B Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: Marlene Delaney Date: 10/1/20.12 Philip Gazda 10/1/2012 C-94 Braidwood Station Unit 2 1200108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PB Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

EQ MOTOR COMPONENT COOLING PMP 2B Photos 2CC01 PB (AWB -CLEARANCE T1 MAbONRY WALL) 8-2-12 046 ZUkCU1 1-b (NP--bb~b) 85-2-1 2 U4b C-95 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 4 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC01PB Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

EQ MOTOR COMPONENT COOLING PMP 2B 2CC01PB 8-2-12 043 C-96 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: LI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC9412A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CC FROM RH HX 2A OUTLET ISOL ASMBLY Project: Braidwood 2 SWEL Location (BIdg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-97 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC9412A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CC FROM RH HX 2A OUTLET ISOL ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

No structural/seismic issues Comments Valve is located above 2A Residual Heat Exchanger Room and 2A Safety Injection Pump Room. Visual from step ladder.Seismic walkdown team M. Delaney & P. Gazda 8/2/12 pm Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-98 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CC9412A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CC FROM RH HX 2A OUTLET ISOL ASMBLY Photos ZU(U9412A 6-2-12 U52 C-9§ Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP,2A CENTRIFUGAL CHARGING ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing M-1220 Sheet 2 Revision W 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-100 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP,2A CENTRIFUGAL CHARGING ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

All overhead piping and components are well-supported.

Block walls in area are seismic.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-101 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP,2A CENTRIFUGAL CHARGING ASMBLY Photos 2.;VO1 PA 7-30-12 AM 001 Z2;VU1PA 7-30-12 AM 002 C-102 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP,2A CENTRIFUGAL CHARGING ASMBLY 2CV01 PA 7-30-12 AM 003 2CVO1PA 7-30-12 AM 015 C-103 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP,2A CENTRIFUGAL CHARGING ASMBLY 2CV01PA 7-30-12 AM 016 C-104 Braidwood Station Unit 2 12Q01 08.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA-A Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP, CNTRFGL CHG AUX OIL PP Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

Mounted to skid.2. Is the anchorage-free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

See 2CVO1PA SWEC for anchorage check.C-105 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV01PA-A Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

PUMP, CNTRFGL CHG AUX OIL PP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?I.Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

See 2CVOIPA for notes.Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-106 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment

==

Description:==

2CV01 PA-A (5) Horizontal Pumps PUMP, CNTRFGL CHG AUX OIL PP Photos C-107 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet I of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV02SA Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

2A CV PUMP GEAR OIL COOLER Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

Mounted on skid see 2CVOIPA.2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: No This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

See 2CVOIPA for notes C-108 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CVO2SA Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

2A CV PUMP GEAR OIL COOLER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012'Philip Gazda 10/1/2012 C-109 Braidwood Station Unit 2 12Q01 08.1 0-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV02SA Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

2A CV PUMP GEAR OIL COOLER Photos 2UVU2,A (-3U-12 AM 0U6 C-110 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet I of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV112D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Not Applicable Not Applicable Not Applicable Yes C-111 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No:: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV112D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

high in overhead, partially obstructed view due to other components Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-112 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV1 12D Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Photos ZLIVII "izu I-JU-'iz AMI U40 C-113 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-114 Braidwood Station Unit 2 12Q01 08.1 0-R-002 .Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

10-21-12:

Per IR 1429477: "During Fukushima walkdown of valve 2CV1 12E to verify closure of an IPEEE outlier for clearance between operator of the valve and existing structural grating it was found that in the cold position there is a 0" gap between the valve operator and grating." The grating is in contact with the valve yoke however the valve is rugged and it is unlikely that damage would result from impact with the grating.IR 1429477 generated to address this issue.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is partially obstructed due to other components.

Subsequent walkdown to be performed.

Walkdown performed on 10/21/12:

results documented in Question 7.Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Walkdown performed on 10/21/12 by Jim Griffith and David Carter to verify closure of an IPEEE outlier for clearance between valve yoke and existing platform grating.C-115 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV1 12E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY Evaluated bv: Marlene Delanev Date: 10/1/12..........

j-Philip Gazda 10/1/12 P&EA4Z David Carter 7 10/22/12 nes Griffith 10/22/12 Photos 10-21-12 299 10-21-12 300 C-1 16 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV112E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment Descriotion:

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05O I ASMBLY 10-21-12 301 10-21-12 303 10-21-12 304 C-117 Braidwood Station Unit 2 12QO108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV1 12E Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment DescriDtion:

RWST TO CHG PMPS SUCT VLV C/S AT 2PM05J ASMBLY'J( ;,VI V.11- IAIUUMI -N' I AIP( :M11I IPI'.l,.4 1 aA~R []-%I 2CV1 12E 7-30-12 AM 050 C-1 18 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8105 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 375.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoracie

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-119 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8105 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead components well-supported

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Valve is well-supported, near Penetration 71 Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-120 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8105 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Photos 2CV8105 8-2-12 020 C-121 Braidwood Station Unit 2 12Q01 08.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8106 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 375.00 ft, ALL Manufacturer/Model:

Instructionsfor Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note:*This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-122 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8106 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Rugged and well-supported Boric acid on adjacent valve 2CV-8402B, equipment operator notified.

Not a seismic/structural concern.Comments Seismic walkdown team M. Delaney & P. Gazda 8/2/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-123 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8106 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CHG LINE CNMT ISOL VLV C/S AT 2PM05J ASMBLY Photos 2CV8106 8-2-12 021 C-124 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8110 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CV PMP MINIFLOW ISOL VLV C/S AT 2PM05J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoracie

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2.. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-125 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8110 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CV PMP MINIFLOW ISOL VLV C/S AT 2PM05J ASMBLY Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse-onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions

'of the equipment?

well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-126 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8110 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CV PMP MINIFLOW ISOL VLV C/S AT 2PM05J ASMBLY Photos 2CV8110 7-30-12 AM 042 2UV1 107-30-12 AM 041 C-127 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 3 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8804A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RH HX 2A TO CV PMP SUCT ISOL VLV; C/S AT 2PM06J ASMBLY Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 364.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-128 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8804A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RH HX 2ATO CV PMP SUCT ISOL VLV; C/S AT 2PMO6J ASMBLY Interaction Effects 7., Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lightirng, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Well-supported pipe Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 am Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-129 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2CV8804A Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

RH HX 2A TO CV PMP SUCT ISOL VLV; C/S AT 2PM06J ASMBLY Photos ZUVM3U54A 1-3U-12 AM U39 2(LVtI04A 7-3U-12 AM 040 C-130 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 1 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2DCO1E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 211 DIV. 21 Project: Braidwood 2 SWEL Location (Bldg, Elev, Room/Area):

Auxiliary, 451.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Drawing 20E-O-3391BG Revision B 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-131 Braidwood Station Unit 2 12Q0108.1O-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 2 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2DC01E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 211 DIV. 21 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic block walls in area, Open S-hook on one chain for east-west light fixture just inside the room. IR 1395456 was written. Other chain does not have open hook so light Would not fall.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic walkdown team M. Delaney & P. Gazda 7/30/12 pm Evaluated by: Marlene Delaney Date: 10/1/2012 Philip Gazda 10/1/2012 C-132 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 3 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2DCO1E Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

125V BATTERY 211 DIV. 21 Photos 2DCO1E 7-31-12 001 21JUUh t-~31-1Z UU2 C-133 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 4 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2DCO1E Equipment Class: (15) Batti Equipment

==

Description:==

125V BA eries on Racks TTERY 211 DIV. 21 2DC01E 7-31-12 003 2DC01E 7-31-12 004 C-134 Braidwood Station Unit 2 12Q0108.10-R-002 Rev. 0 Correspondence No.: RS-12-159 Sheet 5 of 5 Status: M N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2DCO1E Equipment Class: (15) Batteries on Racks Eauibment

==

Description:==

125V BATTERY 211 DIV. 21 2DCO1E 7-31-12 005 C-135